Violations at 60 North Burgher Avenue
Staten Island, NY 10310 · BBL 5-00169-0001 · Back to the property
HPD housing violations
The newest 50 of 505 HPD violations. The city keeps the complete history.
- CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at througout in the entire apartment located at apt 5a, 1st story, 2nd apartment from south at west
Oct 17, 2026 · Apt 5A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5a, 1st story, 2nd apartment from south at west
Oct 17, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5a, 1st story, 2nd apartment from south at west
Oct 17, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5b, 2nd story, 1st apartment from south at west
Sep 2, 2026 · Apt 5B
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 2nd story, 1st apartment from south at west
Sep 2, 2026 · Apt 5B
Open — Civ14 mailed - ANon-hazardous
Replace with new the missing electrical light switch cover at east wall in the bathroom located at apt 5a, 1st story, 2nd apartment from south at west
Aug 20, 2026 · Apt 5A
Open — Nov sent out - ANon-hazardous
Properly secure the loose washbasin in the bathroom located at apt 5a, 1st story, 2nd apartment from south at west
Aug 20, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective air conditioner sleeve at south wall in the 1st room from east located at apt 5a, 1st story, 2nd apartment from south at west
Aug 20, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at 1st closet from west at north in the 1st room from east located at apt 5a, 1st story, 2nd apartment from south at west
Aug 20, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartment located at apt 5a, 1st story, 2nd apartment from south at west
Aug 20, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft observed at west wall and ceiling at 1st closet from west at north in the 1st room from east located at apt 5a, 1st story, 2nd apartment from south at west
Aug 20, 2026 · Apt 5A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5a, 1st story, 2nd apartment from south at west
Aug 20, 2026 · Apt 5A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective formica countertop in the kitchen located at apt 5a, 1st story, 2nd apartment from south at west
Aug 20, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4c, 1st story, 2nd apartment from east at south
Aug 14, 2026 · Apt 4C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5b, 1st story, 1st apartment from west at north
Aug 13, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 1st story, 1st apartment from west at north
Aug 13, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5a, 1st story, 2nd apartment from south at west
Aug 12, 2026 · Apt 5A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective lighting fixture at building entrance at ceiling yard
Aug 2, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Jul 30, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at north wall in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west
Jul 30, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3b, 2nd story, 4th apartment from south at west
Jul 20, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 1st story, 1st apartment from south at west
Jul 18, 2026 · Apt 5A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5b, 1st story, 1st apartment from west at north
Jul 16, 2026 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room, 2nd story
Jul 16, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 1st story, 1st apartment from west at north
Jul 16, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5b, 1st story, 1st apartment from west at north
Jul 16, 2026 · Apt 5B
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4c, 1st story, 2nd apartment from east at south
Jul 14, 2026 · Apt 4C
Open — False certification - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4c upper level, 1st story, 2nd apartment from east at south
Jul 14, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4c, 1st story, 2nd apartment from east at south
Jul 14, 2026 · Apt 4C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4a, 1st story, 1st apartment from west at north
Jul 13, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 1st story, 1st apartment from west at north
Jul 13, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective formica counter tops in the kitchen located at apt 4a, 1st story, 1st apartment from west at north
Jul 13, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the entire apartment located at apt 5b, 2nd story, 1st apartment from south at west
Jun 29, 2026 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at secondary egress door at west in the 4th room from east located at apt 5b, 2nd story, 1st apartment from south at west
Jun 29, 2026 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3c, 2nd story, 3rd apartment from south at west
Jun 13, 2026 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3c lower level, 2nd story, 3rd apartment from south at west
Jun 13, 2026 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3c, 2nd story, 3rd apartment from south at west
Jun 13, 2026 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from east located at apt 3c lower level, 2nd story, 3rd apartment from south at west
Jun 10, 2026 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at top sash window at 2nd window from south in the 4th room from east located at apt 3a, 1st story, 1st apartment from east at south
Jun 2, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 4th room from east located at apt 3a, 1st story, 1st apartment from east at south
Jun 2, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at closet in the 4th room from east located at apt 3a, 1st story, 1st apartment from east at south
Jun 2, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 1st story, 1st apartment from east at south
Jun 2, 2026 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 1st story, 1st apartment from east at south
Jun 2, 2026 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3b, 2nd story, 4th apartment from south at west
May 16, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3b, 2nd story, 4th apartment from south at west
May 16, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats in the entire apartment located at apt 3b, 2nd story, 4th apartment from south at west
May 16, 2026 · Apt 3B
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 3c, 2nd story, 3rd apartment from south at west
Apr 29, 2026 · Apt 3C
Open — Invalid certification - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3c, 2nd story, 3rd apartment from south at west
Apr 29, 2026 · Apt 3C
Open — Invalid certification - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3c, 2nd story, 3rd apartment from south at west
Apr 29, 2026 · Apt 3C
Open — Invalid certification - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from east located at apt 3c, 2nd story, 3rd apartment from south at west
Apr 29, 2026 · Apt 3C
Open — Invalid certification
DOB building violations
The newest 50 of 51 DOB violations. The city keeps the complete history.
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 8, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 24, 2016
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 1, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 6, 2012
Dob violation - resolved - Construction other optional
C-construction other optional
May 16, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 12, 2011
Dob violation - resolved - Construction other optional
C-construction other optional
May 5, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
May 5, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
May 5, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
May 5, 2009
Dob violation - dismissed - Construction other optional
Stop all work under nb permit# 510027524 and alt1 permit # 510036382 f ailure to provide approved/accepted plans at jobsite at time of inspec tion remedy: stop all work provide plans call sep ex 212 422-1698 for appoi ntment to rescind stop work order
Feb 26, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Plumbing none
P-plumbing none
May 6, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 1, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 1, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 1, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 1, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 1, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 1, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 6, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 8, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 8, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
ECB violations
16 ECB violations, newest first.
- Class - 2
Failure to comply with commissioner's order contained in summons #39107476z issued on 03/01/2024, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Feb 11, 2025 · Penalty $625
Resolve - Class - 2
Found lochinvar knight(model# kbn 285) boiler in apt with corroded containment pan causing leak, maintain boiler; correct violating condition submit certificate of correction
Mar 1, 2024 · Penalty $625
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner. on 11-14-16 at apprx 9:15am i observed in apt 110-1b on the 2nd floor pvc piping being used for exhaust on a boiler. pvc piping is not longer permitted to be
Nov 14, 2016 · Penalty $2,500
Resolve - Class - 1
B154.36,38,50.50:hazardous-pvc venting on lochinvar condensing coilers is deteriorating-must replace immediately w/present code materials.36:lochinvar boiler not registered-replace/repair all listed violating c
Nov 18, 2015 · Penalty $1,000
Active - Class - 2
Gas being supplied to bldg w/o insp and cert by dob gas service was issued to the above address w/o dob authorization the source making heat is a rooftop unit which is listed on fixture count pw1 for permit #51
Feb 6, 2012
Resolve - Class - 2
Altered/changed bldg occupied w/o a valid c/o as per 28-118.3.1-28-118.3.2 noted that tco expired on 9.28.11 for alt #510036382. remedy: obtain a valid c/o or discontinue illegal use.
Feb 2, 2012 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg in a code-compliant manner. re: installation and maintenance of plumbing materials and equipment per pc 103.3. the following observations were made: improper drainage, use of materials
Feb 1, 2012 · Penalty $250
Resolve - Class - 2
Failure to maintain building walls or appurtenances. noted: at main entrance of community laundry facility overhead canopy awning is leaning& bulding at peak. provide cantilener support system or other means of
Jan 31, 2012 · Penalty $250
Resolve - Class - 2
Failure to maintain bldg in code compliant manner.failure to comply w/law for drainage system.noted:a man hole for storm drain in back yard of bldg 39 clogged.due to that storm water over flooded & enter in ap
Sep 17, 2010 · Penalty $2,500
Resolve - Class - 2
Sec. 28-105.11 misc violations. failure to post current work permit on construction site in a conspicuous location. note: work on going under nb permit #510027347 permit on fence expired 12/21/08.
Feb 26, 2009 · Penalty $300
Resolve - Class - 1
Sec. bc3307.7 misc violations. failure to provide an adequate construction fence. noted: work on going under nb permit #510026927 & fence permit #500862113 to erect & maintain plywood fence on the property line
Feb 26, 2009 · Penalty $800
Resolve - Class - 2
Sec. 28-105.11 misc violations. failure to post fence permit on construction site in a conspicuous location. noted: work on going & construction fence installed under nb permit #510026927 & fence permit #500862
Feb 26, 2009 · Penalty $300
Resolve - Class - 2
Sec. 28-105.11 27-194 misc violations failure to post work permit on construction site in a conspicuous location. noted: work on going under nb permit #510026936 permit not observed on any jobsite frontage.
Feb 26, 2009 · Penalty $300
Resolve - Class - 1
Sec. bc3301.2 misc violations. failure to provide 3 feet 6 inch guardrail or equivalent solid enclosure around all floor openings. noted: work on going under nb permit #510027524 perimeter of stair opening at
Feb 26, 2009 · Penalty $1,600
Resolve - Class - 2
Sec. 28-105.11 misc violations. failure to post work permit on construction site in a conspicuous location. noted: work on going under nb permit #510026936 permit not observed on any street frontage of jobsite.
Feb 26, 2009 · Penalty $300
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. observed smoking w/i jobsite in violation of nyc fire code 1404.1 observed 5 different workers smoking in walkways,backhoe/on sca
Feb 26, 2009 · Penalty $1,200
Resolve