roofy

90-16 Rockaway Beach Blvd

Queens, NY 11693BBL 4-16124-0119Map

Owner of record: 90-16 R B B INC

90-16 Rockaway Beach Blvd is a mixed residential and retail building built in 1930 in Queens, 11693. It has 3 residential units across 2 floors. The owner of record is 90-16 R B B INC. HPD has recorded 19 housing violations here, most recently on November 27, 2023.

HPD violations
19
DOB violations
12
ECB violations
1
HPD complaints
41

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Nov 27, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 19

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 8, 2022

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of excessive heat in summer time in the entire apartment located at apt 3, 2nd story, 2nd apartment from south at west

    Aug 17, 2021 · Apt 3

    Closed — Violation dismissed
  • C

    Arrange and make self-closing the doors .. in the entrance located at apt 2f, 2nd story, apartment at south

    Nov 12, 2020 · Apt 2F

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 24, 2018

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Oct 10, 2018

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in drain at bathtub in the bathroom located at apt 1f, 1st story, apartment at east , section ''210 b91'', at north

    Oct 6, 2016 · Apt 1F

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in drain at washbasin in the bathroom located at apt 1f, 1st story, apartment at east , section ''210 b91'', at north

    Oct 6, 2016 · Apt 1F

    Closed — Violation closed
  • B

    Properly repair the broken or defective electrical light fixture at the ceiling in the bathroom located at apt 1f, 1st story, apartment at east , section ''210 b91'', at north

    Oct 6, 2016 · Apt 1F

    Closed — Violation closed
Show 9 more ↓
  • B

    Remove all encumbrances consisting of plastic containers, furniture, clothes rack and other house hold items at public hall, 2nd story

    Oct 6, 2016

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 16, 2015

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east

    Mar 17, 2006 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall in the 1st private hallway located at apt 2f, 2nd story, 1st apartment from north at east

    Mar 17, 2006 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall in the 2nd room from east located at apt 2f, 2nd story, 1st apartment from north at east

    Mar 17, 2006 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the 3rd room from east at south located at apt 2f, 2nd story, 1st apartment from north at east

    Mar 14, 2006 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east

    Mar 14, 2006 · Apt 2F

    Closed — Violation closed
  • A

    D26-12.03 adm code paint to the satisfaction of this department the exterior window frames and sashes all stys all sides & bldg thruout.

    Jan 14, 1981

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at 1 sty pub hall frame missing.

    Jan 14, 1981

    Closed — Violation closed

DOB building violations · 12

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Zoning none

    Z-zoning none

    Aug 27, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
Show 2 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed

ECB violations · 1

  • Non-hazardous

    4a-low water cutoff missing.

    Mar 31, 1998

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Aug 16, 2021 · Apt 3

    Close
  • Plumbing

    Boiler

    Dec 14, 2017 · Apt 2

    Close
  • Paint/plaster

    Wall

    Sep 27, 2013 · Apt 1F

    Close
  • Electric

    Wiring

    Sep 27, 2013 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Sep 27, 2013 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Sep 27, 2013 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Sep 27, 2013 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Sep 27, 2013 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Mar 13, 2006 · Apt 2F

    Close
  • General

    Doors

    Mar 13, 2006 · Apt 2F

    Close
Show 31 more ↓
  • General

    Mold

    Mar 13, 2006 · Apt 2F

    Close
  • Nonconst

    Vermin

    Mar 13, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Mar 13, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Mar 12, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Mar 12, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Mar 11, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Mar 10, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Mar 3, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Mar 3, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Mar 2, 2006 · Apt 2F

    Close
  • Electric

    Electric-supply

    Mar 2, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Feb 28, 2006 · Apt 2F

    Close
  • General

    Windows

    Feb 24, 2006 · Apt 2F

    Close
  • Plumbing

    Water-leaks

    Feb 24, 2006 · Apt 2F

    Close
  • General

    Windows

    Feb 24, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Feb 24, 2006 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Feb 13, 2006 · Apt 2F

    Close
  • General

    Windows

    Feb 13, 2006 · Apt 2F

    Close
  • Plumbing

    Radiator

    Feb 13, 2006 · Apt 2F

    Close
  • Heating

    Heat related

    Feb 13, 2006 · Apt 2F

    Close
  • Plumbing

    Bathtub/shower

    Feb 13, 2006 · Apt 2F

    Close
  • General

    Windows

    Nov 1, 2005 · Apt 1

    Close
  • General

    Mold

    Nov 1, 2005 · Apt 1

    Close
  • General

    Doors

    Jul 1, 2004 · Apt 1F

    Close
  • Plumbing

    Water supply

    Jul 1, 2004 · Apt 1F

    Close
  • Plumbing

    Water supply

    Jul 1, 2004 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Jul 1, 2004 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Jul 1, 2004 · Apt 1F

    Close
  • Plumbing

    Bathtub/shower

    Jul 1, 2004 · Apt 1F

    Close
  • General

    Mold

    Jul 1, 2004 · Apt 1F

    Close
  • General

    Mold

    Jul 1, 2004 · Apt 1F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S9)
Year built
1930
Floors
2
Residential units
3
Building area
7,600 ft²
Lot area
5,300 ft²
Zoning
R5B
Community board
414
Council district
32
Block / lot
16124 / 119
Assessed value
$630,900
Landmark / historic district
No

HPD registration #407551, last renewed Sep 25, 2025.

Questions about 90-16 Rockaway Beach Blvd

Who owns 90-16 Rockaway Beach Blvd?

The owner of record in NYC Department of City Planning PLUTO data is 90-16 R B B INC.

Does 90-16 Rockaway Beach Blvd have violations?

Yes. NYC HPD has recorded 19 housing violations at this property.

Is 90-16 Rockaway Beach Blvd rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 90-16 Rockaway Beach Blvd built?

City records list 1930 as the year it was built.

How many apartments are in 90-16 Rockaway Beach Blvd?

It has 3 residential units and 5 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.