roofy

431 Beach 66 Street

Queens, NY 11692BBL 4-16040-0056Map

Owner of record: 431 Beach 66 LLC

431 Beach 66 Street is a walk-up apartment building built in 1920 in Queens, 11692. It has 3 residential units across 3 floors. The owner of record is 431 Beach 66 LLC. HPD has recorded 63 housing violations here, most recently on May 7, 2026. 37 of the 50 most recent violations are still open.

HPD violations
63
DOB violations
0
ECB violations
0
HPD complaints
40

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 63

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3, 3rd story, 1st apartment from west at north

    Mar 7, 2025 · Apt 3

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling. in the kitchen located at apt 3, 3rd story, 1st apartment from west at north

    Mar 7, 2025 · Apt 3

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective glass at upper east window sash . in the 1st room from east located at apt 3, 3rd story, 1st apartment from west at north

    Mar 7, 2025 · Apt 3

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the 3rd room from east located at apt 3, 3rd story, 1st apartment from west at north

    Mar 7, 2025 · Apt 3

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tile floor. in the bathroom located at apt 3, 3rd story, 1st apartment from west at north

    Mar 7, 2025 · Apt 3

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the kitchen located at apt 3, 3rd story, 1st apartment from west at north

    Mar 7, 2025 · Apt 3

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Mar 7, 2025 · Apt 3

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Mar 7, 2025

    Open — Nov sent out
Show 40 more ↓
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 7, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 7, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Mar 7, 2025

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Mar 7, 2025

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Mar 7, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges. in the entrance located at apt 3, 3rd story, 1st apartment from west at north

    Mar 7, 2025 · Apt 3

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at front entrance to building.

    Mar 7, 2025

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor. at public hall, 2nd story

    Mar 22, 2023

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood riser 1st from top. at public hall stairs, 1st story

    Mar 22, 2023

    Open — Invalid certification
  • C

    Replace or repair the self-closing doors that is missing or defective ..

    Mar 22, 2023

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective. in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Mar 22, 2023 · Apt 2

    Open — Invalid certification
  • B

    Repair or replace the smoke detector defective. in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Mar 22, 2023 · Apt 2

    Open — Invalid certification
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 2, 2nd story, 1st apartment from west at north

    Mar 22, 2023 · Apt 2

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub. in the bathroom located at apt 2, 2nd story, 1st apartment from west at north

    Mar 22, 2023 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the kitchen located at apt 2, 2nd story, 1st apartment from west at north

    Mar 22, 2023 · Apt 2

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective ceramic tile floor. in the kitchen located at apt 2, 2nd story, 1st apartment from west at north

    Mar 22, 2023 · Apt 2

    Closed — Violation closed
  • A

    Refit all window sashes. in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Mar 22, 2023 · Apt 2

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in at washbasin. in the bathroom located at apt 2, 2nd story, 1st apartment from west at north

    Mar 22, 2023 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the bathroom located at apt 2, 2nd story, 1st apartment from west at north

    Mar 22, 2023 · Apt 2

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling. in the bathroom located at apt 2, 2nd story, 1st apartment from west at north

    Mar 22, 2023 · Apt 2

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling. in the kitchen located at apt 2, 2nd story, 1st apartment from west at north

    Mar 22, 2023 · Apt 2

    Open — Invalid certification
  • B

    Trace and repair the source and abate the visible mold condition... around bathtub.(apprx.3 sq.ft). in the bathroom located at apt 3, 3rd story, 1st apartment from west at north original violation 15626171 issued 23-dec-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Dec 23, 2022 · Apt 3

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor. in the 1st room from east located at apt 3, 3rd story, 1st apartment from west at north

    Dec 23, 2022 · Apt 3

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the 3rd room from east located at apt 3, 3rd story, 1st apartment from west at north

    Dec 23, 2022 · Apt 3

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Dec 23, 2022 · Apt 3

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Dec 23, 2022 · Apt 3

    Open — Notice of issuance sent to tenant
  • B

    Repair or replace the carbon monoxide detecting device(s). defective. in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Dec 23, 2022 · Apt 3

    Open — Nov sent out
  • B

    Properly repair the broken or defective base cabinet at north wall. in the kitchen located at apt 3, 3rd story, 1st apartment from west at north

    Dec 23, 2022 · Apt 3

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceilings. in the bathroom located at apt 3, 3rd story, 1st apartment from west at north

    Dec 23, 2022 · Apt 3

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... around bathtub.(apprx.3 sq.ft). in the bathroom located at apt 3, 3rd story, 1st apartment from west at north

    Dec 23, 2022 · Apt 3

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3, 3rd story, 1st apartment from west at north

    Dec 23, 2022 · Apt 3

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    Dec 23, 2022

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective. in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Dec 23, 2022 · Apt 3

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 22, 2022

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Dec 22, 2022

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective at front entrance to building.

    Dec 22, 2022

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Dec 22, 2022

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Dec 22, 2022

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Dec 22, 2022

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Apartment only

    Mar 6, 2025 · Apt 3

    Close
  • Plumbing

    Toilet

    Mar 6, 2025 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Mar 6, 2025 · Apt 3

    Close
  • Water leak

    Slow leak

    Mar 6, 2025 · Apt 3

    Close
  • Door/window

    Window pane

    Mar 6, 2025 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Mar 6, 2025 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Mar 6, 2025 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Mar 6, 2025 · Apt 3

    Close
  • Paint/plaster

    Wall

    Sep 12, 2023 · Apt 2

    Close
  • Water leak

    Slow leak

    Sep 12, 2023 · Apt 2

    Close
Show 30 more ↓
  • Paint/plaster

    Ceiling

    Sep 12, 2023 · Apt 2

    Close
  • General

    Cabinet

    Sep 12, 2023 · Apt 2

    Close
  • General

    Cabinet

    Sep 12, 2023 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Sep 12, 2023 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Sep 12, 2023 · Apt 2

    Close
  • Electric

    Lighting

    Sep 12, 2023 · Apt 2

    Close
  • Door/window

    Window frame

    Sep 12, 2023 · Apt 2

    Close
  • Paint/plaster

    Wall

    Sep 12, 2023 · Apt 2

    Close
  • Electric

    Wiring

    Sep 12, 2023 · Apt 2

    Close
  • Electric

    Power outage

    Jun 28, 2023 · Apt 2

    Close
  • Water leak

    Heavy flow

    Mar 21, 2023 · Apt 2

    Close
  • Water leak

    Slow leak

    Mar 21, 2023 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Mar 21, 2023 · Apt 2

    Close
  • Door/window

    Window frame

    Mar 21, 2023 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Mar 21, 2023 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Mar 21, 2023 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Mar 21, 2023 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Mar 21, 2023 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Mar 21, 2023 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2022 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Dec 21, 2022 · Apt 3

    Close
  • Safety

    Smoke detector

    Dec 21, 2022 · Apt 3

    Close
  • General

    Cabinet

    Dec 21, 2022 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Dec 21, 2022 · Apt 3

    Close
  • Safety

    Window guard broken/missing

    Dec 21, 2022 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Dec 21, 2022 · Apt 3

    Close
  • Safety

    Carbon monoxide detector

    Dec 21, 2022 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Dec 21, 2022 · Apt 3

    Close
  • Paint/plaster

    Cabinet

    Dec 21, 2022 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Dec 21, 2022 · Apt 3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1920
Floors
3
Residential units
3
Building area
3,130 ft²
Lot area
4,000 ft²
Zoning
R4-1
Community board
414
Council district
31
Block / lot
16040 / 56
Assessed value
$47,280
Landmark / historic district
No

HPD registration #410286, last renewed Oct 9, 2025.

Questions about 431 Beach 66 Street

Who owns 431 Beach 66 Street?

The owner of record in NYC Department of City Planning PLUTO data is 431 Beach 66 LLC.

Does 431 Beach 66 Street have violations?

Yes. NYC HPD has recorded 63 housing violations at this property.

Is 431 Beach 66 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 431 Beach 66 Street built?

City records list 1920 as the year it was built.

How many apartments are in 431 Beach 66 Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.