roofy

Violations at 29 Tompkins Court

Staten Island, NY 10310 · BBL 5-00187-0123 · Back to the property

HPD housing violations

The newest 50 of 83 HPD violations. The city keeps the complete history.

  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 26, 2025

    Open — Info nov sent out
  • BHazardous

    Properly repair or replace the broken or defective electrical gfci outlet in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Aug 28, 2023 · Apt 1

    Open — Nov certified late
  • BHazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Aug 28, 2023 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Properly repair the broken or defective paving at rear yard

    Apr 18, 2023

    Open — Not complied with
  • ANon-hazardous

    Properly secure the loose ceiling ventilation fan in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Apr 18, 2023 · Apt 1

    Open — Not complied with
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    Properly repair the broken or defective paving at rear yard

    Aug 13, 2021

    Open — Not complied with
  • ANon-hazardous

    Properly repair with similar material the broken or defective concrete stoop at building front staris

    Aug 13, 2021

    Open — Not complied with
  • ANon-hazardous

    Properly repair with similar material the broken or defective vinyl siding at east exterior side of building

    Aug 13, 2021

    Open — Not complied with
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 1, 1st story

    Aug 13, 2021 · Apt 1

    Closed — Violation closed
  • ANon-hazardous

    Refit lower sash at window in the kitchen located at apt 1, 1st story

    Aug 13, 2021 · Apt 1

    Closed — Violation closed
  • BHazardous

    Replace with new the missing ( 3 ) balusters at north balustrade at stairs at front entrance to building , 1st story

    Jun 6, 2017

    Closed — Violation closed
  • BHazardous

    Replace with new the missing ( 3 ) balusters at metal handrail at stairs front entrance to building

    Jan 5, 2015 · Apt 1

    Closed — Violation dismissed
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1fl, 1st story

    Sep 11, 2014 · Apt 1FL

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... present at lower south wall ( approx- 4 sq,ft ) inside base-cabinets under sink in the kitchen located at apt 1fl, 1st story

    Sep 11, 2014 · Apt 1FL

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1fl, 1st story

    Sep 11, 2014 · Apt 1FL

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the lower west wall in the bathroom located at apt 1fl, 1st story

    Sep 11, 2014 · Apt 1FL

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... present at lower west wall ( approx- 3 sq,ft ) in the bathroom located at apt 1fl, 1st story

    Sep 11, 2014 · Apt 1FL

    Closed — Violation closed
  • BHazardous

    Properly secure the loose ( 1 ) baluster at metal handrail at stairs front entrance to building

    May 29, 2014

    Open — Not complied with
  • BHazardous

    Replace with new the missing ( 3 ) balusters at metal handrail at stairs front entrance to building

    May 29, 2014

    Open — Not complied with
  • BHazardous

    Properly repair the broken or defective inoperative electrical outlet at lower north wall in the 2nd room from east at north located at apt 1fl, 1st story

    May 29, 2014 · Apt 1FL

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective inoperative electrical outlet at lower west wall in the 1st room from east at south located at apt 1fl, 1st story

    May 29, 2014 · Apt 1FL

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective wood floor inside base-cabinets in the kitchen located at apt 1fl, 1st story

    May 29, 2014 · Apt 1FL

    Closed — Violation closed
  • BHazardous

    Repair the roof so that it will not leak over ceiling inside closet in the 1st room from east at south located at apt 1fl, 1st story

    May 29, 2014 · Apt 1FL

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and walls inside closet in the 1st room from east at south located at apt 1fl, 1st story

    May 29, 2014 · Apt 1FL

    Closed — Violation closed
  • BHazardous

    Repair the leaky and/or defective water supply pipe under sink in the kitchen located at apt 1fl, 1st story

    May 29, 2014 · Apt 1FL

    Closed — Violation closed
  • ANon-hazardous

    Refit door in the entrance located at apt 1, 1st story

    Oct 21, 2013 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the lower west wall in the bathroom located at apt 1, 1st story

    Oct 21, 2013 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1, 1st story

    Oct 21, 2013 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the walls and ceiling inside closet in the 1st room from east at south located at apt 1, 1st story

    Oct 21, 2013 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective door-knob in the bathroom located at apt 1, 1st story

    Oct 21, 2013 · Apt 1

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of mice in the entire apartment located at apt 1, 1st story

    Oct 21, 2013 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective soffit at west front roof

    Apr 15, 2011

    Closed — Violation closed
  • CImmediately hazardous

    Provide an adequate supply of gas to the fixtures gas-range in the kitchen located at apt 2, 2nd story

    Apr 15, 2011 · Apt 2

    Closed — Violation closed
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front , rear and south yard

    Apr 11, 2011

    Closed — Violation closed
  • BHazardous

    Provide an adequate supply of gas to the fixtures ( gas-stove ) in the kitchen located at apt 1, 1st story

    Apr 6, 2006 · Apt 1

    Closed — Violation dismissed
  • BHazardous

    Provide an adequate supply of gas to the fixtures .. in the entire apartment located at apt 1, 1st story

    Mar 30, 2006 · Apt 1

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling & east wall in the kitchen located at apt 1, 1st story

    Mar 30, 2006 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective inoperative oven at gas/range in the kitchen located at apt 1, 1st story

    Feb 27, 2006 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective upper and lower wood cabinets in the kitchen located at apt 1, 1st story

    Feb 27, 2006 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective counter-top at sink in the kitchen located at apt 1, 1st story

    Feb 27, 2006 · Apt 1

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of concealed leak at ceiling inside closet in the 1st room from east at south located at apt 1, 1st story

    Feb 27, 2006 · Apt 1

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... present at upper northwall ( 2 sq.ft ) in the 1st room from east at south located at apt 1, 1st story

    Feb 27, 2006 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling and walls inside closet in the 1st room from east at south located at apt 1, 1st story

    Feb 27, 2006 · Apt 1

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective rotted wood floor in the kitchen located at apt 1, 1st story

    Feb 27, 2006 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the leaky and/or defective faucets wasteline under sink in the kitchen located at apt 1, 1st story

    Feb 27, 2006 · Apt 1

    Closed — Violation closed
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard

    Feb 27, 2006

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color walls in the bathroom located at apt 1, 1st story

    Feb 27, 2006 · Apt 1

    Closed — Violation closed
  • BHazardous

    Trace and repair the source and abate the nuisance consisting of mold ... present at lower westwall ( 2 sq.ft ) in the bathroom located at apt 1, 1st story

    Feb 27, 2006 · Apt 1

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at ceiling in the center room located at apt 1, 1st story

    Feb 27, 2006 · Apt 1

    Closed — Violation closed

DOB building violations

2 DOB violations, newest first.

  • Construction other optional

    C-construction other optional

    Apr 30, 1996

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Apr 5, 1996

    Vpw*-violation unserved ecb-work without permit-dismissed

ECB violations

5 ECB violations, newest first.

  • Class - 1

    Failure to maintain exterior building or appurtenances in that at the rear of bldg siding is missing(leaving) ext(sheeting) open to elements & structural rutting,gutter is hanging. remedy: maintain building.

    Sep 11, 2008 · Penalty $1,250

    Resolve
  • Hazardous

    Failure to maintain bldg. south elevation missing 6 x 15ft vinyl siding. sideyard filled w/ construction debris. cellar door is opened makesbldg accessible. remedy: maintain property repair defects.

    May 6, 2008 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain bldg. south elevation missing apprx 6 x15 ft vinylsiding. sideyard filled w/ construction debris. cellar door is open which makes bldg accessible. remedy: maintain & secure property.

    Mar 11, 2008 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work w/o a permit. in that a dormer has been constructed above 2nd fl& 2nd fl middle window has been blocked off. remedy: obtain approval & permit.

    Apr 1, 1999 · Penalty $2,500

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by building dept. records shows above premises as a 2 family dwelling. at present time 3 family living at above premises. remedy: stop illegal use forthwith.

    Aug 20, 1990 · Penalty $1,000

    Resolve