52 Beach Street
Staten Island, NY 10304BBL 5-00521-0124Map
Owner of record: Yang, Eric
52 Beach Street is a two-family home built in 1915 in Staten Island, 10304. It has 2 residential units across 2 floors. The owner of record is Yang, Eric. HPD has recorded 91 housing violations here, most recently on November 18, 2019. 48 of the 50 most recent violations are still open.
- HPD violations
- 91
- DOB violations
- 1
- ECB violations
- 7
- HPD complaints
- 168
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 91
- BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story
Nov 18, 2019 · Apt 2R
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story
Nov 18, 2019 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department columns and door casings at building entrance approx. 15 sq. ft. of peeling paint , 1st story
Nov 17, 2018
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department columns and door casings at building entrance. , 1st story
Nov 17, 2018
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 3rd room from east located at apt 1stfl, 1st story
Apr 4, 2018 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1stfl, 1st story
Apr 4, 2018 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 1stfl, 1st story
Apr 4, 2018 · Apt 1STFL
Open — Nov sent out - BHazardous
Properly repair the broken or defective balance lower sash window at west wall in the 2nd room from east at south located at apt 2b, 2nd story, apartment at west
Jan 24, 2018 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair the broken or defective balance lower sash 2nd window from east in the 2nd room from east at south located at apt 2b, 2nd story
Jan 24, 2018 · Apt 2B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling at closet east in the private hallway located at apt 2b, 2nd story, apartment at west
Jan 24, 2018 · Apt 2B
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Refit entrance door located at apt 2b, 2nd story, apartment at west
Jan 24, 2018 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperative light fixture at ceiling in the private hallway located at apt 2b, 2nd story, apartment at west
Jan 24, 2018 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east at south located at apt 2b, 2nd story, apartment at west
Jan 24, 2018 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair the broken or defective base cabinet at sink in the kitchen located at apt 2b, 2nd story, apartment at west
Jan 24, 2018 · Apt 2B
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2b, 2nd story
Jan 24, 2018 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the kitchen located at apt 2b, 2nd story
Jan 24, 2018 · Apt 2B
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2b, 2nd story, apartment at west
Jan 24, 2018 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair the broken or defective balance lower sash 3rd window from north at east wall in the 1st room from east at north located at apt 2f, 2nd story, apartment at east
Nov 15, 2017 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair the broken or defective balance lower sash window at north wall in the 2nd room from east at north located at apt 2f, 2nd story, apartment at east
Nov 15, 2017 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair the broken or defective balance lower sash window at west wall in the 2nd room from east at north located at apt 2f, 2nd story, apartment at east
Nov 15, 2017 · Apt 2F
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the west yard
Nov 15, 2017
Open — First no access to re- inspect violation - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard
Nov 15, 2017
Open — First no access to re- inspect violation - BHazardous
Remove all encumbrances consisting of construction material at public hall, 1st story
Nov 15, 2017
Open — First no access to re- inspect violation - BHazardous
Replace with new the missing 2 balusters at public hall stairs, 1st story
Nov 15, 2017
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tile in the kitchen located at apt 2r, 2nd story, apartment at north
Nov 15, 2017 · Apt 2R
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and all walls at closet in the private hallway located at apt 2b, 2nd story
Aug 30, 2017 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 2b, 2nd story
Aug 30, 2017 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 2b, 2nd story
Aug 30, 2017 · Apt 2B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all walls and ceiling all stories at public hall
Aug 2, 2017
Open — First no access to re- inspect violation - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Aug 2, 2017
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective side entrance door frame and casing in the kitchen located at apt 1fl, 1st story, 1st apartment from west at north
Aug 2, 2017 · Apt 1FL
Open — First no access to re- inspect violation - ANon-hazardous
Refit side entrance door in the kitchen located at apt 1fl, 1st story, 1st apartment from west at north
Aug 2, 2017 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective connection at sink drain line in the kitchen located at apt 1fl, 1st story, 1st apartment from west at north
Aug 2, 2017 · Apt 1FL
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1fl, 1st story, 1st apartment from west at north
Aug 2, 2017 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall at east 2 room located at apt 1fl, 1st story, 1st apartment from west at north
Aug 2, 2017 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Remove all obstructions and repair all defects in washbasin drain line in the bathroom located at apt 1fl, 1st story, 1st apartment from west at north
Aug 2, 2017 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 1fl, 1st story, 1st apartment from west at north
Aug 2, 2017 · Apt 1FL
Open — First no access to re- inspect violation - CImmediately hazardous
Remove all obstructions from water closet ... in the bathroom located at apt 1fl, 1st story, 1st apartment from west at north
Aug 2, 2017 · Apt 1FL
Open — First no access to re- inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jul 24, 2017
Open — Info nov sent out - BHazardous
Properly secure the loose wash basin to wall in the bathroom located at apt 2f, 2nd story
Jul 19, 2017 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the 1st room from north at east located at apt 2f, 2nd story
Jul 19, 2017 · Apt 2F
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color lower south wall in the 1st room from north at west located at apt 2f, 2nd story
Jul 19, 2017 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the kitchen located at apt 2f, 2nd story
Jul 19, 2017 · Apt 2F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the 1st room from north at west located at apt 2f, 2nd story
Jul 19, 2017 · Apt 2F
Open — Nov sent out - BHazardous
Repair the leaky and/or defective water supply pipe at water-closet in the bathroom located at apt 2f, 2nd story
Jul 19, 2017 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective inner glass pane at lower east north window sash in the 1st room from north at east located at apt 2f, 2nd story
Jul 19, 2017 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective inner glass pane at lower east south window sash in the 1st room from north at east located at apt 2f, 2nd story
Jul 19, 2017 · Apt 2F
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2f, 2nd story
Jul 19, 2017 · Apt 2F
Open — Nov sent out - BHazardous
Properly secure the loose laminate counter-top at base-cabinets in the kitchen located at apt 2f, 2nd story
Jul 19, 2017 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas-range in the kitchen located at apt 1, 1st story
Jul 19, 2017 · Apt 1
Open — Nov sent out
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2018
Dob violation - dismissed
ECB violations · 7
- Class - 1
Failure to comply with the commissioner's order contained in summons/violation #35291958z issued 11/13/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. rem: comply with commissi
Aug 8, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation #35336764r issued 02/27/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. no permits, laa's or job
Jun 28, 2018 · Penalty $12,500
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35291958z issued on 11/13/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.subdivided 2nd floor int
Feb 27, 2018 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation# 35291958z issued on 11/13/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for subdividing 2nd flr into 2 class 'a' apts.
Feb 27, 2018 · Penalty $12,000
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35291958z issued on 11/13/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Jan 2, 2018 · Penalty $6,000
Resolve - Class - 1
Work w/o permit. work noted: at 2nd fl subdivided into 2 class'a'apt erected full partitions w/doors created bedrooms & 1 3pc bathroom. installed water & waste lines for residential sink & 3pc bathroom(sink,toi
Nov 13, 2017 · Penalty $8,000
Active - Class - 2
Residence altered as a dwelling for more than the # of families legally authorized by the c of o or offical records. dob records indicate premises legally approved as 2 families dwelling. now residence altered
Nov 13, 2017 · Penalty $6,000
Active
Complaints
- Heat/hot water
Apartment only
Nov 15, 2019 · Apt 2R
Close - Electric
No lighting
Nov 15, 2019 · Apt 2R
Close - Unsanitary condition
Pests
Jan 22, 2019 · Apt 2B
Close - Door/window
Door
Jan 22, 2019 · Apt 2B
Close - Door/window
Door
Nov 19, 2018 · Apt 1FL
Close - Door/window
Door
Nov 19, 2018 · Apt 1FL
Close - Door/window
Door
Nov 19, 2018 · Apt 1FL
Open - Heat/hot water
Entire building
Nov 10, 2018 · Apt 2B
Close - Heat/hot water
Apartment only
Oct 28, 2018 · Apt 2REAR
Close - Electric
Outlet/switch
May 18, 2018 · Apt 2REAR
Close
Show 40 more ↓
- Flooring/stairs
Floor
May 18, 2018 · Apt 2REAR
Close - General
Cabinet
May 18, 2018 · Apt 2REAR
Close - Unsanitary condition
Pests
May 18, 2018 · Apt 2REAR
Close - Unsanitary condition
Pests
May 18, 2018 · Apt 2REAR
Close - Paint/plaster
Ceiling
May 18, 2018 · Apt 2REAR
Close - Paint/plaster
Wall
May 18, 2018 · Apt 2REAR
Close - Door/window
Door frame
May 18, 2018 · Apt 2REAR
Close - Appliance
Electric/gas range
May 18, 2018 · Apt 2REAR
Close - Door/window
Window pane
May 17, 2018 · Apt 2A
Close - Paint/plaster
Ceiling
May 16, 2018 · Apt 2F
Close - Water leak
Heavy flow
May 16, 2018 · Apt 2F
Close - Paint/plaster
Ceiling
May 16, 2018 · Apt 2F
Close - Door/window
Window frame
Apr 15, 2018 · Apt 2B
Close - Electric
Lighting
Apr 15, 2018 · Apt 2B
Close - Flooring/stairs
Floor
Apr 15, 2018 · Apt 2B
Close - Door/window
Door frame
Apr 15, 2018 · Apt 2B
Close - Electric
Lighting
Apr 15, 2018 · Apt 2B
Close - Appliance
Electric/gas range
Apr 15, 2018 · Apt 2B
Close - Flooring/stairs
Floor
Apr 14, 2018 · Apt 2F
Close - Appliance
Electric/gas range
Apr 14, 2018 · Apt 2F
Close - Plumbing
Toilet
Apr 14, 2018 · Apt 2F
Close - Paint/plaster
Ceiling
Apr 11, 2018 · Apt 1STF
Close - Plumbing
Toilet
Apr 11, 2018 · Apt 2F
Close - Flooring/stairs
Floor
Apr 11, 2018 · Apt 2F
Close - Paint/plaster
Ceiling
Apr 11, 2018 · Apt 1STF
Close - General
Cooking gas
Apr 11, 2018 · Apt 1STF
Close - Water leak
Heavy flow
Apr 11, 2018 · Apt 1STF
Close - Appliance
Electric/gas range
Apr 11, 2018 · Apt 2F
Close - Paint/plaster
Ceiling
Mar 22, 2018 · Apt 1STFL
Close - Plumbing
Water supply
Mar 16, 2018 · Apt 1FL
Close - Paint/plaster
Ceiling
Mar 13, 2018 · Apt 1FL
Close - Door/window
Door
Mar 13, 2018 · Apt 1FL
Close - Paint/plaster
Ceiling
Mar 13, 2018 · Apt 1FL
Close - Paint/plaster
Ceiling
Mar 13, 2018 · Apt 1FL
Close - Paint/plaster
Ceiling
Mar 13, 2018 · Apt 1FL
Close - Door/window
Door frame
Mar 13, 2018 · Apt 1FL
Close - Flooring/stairs
Floor
Mar 13, 2018 · Apt 1FL
Close - Water leak
Slow leak
Mar 13, 2018 · Apt 1FL
Close - Water leak
Slow leak
Mar 13, 2018 · Apt 1FL
Close - Paint/plaster
Ceiling
Mar 13, 2018 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1915
- Floors
- 2
- Residential units
- 2
- Building area
- 2,400 ft²
- Lot area
- 1,500 ft²
- Zoning
- C4-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 521 / 124
- Assessed value
- $34,860
- Landmark / historic district
- No
Questions about 52 Beach Street
Who owns 52 Beach Street?
The owner of record in NYC Department of City Planning PLUTO data is Yang, Eric.
Does 52 Beach Street have violations?
Yes. NYC HPD has recorded 91 housing violations at this property.
Is 52 Beach Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 52 Beach Street built?
City records list 1915 as the year it was built.
How many apartments are in 52 Beach Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.