roofy

1836 Richmond Terrace

Staten Island, NY 10310BBL 5-00201-0037Map

Owner of record: Lovely View Corp

1836 Richmond Terrace is an one-family home built in 1901 in Staten Island, 10310. It has 1 residential unit across 2.75 floors. The owner of record is Lovely View Corp. HPD has recorded 57 housing violations here, most recently on December 1, 2021. 31 of the 50 most recent violations are still open.

HPD violations
57
DOB violations
0
ECB violations
8
HPD complaints
77

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Dec 1, 2021

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 57

  • C

    Provide temporary seal-up of all accessible openings

    Dec 1, 2021

    Closed — Violation closed
  • I

    The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for the entire building, vacate number 183446

    Nov 19, 2021

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2021

    Open — Info nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color at walls and ceiling through out entire building

    Nov 10, 2021

    Open — Nov sent out
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exsposed electrical wiring at ceiling through out entire building

    Nov 10, 2021

    Open — Nov sent out
  • C

    Provide adequate supply of cold water for the fixtures through out entire building

    Nov 10, 2021

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures through out entire building

    Nov 10, 2021

    Open — Nov sent out
  • C

    Provide adequate supply of cold water for the fixtures .. at bathtub, water-closet, washbasin and sink in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Oct 15, 2021 · Apt 1

    Closed — Violation closed
  • C

    Provide adequate supply of hot water for the fixtures ..at bathtub, washbasin and sink in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Oct 15, 2021 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling at public hall, 2nd story

    Oct 5, 2021

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Oct 5, 2021 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and all walls in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Oct 5, 2021 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and all walls in the 3rd room from north located at apt 2, 2nd story, 1st apartment from south at west

    Oct 5, 2021 · Apt 2

    Open — Nov sent out
  • C

    Replace with new the broken or defective glass pane at lower window sash at west wall in the 2nd room from north located at apt 2, 2nd story, 1st apartment from south at west

    Oct 5, 2021 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and all walls in the 1st room from north located at apt 2, 2nd story, 1st apartment from south at west

    Oct 5, 2021 · Apt 2

    Open — Nov sent out
  • C

    Replace with new the broken or defective glass pane at upper window sash at west wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from south at west

    Oct 5, 2021 · Apt 2

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Oct 5, 2021 · Apt 2

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Oct 5, 2021 · Apt 2

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Oct 5, 2021 · Apt 2

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures at washbasin, bathtub and sink in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Oct 5, 2021 · Apt 2

    Closed — Violation closed
  • C

    Provide adequate supply of cold water for the fixtures at washbasin, water-closet, bathtub and sink in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Oct 5, 2021 · Apt 2

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 1 upper level, 1st story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Closed — Violation closed
  • B

    Replace with new the broken or defective entrance door in the 4th room from north located at apt 1 upper level, 2nd story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Open — Nov sent out
  • B

    Replace with new the broken or defective entrance door in the 3rd room from north located at apt 1 upper level, 2nd story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Open — Nov sent out
  • B

    Replace with new the broken or defective entrance door in the 2nd room from north located at apt 1 upper level, 2nd story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Open — Nov sent out
  • B

    Replace with new the broken or defective entrance door in the 1st room from north located at apt 1 upper level, 2nd story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceilings throughout in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Open — Nov sent out
  • C

    Replace with new the broken or defective glass pane at upper and lower window sashes glass at east and south walls in the 4th room from north located at apt 1 upper level, 1st story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Closed — Violation closed
  • C

    Replace with new the broken or defective glass pane at upper and lower window sashes at east wall in the 3rd room from north located at apt 1 upper level, 1st story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Closed — Violation closed
  • C

    Replace with new the broken or defective glass pane at upper and lower window sashes at north wall in the 1st room from north located at apt 1 upper level, 1st story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Closed — Violation closed
  • C

    Replace with new the missing glass pane at lower and upper window sashes at east and south walls in the 2nd room from north located at apt 1 upper level, 1st story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Closed — Violation closed
  • C

    Replace with new the missing glass pane at lower window sash at east wall in the bathroom located at apt 1 upper level, 1st story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Closed — Violation closed
  • B

    Replace with new the missing metal-covers at baseboard radiators at west and east walls in the private hallway located at apt 1, 1st story, 1st apartment from east at south

    Jan 19, 2021 · Apt 1

    Open — Nov sent out
  • C

    § 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story

    Dec 3, 2020 · Apt 1

    Closed — Violation closed
  • C

    Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at hot water fixtures in the entire apartment located at apt 1, 1st story

    Dec 3, 2020 · Apt 1

    Closed — Violation closed
  • C

    Remove the illegal fastening padlock and chain installed gate at front entrance to building

    Dec 3, 2020

    Open — Nov sent out
  • C

    § 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story

    Nov 19, 2020 · Apt 1

    Closed — Violation closed
  • C

    Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at hot water fixtures in the entire apartment located at apt 1, 1st story

    Nov 19, 2020 · Apt 1

    Closed — Violation closed
  • C

    Remove the illegal fastening padlock and chain installed on gate at front entrance to building

    Nov 19, 2020

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 1, 1st story

    Nov 19, 2020 · Apt 1

    Open — Nov sent out
  • C

    Replace with new the missing upper sash 1st window from east at north wall in the 1st room from north located at apt 1, 1st story

    Nov 19, 2020 · Apt 1

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 22, 2020

    Open — Info nov sent out
  • C

    Abate the nuisance consisting of hot water exceeding the maximum temperature of 130f at all hot water fixtures in the entire apartment located at apt 1 lower level, 1st story, 1st apartment from east at south

    Oct 20, 2020 · Apt 1

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1 lower level, 1st story, 1st apartment from east at south

    Oct 20, 2020 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 1 upper level, 1st story

    Oct 20, 2020 · Apt 1

    Open — Nov sent out
  • B

    Provide adequate supply of hot water for the fixtures at bath-tub and washbasin in the bathroom located at apt 1 upper level, 1st story

    Oct 20, 2020 · Apt 1

    Open — Nov sent out
  • A

    Replace with new the broken or defective cover for water tank at water-closet in the bathroom located at apt 2a

    Jun 23, 2008 · Apt 2A

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 8

  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35291643y issued on 11/02/2017 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for c of c residential

    Sep 20, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/vio# 35291643y issued on 11/2/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. rem: comply w commissioner's order &/or file a c of c.

    Aug 4, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation# 35291643y issued on 11/2/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. residence altered for occupancy as a dwelling fr

    Jun 30, 2018 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation #35291643y issued on 11/02/17 & to file a certificate of correction pursuant to 28-201.1 & rcny 102-01.for altering the occupancy f

    Mar 19, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35291643y issued on 11/02/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.

    Jan 31, 2018 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35291643y issued on 11/02/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.

    Dec 8, 2017 · Penalty $800

    Resolve
  • Class - 1

    Residence altered for occupancy as a dwelling from 1 or 2 families to 4 or more families. dob's records indicate residence legally authorized as 1 family dwelling now residence altered & occupied as 4 families

    Nov 2, 2017 · Penalty $44,400

    Resolve
  • Hazardous

    Failure to maintain exterior bldg wall 1) defect noted at right side of bldg brick foundation has missing bricks approx 2-3 sq ft by angledarea of foundation & at front of bldg foundation mortar joints are def

    Jun 16, 2008 · Penalty $350

    Resolve

Complaints

  • Electric

    Wiring

    Oct 28, 2021 · Apt PRIVAT

    Close
  • Plumbing

    Water supply

    Oct 28, 2021 · Apt PRIVAT

    Close
  • Plumbing

    Bathtub/shower

    Oct 19, 2021 · Apt PRIVAT

    Close
  • Paint/plaster

    Ceiling

    Oct 19, 2021 · Apt PRIVAT

    Close
  • Heat/hot water

    Apartment only

    Oct 19, 2021 · Apt PRIVAT

    Close
  • Door/window

    Door

    Oct 19, 2021 · Apt PRIVAT

    Close
  • Paint/plaster

    Wall

    Oct 19, 2021 · Apt PRIVAT

    Close
  • Door/window

    Window frame

    Oct 19, 2021 · Apt PRIVAT

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2021 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Oct 1, 2021 · Apt ENTIRE

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Sep 3, 2021 · Apt 2

    Close
  • Plumbing

    Water supply

    Sep 3, 2021 · Apt 2

    Close
  • General

    Cooking gas

    Sep 3, 2021 · Apt 2

    Close
  • Door/window

    Window pane

    Sep 3, 2021 · Apt 2

    Close
  • Plumbing

    Water supply

    Sep 3, 2021 · Apt 2

    Close
  • Plumbing

    Radiator

    Aug 26, 2021 · Apt 1

    Close
  • Plumbing

    Water supply

    Aug 26, 2021 · Apt 1

    Close
  • Paint/plaster

    Wall

    Aug 26, 2021 · Apt 1

    Close
  • Door/window

    Door frame

    Aug 26, 2021 · Apt 1

    Close
  • Door/window

    Window pane

    Aug 26, 2021 · Apt 1

    Close
  • Door/window

    Window frame

    Jun 15, 2021 · Apt WHOLE

    Close
  • Plumbing

    Water supply

    Jun 15, 2021 · Apt WHOLEH

    Close
  • Heat/hot water

    Entire building

    Apr 9, 2021 · Apt 1FLR

    Close
  • Heat/hot water

    Entire building

    Feb 26, 2021 · Apt PH

    Close
  • Plumbing

    Water supply

    Jan 15, 2021 · Apt 1

    Close
  • Door/window

    Window pane

    Jan 15, 2021 · Apt 1

    Close
  • Door/window

    Window frame

    Jan 9, 2021 · Apt PRIVAT

    Close
  • Door/window

    Door

    Jan 9, 2021 · Apt PRIVAT

    Close
  • Heat/hot water

    Apartment only

    Jan 9, 2021 · Apt PRIVAT

    Close
  • Plumbing

    Bathtub/shower

    Jan 9, 2021 · Apt PRIVAT

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2020 · Apt 2NDFLO

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2020 · Apt PH

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2020 · Apt 1

    Close
  • Door/window

    Window pane

    Nov 16, 2020 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Nov 4, 2020 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2020 · Apt PH

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2020 · Apt PH

    Close
  • Appliance

    Refrigerator

    Nov 15, 2017 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Nov 15, 2017 · Apt 2

    Close
  • Door/window

    Window pane

    Nov 15, 2017 · Apt 2

    Close
  • Water leak

    Heavy flow

    Nov 15, 2017 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Nov 15, 2017 · Apt 2

    Close
  • Door/window

    Window frame

    Nov 15, 2017 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Nov 15, 2017 · Apt 2

    Close
  • Paint/plaster

    Wall

    Nov 15, 2017 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Nov 15, 2017 · Apt 2

    Close
  • Paint/plaster

    Window/frame

    Nov 2, 2017 · Apt 2NFLOO

    Close
  • Unsanitary condition

    Mold

    Nov 2, 2017 · Apt 2NFLOO

    Close
  • General

    Cabinet

    Nov 2, 2017 · Apt 2NFLOO

    Close
  • Plumbing

    Toilet

    Nov 2, 2017 · Apt 2NFLOO

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
One-family home (A1)
Year built
1901
Floors
2.75
Residential units
1
Building area
2,080 ft²
Lot area
3,534 ft²
Zoning
R3-2
Community board
501
Council district
49
Block / lot
201 / 37
Assessed value
$37,500
Landmark / historic district
No

Questions about 1836 Richmond Terrace

Who owns 1836 Richmond Terrace?

The owner of record in NYC Department of City Planning PLUTO data is Lovely View Corp.

Does 1836 Richmond Terrace have violations?

Yes. NYC HPD has recorded 57 housing violations at this property.

Is 1836 Richmond Terrace rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1836 Richmond Terrace built?

City records list 1901 as the year it was built.

How many apartments are in 1836 Richmond Terrace?

It has 1 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.