3-32 Beach 91 Street
Queens, NY 11693BBL 4-16124-0023Map
Owner of record: White, William R
3-32 Beach 91 Street is an one-family home built in 1930 in Queens, 11693. It has 1 residential unit across 2.5 floors. The owner of record is White, William R. HPD has recorded 161 housing violations here, most recently on August 26, 2026. 21 of the 50 most recent violations are still open.
- HPD violations
- 161
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 0
Available now in this building
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 161
- ANon-hazardous
Properly repair with similar material the broken or defective wood entrance door in the bathroom located at apt 1h, 1st story, 4th apartment from west at north
Aug 26, 2026 · Apt 1H
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective caulking around shower in the bathroom located at apt 1h, 1st story, 4th apartment from west at north
Aug 26, 2026 · Apt 1H
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood door at entrance in the bathroom located at apt 1h, 1st story, 4th apartment from west at north
Aug 23, 2026 · Apt 1H
Open — Nov sent out - BHazardous
Repair the broken or defective connection leaking waste line under sink in the kitchen located at apt 1h, 1st story, 4th apartment from west at north
Aug 23, 2026 · Apt 1H
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 1h, 1st story, 4th apartment from west at north
Aug 23, 2026 · Apt 1H
Open — Nov sent out - BHazardous
Provide in the event of a power outage an acceptable heavy duty mechanical lock set building entrance to public hall , 1st story
Jun 19, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed on building entrance door to public hall , 1st story
Jun 19, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 19, 2026
Open — Nov certified on time - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor, 1st story
Jun 19, 2026
Open — Nov certified on time - CImmediately hazardous
Remove all obstructions and repair all defects in wash basin waste line in the bathroom located at apt 1h, 1st story, 4th apartment from west at north
Jun 19, 2026 · Apt 1H
Open — Nov sent out
Show 40 more ↓
- BHazardous
M/d law abate the nuisance consisting of orange plastic cover on sprinkler head south wall in the 1st room from north located at apt 1h, 1st story, 4th apartment from west at north
Jun 19, 2026 · Apt 1H
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet in the bathroom located at apt 1h, 1st story, 4th apartment from west at north
Jun 19, 2026 · Apt 1H
Open — Nov sent out - BHazardous
Provide in the event of a power outage by a means of an acceptable mechanical heavy duty lock set building entrance door , 1st story
Jun 18, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed on building entrance door , 1st story
Jun 18, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges 2nd from south at east, heating room entrance, at roof
Jun 18, 2026
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste drain line at wash basin in the bathroom located at apt 1h, 1st story, 4th apartment from west at north
Jun 4, 2026 · Apt 1H
Open — Nov sent out - CImmediately hazardous
Replace the broken or defective water closet in the bathroom located at apt 1h, 1st story, 4th apartment from west at north
Jun 4, 2026 · Apt 1H
Open — Nov sent out - ANon-hazardous
Replace with new the missing vent cover at ventilation system in the kitchen located at apt 2i, 2nd story, 5th apartment from west at north
Apr 6, 2026 · Apt 2I
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the kitchen located at apt 2i, 2nd story, 5th apartment from west at north
Apr 6, 2026 · Apt 2I
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic wall and floor tiles at shower at east in the bathroom located at apt 2i, 2nd story, 5th apartment from west at north
Apr 6, 2026 · Apt 2I
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroom located at apt 2i, 2nd story, 5th apartment from west at north
Apr 6, 2026 · Apt 2I
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in shower area in the bathroom located at apt 2i, 2nd story, 5th apartment from west at north
Apr 6, 2026 · Apt 2I
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 1st room from north located at apt 1h, 1st story, 4th apartment from west at north
Mar 24, 2026 · Apt 1H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in closet in the 1st room from north located at apt 1h, 1st story, 4th apartment from west at north
Mar 24, 2026 · Apt 1H
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in closet in the 1st room from north located at apt 1h, 1st story, 4th apartment from west at north
Mar 24, 2026 · Apt 1H
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1h, 1st story, 4th apartment from west at north
Mar 24, 2026 · Apt 1H
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1h, 1st story, 4th apartment from west at north
Mar 24, 2026 · Apt 1H
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system .door locked at cellar at boiler room
Mar 24, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1h, 1st story, 4th apartment from west at north
Mar 19, 2026 · Apt 1H
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 19, 2026
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 19, 2026
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Mar 19, 2026
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood base molding at north and south walls at public hall, 1st story, section at north
Mar 19, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system . door locked at cellar at boiler room
Mar 19, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 1st room from north located at apt 1h, 1st story, 4th apartment from west at north
Mar 19, 2026 · Apt 1H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the kitchen located at apt 1h, 1st story, 4th apartment from west at north
Mar 19, 2026 · Apt 1H
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Mar 19, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 1st story, section at north
Mar 19, 2026
Closed — Violation closed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Mar 19, 2026
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood door at closet in the private hallway located at apt 1h, 1st story, 4th apartment from west at north
Mar 18, 2026 · Apt 1H
Open — Not complied with - ANon-hazardous
Paint metal in accordance with dept. regulation door frame in the bathroom located at apt 1h, 1st story, 4th apartment from west at north
Mar 18, 2026 · Apt 1H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall, ceiling and south wall in the bathroom located at apt 1h, 1st story, 4th apartment from west at north
Mar 18, 2026 · Apt 1H
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1h, 1st story, 4th apartment from west at north
Mar 18, 2026 · Apt 1H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1h, 1st story, 4th apartment from west at north
Mar 18, 2026 · Apt 1H
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood door at closet in the 1st room from north located at apt 1h, 1st story, 4th apartment from west at north
Mar 18, 2026 · Apt 1H
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in closet in the 1st room from north located at apt 1h, 1st story, 4th apartment from west at north
Mar 18, 2026 · Apt 1H
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in closet in the 1st room from north located at apt 1h, 1st story, 4th apartment from west at north
Mar 18, 2026 · Apt 1H
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from north located at apt 1h, 1st story, 4th apartment from west at north
Mar 18, 2026 · Apt 1H
Closed — Violation closed - CImmediately hazardous
Remove all obstructions and repair all defects in wash basin waste line in the bathroom located at apt 1h, 1st story, 4th apartment from west at north
Mar 4, 2026 · Apt 1H
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of orange plastic cover on sprinkler head south wall in the 1st room from north located at apt 1h, 1st story, 4th apartment from west at north
Mar 4, 2026 · Apt 1H
Open — Not complied with
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- One-family home (A5)
- Year built
- 1930
- Floors
- 2.5
- Residential units
- 1
- Building area
- 1,606 ft²
- Lot area
- 2,500 ft²
- Zoning
- R4-1
- Community board
- 414
- Council district
- 32
- Block / lot
- 16124 / 23
- Assessed value
- $44,100
- Landmark / historic district
- No
HPD registration #434203, last renewed Aug 29, 2025.
Questions about 3-32 Beach 91 Street
Who owns 3-32 Beach 91 Street?
The owner of record in NYC Department of City Planning PLUTO data is White, William R.
Does 3-32 Beach 91 Street have violations?
Yes. NYC HPD has recorded 161 housing violations at this property.
Is 3-32 Beach 91 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3-32 Beach 91 Street built?
City records list 1930 as the year it was built.
How many apartments are in 3-32 Beach 91 Street?
It has 1 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.
