roofy

245 Forest Avenue

Staten Island, NY 10301BBL 5-00130-0049Map

Owner of record: 245 Forest Ave Apt Corp

245 Forest Avenue is a walk-up apartment building built in 1968 in Staten Island, 10301. It has 13 residential units across 2 floors. The owner of record is 245 Forest Ave Apt Corp. HPD has recorded 66 housing violations here, most recently on April 30, 2026. 40 of the 50 most recent violations are still open.

HPD violations
66
DOB violations
18
ECB violations
0
HPD complaints
35

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 66

  • C

    Abate the infestation consisting of roaches in the entire apartment located at cellar apt 1a, 1st cellar apt from east at south

    Apr 30, 2026 · Apt 1A

    Open — Notice of issuance sent to tenant
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at cellar apt 1a, 1st cellar apt from east at south

    Apr 30, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Remove the illegal double cylinder key operated locking device at door at entrance located at cellar apt 1a, 1st cellar apt from east at south

    Apr 30, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at entrace door located at cellar apt 1a, 1st cellar apt from east at south

    Apr 30, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Replace with new the missing sliding doors on closet at east wall in the 2nd room from east at south located at bsmt-apt 1b, 2nd bsmt-apt from east at south

    Mar 17, 2026 · Apt 1B

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from east located at bsmt-apt 1b, 2nd bsmt-apt from east at south

    Mar 17, 2026 · Apt 1B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at bsmt-apt 1b, 2nd bsmt-apt from east at south

    Mar 17, 2026 · Apt 1B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at bsmt-apt 1b, 2nd bsmt-apt from east at south

    Mar 17, 2026 · Apt 1B

    Closed — Violation closed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the 2nd bathroom from east located at bsmt-apt 1b, 2nd bsmt-apt from east at south

    Mar 17, 2026 · Apt 1B

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective mechanical ventilation system at ceiling in the 2nd bathroom from east located at bsmt-apt 1b, 2nd bsmt-apt from east at south

    Mar 17, 2026 · Apt 1B

    Closed — Violation closed
Show 40 more ↓
  • B

    Properly secure the loose sliding doors on closet at north wall in the 1st room from east at south located at bsmt-apt 1b, 2nd bsmt-apt from east at south

    Mar 17, 2026 · Apt 1B

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at bsmt-apt 1b, 2nd bsmt-apt from east at south

    Mar 17, 2026 · Apt 1B

    Closed — Violation closed
  • B

    Properly secure the loose sliding doors on closet at north wall in the 2nd room from east at south located at bsmt-apt 1b, 2nd bsmt-apt from east at south

    Mar 17, 2026 · Apt 1B

    Open — Not complied with
  • C

    Properly repair or replace the broken or defective outter glass pane on lower sash at 1st window from east at south wall in the 1st room from east at south located at bsmt-apt 1a, 1st bsmt-apt from east at south

    Feb 6, 2026 · Apt 1A

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling and west wall in the bathroom located at cellar apt 1a, 1st cellar apt from east at south

    Feb 6, 2026 · Apt 1A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at cellar apt 1a, 1st cellar apt from east at south

    Feb 6, 2026 · Apt 1A

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at cellar apt 1a, 1st cellar apt from east at south

    Feb 6, 2026 · Apt 1A

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at cellar apt 1a, 1st cellar apt from east at south

    Feb 6, 2026 · Apt 1A

    Closed — Violation closed
  • B

    Properly secure the loose sliding closet doors at east wall in the private hallway located at cellar apt 1a, 1st cellar apt from east at south

    Feb 6, 2026 · Apt 1A

    Open — Not complied with
  • B

    Properly secure the loose sliding closet doors at north wall in the 2nd room from east at south located at cellar apt 1a, 1st cellar apt from east at south

    Feb 6, 2026 · Apt 1A

    Open — Not complied with
  • B

    Remove all obstructions and repair all defects in waste line under sink in the kitchen located at cellar apt 1a, 1st cellar apt from east at south

    Feb 6, 2026 · Apt 1A

    Open — Not complied with
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at cellar apt 1a, 1st cellar apt from east at south

    Feb 6, 2026 · Apt 1A

    Open — Not complied with
  • B

    Replace with new the missing mechanical water stopper at wash basin in the bathroom located at cellar apt 1a, 1st cellar apt from east at south

    Feb 6, 2026 · Apt 1A

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the visible evidence of mold on grout around bathtub and between ceramic tile at west wall in the bathroom located at cellar apt 1a, 1st cellar apt from east at south

    Feb 6, 2026 · Apt 1A

    Open — Not complied with
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at cellar apt 1a, 1st cellar apt from east at south

    Feb 6, 2026 · Apt 1A

    Open — Not complied with
  • C

    Remove device preventing door from being self-closing kick down door stop at 1st door from north at east at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at door to laundry room east at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing kick down door stop at building entrance door at cellar level

    Dec 29, 2025

    Open — Nov sent out
  • A

    Replace with new the missing safety caps at electrical outlet at west wall at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material all walls and ceiling at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • B

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination ceiling at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the laundry room east at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing kick down door stop at 1st door from south at west cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing kick down door stop at boiler room at west at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing kick down door stop at 3rd door from north at east cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective latch at laundry room door at east at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing kick down door stop at laundry room east at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak ceiling at laundry room east at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material ceiling at laundry room east at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items at cellar level at public hall

    Dec 29, 2025

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling at cellar level in the kitchen located at apt 1b, 2nd apartment from east at south

    Dec 29, 2025 · Apt 1B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door cellar level in the entrance located at apt 1b, 2nd apartment from east at south

    Dec 29, 2025 · Apt 1B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing at cellar level in the entire apartment located at apt 1b, 2nd apartment from east at south

    Dec 29, 2025 · Apt 1B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing at cellar level in the entire apartment located at apt 1b, 2nd apartment from east at south

    Dec 29, 2025 · Apt 1B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling at cellar level in the private hallway located at apt 1b, 2nd apartment from east at south

    Dec 29, 2025 · Apt 1B

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective mechanical air vent at ceiling at cellar level in the 1st bathroom from north located at apt 1b, 2nd apartment from east at south

    Dec 29, 2025 · Apt 1B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling at cellar level in the 1st bathroom from north located at apt 1b, 2nd apartment from east at south

    Dec 29, 2025 · Apt 1B

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at cellar level in the 1st bathroom from north located at apt 1b, 2nd apartment from east at south

    Dec 29, 2025 · Apt 1B

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in washbasin wasteline at cellar level in the 2nd bathroom from north located at apt 1b, 2nd apartment from east at south

    Dec 29, 2025 · Apt 1B

    Open — Nov sent out

DOB building violations · 18

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
Show 8 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Plumbing

    Water supply

    Mar 10, 2026 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Mar 6, 2026 · Apt 2D

    Close
  • Unsanitary condition

    Mold

    Mar 6, 2026 · Apt 2D

    Close
  • Water leak

    Heavy flow

    Mar 6, 2026 · Apt 2D

    Close
  • Heat/hot water

    Apartment only

    Mar 6, 2026 · Apt 2D

    Close
  • Plumbing

    Water supply

    Mar 4, 2026 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Mar 4, 2026 · Apt 2E

    Close
  • Plumbing

    Bathtub/shower

    Mar 4, 2026 · Apt 2E

    Close
  • Heat/hot water

    Apartment only

    Feb 14, 2026 · Apt 1B

    Close
  • Plumbing

    Water supply

    Feb 4, 2026 · Apt 1A

    Close
Show 25 more ↓
  • Appliance

    Electric/gas range

    Feb 4, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Feb 4, 2026 · Apt 1A

    Close
  • Safety

    Carbon monoxide detector

    Jan 31, 2026 · Apt 1B

    Close
  • Door/window

    Door

    Jan 31, 2026 · Apt 1B

    Close
  • General

    Ventilation system

    Jan 31, 2026 · Apt 1B

    Close
  • Plumbing

    Basin/sink

    Jan 31, 2026 · Apt 1B

    Close
  • Plumbing

    Toilet

    Jan 31, 2026 · Apt 1B

    Close
  • Safety

    Smoke detector

    Jan 31, 2026 · Apt 1B

    Close
  • Plumbing

    Bathtub/shower

    Jan 31, 2026 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 1, 2026 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 22, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 14, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 7, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 7, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 24, 2018 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 24, 2018 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 12, 2015 · Apt BLDG

    Close
  • General

    Mold

    Nov 11, 2011 · Apt 1B

    Close
  • Nonconst

    Vermin

    Nov 11, 2011 · Apt 1B

    Close
  • General

    Floor

    Nov 11, 2011 · Apt 1B

    Close
  • Plumbing

    Water-leaks

    Oct 5, 2006 · Apt 2D

    Close

Sales history

DatePriceTypeUnits
Dec 4, 2025$2,000,000Coops - walkup apartments—
Dec 4, 2025$1,000,000Coops - walkup apartments—
Dec 4, 2025$2,000,000Coops - walkup apartments—
Dec 4, 2025$1,000,000Coops - walkup apartments—
Dec 4, 2025$2,000,000Coops - walkup apartments—
Dec 4, 2025$2,000,000Coops - walkup apartments—
Dec 4, 2025$2,000,000Coops - walkup apartments—
Dec 4, 2025$1,000,000Coops - walkup apartments—
Dec 4, 2025$2,000,000Coops - walkup apartments—
Dec 4, 2025$1,000,000Coops - walkup apartments—
Dec 4, 2025$2,000,000Coops - walkup apartments—
Dec 4, 2025$1,000,000Coops - walkup apartments—
Dec 4, 2025$2,000,000Coops - walkup apartments—
Dec 4, 2025$1,000,000Coops - walkup apartments—
Dec 4, 2025$1,000,000Coops - walkup apartments—
Dec 4, 2025$2,000,000Coops - walkup apartments—
Dec 4, 2025$1,000,000Coops - walkup apartments—
Dec 4, 2025$2,000,000Coops - walkup apartments—
Dec 4, 2025$1,000,000Coops - walkup apartments—
Dec 4, 2025$2,000,000Coops - walkup apartments—

Building details

Building type
Walk-up apartment building (C6)
Year built
1968
Floors
2
Residential units
13
Building area
9,810 ft²
Lot area
10,000 ft²
Zoning
R3A
Community board
501
Council district
49
Block / lot
130 / 49
Assessed value
$349,650
Landmark / historic district
No

HPD registration #500951, last renewed Dec 23, 2025.

Questions about 245 Forest Avenue

Who owns 245 Forest Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 245 Forest Ave Apt Corp.

Does 245 Forest Avenue have violations?

Yes. NYC HPD has recorded 66 housing violations at this property.

Is 245 Forest Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 245 Forest Avenue built?

City records list 1968 as the year it was built.

How many apartments are in 245 Forest Avenue?

It has 13 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.