83 Thompson Street
Staten Island, NY 10304BBL 5-00524-0048Map
Owner of record: Canterino , Diane
83 Thompson Street is a walk-up apartment building built in 1977 in Staten Island, 10304. It has 4 residential units across 2 floors. The owner of record is Canterino , Diane. HPD has recorded 399 housing violations here, most recently on May 7, 2026. 32 of the 50 most recent violations are still open.
- HPD violations
- 399
- DOB violations
- 3
- ECB violations
- 1
- HPD complaints
- 437
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 399
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Mar 22, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective connection at wasteline at sink in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Mar 22, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet floor at north wall in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Mar 22, 2026 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by the method of reglazing in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2026 · Apt 1L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from north located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2026 · Apt 1L
Open — Nov sent out
Show 40 more ↓
- BHazardous
Replace with new the missing base cabinet door and drawers at north wall in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2026 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective base radiator cover at east wall in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and at south wall in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Replace with new the missing base radiator cover at west wall in the 3rd room from north located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Replace with new the missing entrance door at north wall in the 5th room from north located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2026 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and at ceiling in the 4th room from north located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Replace with new the missing base radiator cover at south wall in the 5th room from north located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective entrance door frame at north wall in the 5th room from north located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by the method of reglazing in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Closed — Violation closed - BHazardous
Replace with new the missing base radiator cover at west wall in the 3rd room from north located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the bathroom located at apt 1l, 1st story, 1st apartment from west at north original violation 18581911 issued 20-jan-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jan 20, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls in the 3rd room from north located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall, west wall, south wall and at ceiling in the 5th room from north located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 5th room from north located at apt 1l, 1st story, 1st apartment from west at north
Jan 20, 2026 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at entrance at public hall, 1st story
Dec 8, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective entrance door lock in the entrance located at apt 2r, 2nd story, 2nd apartment from west at north
Dec 2, 2025 · Apt 2R
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in wash basin drain pipe in the bathroom located at apt 2r, 2nd story, 2nd apartment from west at north
Dec 2, 2025 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance at public hall, 1st story
Nov 30, 2025
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Nov 14, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of slide bolt with eye capable of being pad locked installed at door at south in the entrance located at apt 1l, 1st story, 1st apartment from west at north
Nov 14, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from north located at apt 1l, 1st story, 1st apartment from west at north
Nov 14, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective cracked glass pane at east sash at first sliding window from west at north in the bathroom located at apt 1l, 1st story, 1st apartment from west at north
Nov 14, 2025 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Nov 14, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Refit door at south in the entrance located at apt 1l, 1st story, 1st apartment from west at north
Nov 14, 2025 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of extremely hot water exceeding the allowable temperature of 130 digress fahrenheit and found to be at 133 degrees fahrenheit at all fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Nov 14, 2025 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1r, 1st story, 2nd apartment from west at north
Nov 13, 2025 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower sash counter balance at 1st window from east at south in the 5th room from north located at apt 1r, 1st story, 2nd apartment from west at north
Nov 13, 2025 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 1r, 1st story, 2nd apartment from west at north
Nov 13, 2025 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Repair the leaky and/or defective water supply pipe under sink in the kitchen located at apt 1r, 1st story, 2nd apartment from west at north
Nov 13, 2025 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1r, 1st story, 2nd apartment from west at north
Nov 13, 2025 · Apt 1R
Closed — Violation dismissed - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof north at public hall, 2nd story
Nov 13, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall at public hall, 1st story
Nov 13, 2025
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at the building entrance door , 1st story
Nov 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective hydronic baseboard heater missing cover at east wall in the 3rd room from north located at apt 1r, 1st story, 2nd apartment from west at north
Nov 13, 2025 · Apt 1R
Closed — Violation dismissed
DOB building violations · 3
- Structurally compromised building none
Failure to submit an acceptable inspectn rpt for structurally compromised bldg.
Jan 15, 2024
Dob violation - active - Construction other optional
Structure rendered non compliant at time of inspection. damage observed to have been sustained. fire caused damage to second floor front apartment 2l with windows missing, sheet rock missing, smoke and water damage, adjoining apartment 2 r damages windows missing, and hole in sheet rock wall due to fire operations
Oct 31, 2023
Dob violation - active - Construction other optional
C-construction other optional
Aug 25, 1993
Vp*-violation unserved ecb- dismissed
ECB violations · 1
- Class - 3
Failure to maintain building in a code compliant manner. holes in ceiling in bedroom and hallway due to water leaks from roof.windows out oftracks making it inoperable.rmdy:repair and/or replace defective windo
May 12, 2013 · Penalty $100
Resolve
Complaints
- Plumbing
Basin/sink
Mar 9, 2026 · Apt 1L
Close - Plumbing
Bathtub/shower
Mar 9, 2026 · Apt 1L
Close - Unsanitary condition
Pests
Jan 30, 2026 · Apt 1L
Close - General
Cabinet
Jan 30, 2026 · Apt 1L
Close - Paint/plaster
Wall
Jan 30, 2026 · Apt 1L
Close - Door/window
Door
Jan 30, 2026 · Apt 1L
Close - Flooring/stairs
Floor
Jan 30, 2026 · Apt 1L
Close - Flooring/stairs
Floor
Jan 18, 2026 · Apt 1L
Close - Flooring/stairs
Floor
Jan 18, 2026 · Apt 1L
Close - Plumbing
Radiator
Jan 18, 2026 · Apt 1L
Close
Show 40 more ↓
- Paint/plaster
Wall
Jan 18, 2026 · Apt 1L
Close - Paint/plaster
Wall
Nov 13, 2025 · Apt 1L
Close - Door/window
Door
Nov 13, 2025 · Apt 1L
Close - Plumbing
Water supply
Nov 13, 2025 · Apt 2R
Close - Plumbing
Basin/sink
Nov 13, 2025 · Apt 2R
Close - Unsanitary condition
Pests
Nov 13, 2025 · Apt 2R
Close - Unsanitary condition
Pests
Nov 13, 2025 · Apt 2R
Close - Door/window
Door
Nov 13, 2025 · Apt 2R
Close - Plumbing
Radiator
Nov 13, 2025 · Apt 2R
Close - Door/window
Door
Nov 13, 2025 · Apt 2R
Close - Outside building
Roof door/hatch
Nov 13, 2025 · Apt BLDG
Close - Door/window
Door
Nov 13, 2025 · Apt 1L
Close - Unsanitary condition
Pests
Nov 13, 2025 · Apt 1L
Close - Electric
No lighting
Nov 13, 2025 · Apt BLDG
Close - Flooring/stairs
Stairs
Nov 13, 2025 · Apt BLDG
Close - Flooring/stairs
Stairs
Nov 13, 2025 · Apt BLDG
Close - Door/window
Door
Nov 13, 2025 · Apt BLDG
Close - Door/window
Door
Nov 13, 2025 · Apt 2R
Close - Safety
Smoke detector
Nov 13, 2025 · Apt 2R
Close - Safety
Carbon monoxide detector
Nov 13, 2025 · Apt 2R
Close - Electric
Wiring
Nov 13, 2025 · Apt 1L
Close - Unsanitary condition
Pests
Nov 13, 2025 · Apt 1L
Close - Safety
Window guard broken/missing
Nov 13, 2025 · Apt 1R
Close - Unsanitary condition
Pests
Nov 13, 2025 · Apt 1L
Close - Plumbing
Basin/sink
Nov 13, 2025 · Apt 1R
Close - Plumbing
Water supply
Nov 13, 2025 · Apt 1R
Close - Door/window
Window pane
Nov 13, 2025 · Apt 1R
Close - Plumbing
Basin/sink
Nov 13, 2025 · Apt 1R
Close - Plumbing
Bathtub/shower
Nov 13, 2025 · Apt 1R
Close - Safety
Carbon monoxide detector
Nov 13, 2025 · Apt 1R
Close - Door/window
Door
Nov 13, 2025 · Apt 1R
Close - Unsanitary condition
Pests
Nov 13, 2025 · Apt 1R
Close - Unsanitary condition
Pests
Nov 13, 2025 · Apt 1R
Close - Door/window
Door
Nov 13, 2025 · Apt 1R
Close - Plumbing
Radiator
Nov 13, 2025 · Apt 1R
Close - Flooring/stairs
Floor
Nov 13, 2025 · Apt 1L
Close - Plumbing
Water supply
Nov 13, 2025 · Apt 1L
Close - Door/window
Door
Nov 13, 2025 · Apt 1L
Close - Door/window
Door
Nov 13, 2025 · Apt 1L
Close - Door/window
Window pane
Nov 13, 2025 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1977
- Floors
- 2
- Residential units
- 4
- Building area
- 3,000 ft²
- Lot area
- 2,500 ft²
- Zoning
- C4-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 524 / 48
- Assessed value
- $252,000
- Landmark / historic district
- No
HPD registration #500270, last renewed Oct 21, 2025.
Questions about 83 Thompson Street
Who owns 83 Thompson Street?
The owner of record in NYC Department of City Planning PLUTO data is Canterino , Diane.
Does 83 Thompson Street have violations?
Yes. NYC HPD has recorded 399 housing violations at this property.
Is 83 Thompson Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 83 Thompson Street built?
City records list 1977 as the year it was built.
How many apartments are in 83 Thompson Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.