Violations at 147 Beach 116 Street
Queens · BBL 4-16226-0025 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
17 DOB violations, newest first.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 19, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 19, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 18, 2019
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Oct 18, 2019
Vp*-violation unserved ecb- dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - active
ECB violations
23 ECB violations, newest first.
- Class - 1
Bc3307.4 work & storage zone.note:at the time of my inspection of a 8 story new bldg i observed from street level material stored in roadwaycmu blocks w/no barries enclosing storage.this creates an unsafe &
Apr 2, 2020
Resolve - Class - 2
Bc3301.6 desogn drawing required by chapter 33 @the time my inspectionit was observed an active construction site with cmu block installation @exp#3 where it was noted that the platform installed on top of the
Oct 18, 2019
Resolve - Class - 2
Sec. 3307.6.5.5 cleaning of the decks of sidewalk shed. at the time ofmy inspection it was observed an active construction site where it wasnoted that the sidewalk shed installed at exp#1 was not cleaned as per
Oct 18, 2019
Resolve - Class - 2
Posting of unlawful signs information,pictorial representation,business or advertising messages on protective structures. at the time of my inspection it was observed that on a active construction it was observ
Oct 18, 2019
Resolve - Class - 2
Cease use 26-x-10. top emergency exit cover switch 19 not operative. this is a safety device to ensure (elevator) hoist passengers safety.
Oct 7, 2019 · Penalty $312
Resolve - Class - 2
3303.4.2containers with debris.at the time of my inspection of an 8 story bld.at roof level with construction operations in progress,i observed an open debris container in traffic lane @exp#1 with debris/trash
Apr 26, 2019
Resolve - Class - 1
Failure to maintain adequate housekeeping.at the time of my inspectionof an 8 story bld.at roof level with construction operations in progress,i observed brick,wood & foam insulation debris on floor @ ground le
Apr 26, 2019 · Penalty $625
Resolve - Class - 1
3303.8 stand pipe not in readiness.at the time of my inspection of an 8 story bld.at roof level with construction operations in progress,i observed the standpipe not painted red from the 6th fl.up.conditions cr
Apr 26, 2019 · Penalty $625
Resolve - Class - 1
Failure to institute/maintain safety equipment measures(guardrails)at the time of my inspection of an 8 story bld.at roof level with construction operations in progress,i observed inadequate guardrail systems @
Apr 26, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide or designate super/competent person as required.at the time of my inspection of an 8 story bld.at roof level with construction operations in progress,i observed approx.10 workers on site perf
Apr 26, 2019 · Penalty $10,000
Resolve - Class - 1
Bc3314.3.4/load imposed.note;at the time of my inspectioon of a 8 story building at roof level construction work in progress i observed approximately 50ft of supported pipe scaffold(height)erected on approximat
Jan 8, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.institute maintain safety equipment measures at time of inspection of an 8 story building construction work in progress.i observe
Jan 8, 2019 · Penalty $2,500
Resolve - Class - 2
Bc3308.6.1.4/horizontal safety netting system.note:at the time of my inspection of a 8 story building at roof level approximately 85ft in height construction work in progress.i observed supported scaffold syste
Jan 8, 2019 · Penalty $625
Resolve - Class - 2
Failure to safeguard all persons and property affected by construction operations.at time of inspection i observed vertical 2x4 loose at corner of epx#1 and exp#4.the 2x4 is not connected properly and is a haza
Dec 31, 2018 · Penalty $400
Resolve - Class - 2
Pedestrian protection does not meet code specifications#3314.1.at time of inspection i observed supported scaffold in place 48 ft high .(1) missing cross bracesat exp #1.(2)failure to provide debris netting .fa
Dec 24, 2018 · Penalty $2,400
Resolve - Class - 2
Pedestrian protetcion does not meet code specifications#3307.6.4.4.at time of inspection i observed sidewalk shed and supported scaffold in place.i observed the sidewalk shed was less than 18 inches from the cu
Dec 24, 2018 · Penalty $2,400
Resolve - Class - 2
Project info panel not provided sw shed parapet panel 8 sty new bldg under construction,in active job site at the time of inspection i observed there was no project into panel for the sws provide as per code.
Nov 23, 2018
Resolve - Class - 1
Bc 1906.6.1.2 failure to secure reshores in proximity to the facade as noted: at time of inspection active site i observed t 4th floor exp3failre to secure reshores in proximity to facade reshore shall be secu
Nov 15, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to have construction superintendent present at site as required. as noted: at time of my inspection (active construction site) i observed no superintendent or competent person present at site. rem: stop
Aug 24, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all persons & property. at time of inspection on an active jobsite, i observed rebar and construction material hoisted @ exp 1 in proximity to a high power line (approx w/5ft of powerline).
Aug 2, 2018
Resolve - Class - 1
Bc3309.1 overhead protection adjacent property. at time of inspection on an active jobsite, observed concrete decking and rebar operation in progress at exp #3. observed overhead protection of property adjacent
Aug 2, 2018
Resolve - Class - 2
Bc3301.2 failure to institute and maintain safety equipment. at time of inspection of an active job site, i observed at 3rd fl working deck, no safety measures in place to safeguard persons accessing area witho
Aug 2, 2018
Resolve - Class - 2
Failure to maintain building walls or appurtenances. partial collapsedfence approx 60 linear feet long unto street sidewalk along beach 117 st creating unsafe conditions to the public with defective fence metal
Mar 18, 2010
Resolve