roofy

643 Bay Street

Staten Island, NY 10304BBL 5-00494-0006Map

Owner of record: Bva Bay Realty Corp.

643 Bay Street is a mixed residential and retail building built in 1945 in Staten Island, 10304. It has 2 residential units across 2 floors. The owner of record is Bva Bay Realty Corp.. HPD has recorded 38 housing violations here, most recently on May 23, 2018. 33 of the 38 most recent violations are still open.

HPD violations
38
DOB violations
43
ECB violations
15
HPD complaints
36

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 23, 2018

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 38

  • B

    Repair the roof so that it will not leak at ceiling in the kitchen located at apt 2r, 2nd story

    May 23, 2018 · Apt 2R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 2r, 2nd story

    May 23, 2018 · Apt 2R

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... north wall approx 2 sq ft in the bathroom located at apt 2r, 2nd story

    May 23, 2018 · Apt 2R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the private hallway located at apt 2r, 2nd story

    May 23, 2018 · Apt 2R

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2r, 2nd story

    May 23, 2018 · Apt 2R

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2rr, 2nd story

    Jan 9, 2013 · Apt 2RR

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 2rr, 2nd story

    Jan 9, 2013 · Apt 2RR

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 2rr, 2nd story

    Jan 9, 2013 · Apt 2RR

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceiling tiles in the kitchen located at apt 2rr, 2nd story

    Jan 9, 2013 · Apt 2RR

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective metal track for drop ceiling in the 2nd room from north located at apt 2fl, 2nd story

    Feb 24, 2011 · Apt 2FL

    Open — Nov sent out
Show 28 more ↓
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north located at apt 2fl, 2nd story

    Feb 24, 2011 · Apt 2FL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 2fl, 2nd story

    Feb 24, 2011 · Apt 2FL

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 2fl, 2nd story

    Feb 24, 2011 · Apt 2FL

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story

    Feb 24, 2011 · Apt 2FL

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood cabinets at north wall in the kitchen located at apt 2fl, 2nd story

    Feb 24, 2011 · Apt 2FL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color south wall at public hall, 2nd story

    Feb 24, 2011

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt 2fl, 2nd story

    Feb 24, 2011 · Apt 2FL

    Open — Nov sent out
  • B

    Properly repair the broken or defective ceiling light fixture in the 3rd room from north located at apt 2f, 2nd story

    Sep 26, 2006 · Apt 2F

    Open — Nov sent out
  • B

    Abate the nuisance consisting of conceald water leak ceiling at public hall, 2nd story

    Sep 26, 2006

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2f, 2nd story

    Sep 26, 2006 · Apt 2F

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective cermaic tiles north wall in the bathroom located at apt 2f, 2nd story

    Sep 26, 2006 · Apt 2F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color north and south wall and ceiling at public hall, 2nd story

    Sep 26, 2006

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets sink in the bathroom located at apt 2f, 2nd story

    Sep 26, 2006 · Apt 2F

    Open — Nov sent out
  • B

    Properly repair the broken or defective light switch south wall at public hall, 2nd story

    Sep 26, 2006

    Open — Nov sent out
  • B

    Provide door bell in the entrance located at apt 2f, 2nd story

    Sep 26, 2006 · Apt 2F

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of ladders and,mops at public hall, 2nd story

    Sep 26, 2006

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective 4th wood tread from bottom at stairs at public hall, 1st story

    Sep 25, 2003

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls at vestibule at public hall, 1st story

    Sep 25, 2003

    Open — Nov sent out
  • B

    Replace with new the missing cover for wall light switch at public hall, 2nd story

    Sep 25, 2003

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls due to water damage at public hall, 2nd story

    Sep 25, 2003

    Open — Nov sent out
  • B

    Replace with new the missing drop ceiling tiles in the 1st room from east at south located at apt 2flf, 2nd story

    Sep 25, 2003 · Apt 2FLF

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2flf, 2nd story

    Sep 25, 2003 · Apt 2FLF

    Open — Nov sent out
  • B

    Replace with new the missing wood door for top cabinet in the kitchen located at apt 2flf, 2nd story

    Sep 25, 2003 · Apt 2FLF

    Open — Nov sent out
  • B

    Replace with new the broken or defective electric outlet cover north wall at 1st room from north, 2nd story, apartment

    Jun 28, 2001 · Apt 2F

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed electric wiring outlet north wall at 1st room from north, 2nd story, apartment

    Jun 28, 2001 · Apt 2F

    Open — Nov sent out
  • B

    Replace with new the broken or defective covers baseboard heaters at entire apartment, 2nd story, apartment

    Jun 28, 2001 · Apt 2F

    Open — Nov sent out
  • C

    Replace with new the missing metal tread 3 rd up scuttle ladder to roof at public hall, 2nd story

    Jun 28, 2001

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and soffit scuttle to roof at public hall, 2nd story

    Jun 28, 2001

    Open — Nov sent out

DOB building violations · 43

  • Construction other optional

    Failure to ma intain bldg in a safe condition.exp1 masonry wall was cracked along the full bldg width above 2nd floor windows and bulging out.exp1 wall in disrepair.ownr to rtain nyspe to file rpair dwgs w/ dob.bldg to be perm rpaird undr prmt strtng by 3/30/26&cmpltd/sgnd off by 5/15/26

    Mar 3, 2026

    Dob violation - active
  • Immediate emergency anythingoptional

    Install approximately 25 linear feet of sidewalk shed along exposure 1 (bay street) to enclose potential collapse zone and safeguard the public and property

    Jan 30, 2026

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
Show 33 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 5, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 5, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 15, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 2, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Construction other optional

    C-construction other optional

    May 26, 1993

    Vw-violation work without permit - active
  • Construction other optional

    C-construction other optional

    Aug 27, 1992

    Vpw*-violation unserved ecb-work without permit-dismissed

ECB violations · 15

  • Class - 1

    Ec230.91/miscellaneous violation of the electrical code technical standards.main switch not provided:observed one of five main panels had nomain service disconnect switch,"owners plp"panel used for branch circu

    Oct 27, 2016 · Penalty $1,600

    Active
  • Class - 1

    Electrical work without permit.observed that owners plp circuit breaker panel has been installed prior to obtaining permit.(said panel has no means of disconnect switch.hazardous and dangerous.rem:comply with

    Oct 27, 2016

    Resolve
  • Class - 2

    B265 as per class 2 (b265) 28-303.7 failure to file a complete boilerinspection report as per dob records. submit a current b09 report, correct all violating conditions and submit the certificate of correction

    May 25, 2016

    Resolve
  • Class - 2

    B265 as per class 2 (b265) 28-303.7 failure to file a complete boilerinspection report as per dob records. submit a current b09 report, correct all violating conditions and submit the certificate of correction

    May 25, 2016

    Resolve
  • Class - 2

    B265 as per class 2 (b265) 28-303.7 failure to file a complete boilerinspection report as per dob records. submit a current b09 report, correct all violating conditions and submit the certificate of correction

    May 25, 2016

    Resolve
  • Class - 1

    Fail to maintain bldg in a code compliant manner noted @rear yd household garbage & constr debris w/propane tanks,ladders piles of assorted flammable materials strewn across yd @time oof insp.rem: maintain bldg

    Jun 15, 2014 · Penalty $250

    Resolve
  • Class - 1

    Work w/o permit. noted: at rear yard an approx 8'h x 25'w x 12'l shed in place,constructed of non fire proof lumber w/o permit. remedy: obtain permit.

    Oct 26, 2013 · Penalty $800

    Active
  • Class - 1

    Sec. 28-301.1 failure to maintain bldg in a code compliant manner. noted: in boiler room - no covers on heat plants,exposed electrical wiring w/combustible materials stored. remedy: make safe immediately - repa

    Oct 26, 2013

    Resolve
  • Class - 1

    B101. installation of 3 gas boilers w/o plans or permits on file w/thenyc dob.

    Aug 3, 2011

    Resolve
  • Class - 2

    B254,36.

    Aug 3, 2011

    Resolve
Show 5 more ↓
  • Class - 2

    B254,36.

    Aug 3, 2011

    Resolve
  • Class - 2

    B254,36.

    Aug 3, 2011

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by c of o # 7518 indicates bldg to be occupied as 2 store fronts,at time of inspection 1st fl occupied associal club. at 2nd office space now occupied as class"a" apt.

    Mar 3, 2007

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by:cofo #7518-indicates bldg to be occupied 1st fl as (2) store fronts-now being occupied as a social club.@ 2nd\fl level cofo indicates office space-now (2) class "a" apt w/

    Oct 28, 2006 · Penalty $800

    Active
  • Hazardous

    Work w/o permit.noted work @ 2nd flr level water & waste lines installed for 3pc bthrms (2)- gas lines installed for (2) gas stoves.no permit or approvals on file.remedy:obtain permits or/restore legal prior

    Oct 28, 2006 · Penalty $800

    Active

Complaints

  • General

    Cooking gas

    Sep 3, 2018 · Apt 2

    Close
  • Electric

    No lighting

    Sep 3, 2018 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Sep 3, 2018 · Apt 2

    Close
  • General

    Cooking gas

    Aug 28, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Aug 28, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Aug 28, 2018 · Apt 2FL

    Close
  • General

    Cooking gas

    Aug 24, 2018 · Apt 2FL

    Close
  • Heat/hot water

    Entire building

    Aug 24, 2018 · Apt 2FL

    Close
  • Heat/hot water

    Entire building

    Aug 24, 2018 · Apt BLDG

    Close
  • General

    Cooking gas

    Aug 22, 2018 · Apt 1

    Close
Show 26 more ↓
  • Heat/hot water

    Entire building

    Aug 22, 2018 · Apt 1

    Close
  • Water leak

    Slow leak

    May 21, 2018 · Apt 2R

    Close
  • Electric

    Wiring

    Jan 3, 2013 · Apt 2RR

    Close
  • Paint/plaster

    Ceiling

    Jan 3, 2013 · Apt 2RR

    Close
  • Paint/plaster

    Ceiling

    Jan 3, 2013 · Apt 2RR

    Close
  • General

    Cooking gas

    Jan 3, 2013 · Apt 2RR

    Close
  • Plumbing

    Water-leaks

    Feb 4, 2011 · Apt 2FL

    Close
  • Plumbing

    Water-leaks

    Feb 4, 2011 · Apt 2FL

    Close
  • Plumbing

    Water-leaks

    Feb 4, 2011 · Apt 2FL

    Close
  • Plumbing

    Basin/sink

    Feb 4, 2011 · Apt 2FL

    Close
  • Nonconst

    Rubbish

    Sep 19, 2006 · Apt 2R

    Close
  • Nonconst

    Rubbish

    Sep 19, 2006 · Apt 2R

    Close
  • General

    Windows

    Sep 19, 2006 · Apt 2R

    Close
  • General

    Mold

    Sep 19, 2006 · Apt 2R

    Close
  • Plumbing

    Basin/sink

    Sep 19, 2006 · Apt 2R

    Close
  • Plumbing

    Toilet

    Sep 19, 2006 · Apt 2R

    Close
  • Nonconst

    Vermin

    Sep 19, 2006 · Apt 2R

    Close
  • Nonconst

    Vermin

    Sep 19, 2006 · Apt 2R

    Close
  • Plumbing

    Water-leaks

    Sep 19, 2006 · Apt 2R

    Close
  • Plumbing

    Water-leaks

    Sep 19, 2006 · Apt 2R

    Close
  • Plumbing

    Water-leaks

    Sep 19, 2006 · Apt 2F

    Close
  • Electric

    Wiring

    Oct 12, 2005 · Apt 2F

    Close
  • Plumbing

    Water-leaks

    Oct 12, 2005 · Apt 2F

    Close
  • General

    Cabinet

    Sep 25, 2003 · Apt 2F

    Close
  • Nonconst

    Vermin

    Sep 25, 2003 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Sep 25, 2003 · Apt 2F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S2)
Year built
1945
Floors
2
Residential units
2
Building area
3,250 ft²
Lot area
2,325 ft²
Zoning
C4-2
Community board
501
Council district
49
Block / lot
494 / 6
Assessed value
$37,680
Landmark / historic district
No

Questions about 643 Bay Street

Who owns 643 Bay Street?

The owner of record in NYC Department of City Planning PLUTO data is Bva Bay Realty Corp..

Does 643 Bay Street have violations?

Yes. NYC HPD has recorded 38 housing violations at this property.

Is 643 Bay Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 643 Bay Street built?

City records list 1945 as the year it was built.

How many apartments are in 643 Bay Street?

It has 2 residential units and 3 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.