105-38 Rockaway Beach Blvd
Queens, NY 11694BBL 4-16178-0080Map
Owner of record: 105 Rockaway Realty LLC
105-38 Rockaway Beach Blvd is an office building built in 2018 in Queens, 11694. The owner of record is 105 Rockaway Realty LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 12
- ECB violations
- 10
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 12
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed
Show 2 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed
ECB violations · 10
- Class - 1
Temp cert. of occupancy(expired). at time of inspection of a 4 story nb,i observed the fourth(4) fl occupied and in use as a medical facility. upon review of the c of o's,the latest temp c of o on bis file was
Dec 14, 2019
Resolve - Class - 3
Failure to maintain.noted:premises is vacant lot.chairlink fence erected.pareial chain link fence collapsed.approx 100'ft long.rem:repair fence.
May 10, 2018
Resolve - Class - 1
Construction superintendent fails to maintain/make job site logs available. at the time of inspection of a 4 story steel framed building at 3rd floor level. active work site, upon request for the construction s
Aug 12, 2017 · Penalty $400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temp const.no toeboards @the time of insp of a new 4 story steel framed bldg @3rdfl level,active work site i observed that there were no toeboards prov
Aug 12, 2017 · Penalty $1,000
Resolve - Class - 1
Bc 3308.5 vertical netting missing/inadequate-- failure to install netting system.@time of insp of a new 4 story steel framed bldg @3rd fl level active work site. i observed that there no vertical nettng system
Aug 12, 2017 · Penalty $1,600
Resolve - Class - 1
Bc 3301.2 failure to provide adequate means of egress/ingress @the time of insp of a story steel framed nb @3rd fl level active jobsite.i observed that there were inadequate means of egress leading from 1st fl
Aug 12, 2017
Resolve - Class - 1
Construction superintendent fail to perform duties as per rule. the following hazardous conditions were observed and stop work order issued on this date at this site (1)missing vertical netting system. (2) no t
Aug 12, 2017 · Penalty $10,000
Resolve - Class - 1
Failure to designate and/or have construction superintendent present at site when required at time of inspection of a 4story steel framed building @ 3rd floor level, active job site. upon request for the const
Aug 12, 2017
Resolve - Class - 2
Fence. at time of inspection observed job site fence not in compliance1-fence missing 4'x8'section on rockaway beach boulevard adjacent to bus stop; 2-missing vision panels along 105 st and rockaway freeway; 3-
Jul 8, 2017 · Penalty $400
Resolve - Class - 2
Work does not conform to approved plan. note: observed sidewalk shed is in place. -the junior beams erected in a distance more than 2'in between. the construction fence connected to the sw shed. all that does
Jun 30, 2017
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O2)
- Year built
- 2018
- Floors
- 3
- Residential units
- —
- Building area
- 50,490 ft²
- Lot area
- 65,150 ft²
- Zoning
- R5D
- Community board
- 414
- Council district
- 32
- Block / lot
- 16178 / 80
- Assessed value
- $3,878,100
- Landmark / historic district
- No
Questions about 105-38 Rockaway Beach Blvd
Who owns 105-38 Rockaway Beach Blvd?
The owner of record in NYC Department of City Planning PLUTO data is 105 Rockaway Realty LLC.
Does 105-38 Rockaway Beach Blvd have violations?
NYC HPD has no housing violations on record for this property.
Is 105-38 Rockaway Beach Blvd rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 105-38 Rockaway Beach Blvd built?
City records list 2018 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.