Violations at 40-22 Beach Channel Drive
Queens, NY 11691 · BBL 4-15960-0060 · Back to the property
HPD housing violations
14 HPD violations, newest first.
- BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt 12d, 12th story, apartment at west
Mar 18, 2015 · Apt 12D
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet --- in the bathroom located at apt 12d, 12th story, apartment at west
Mar 18, 2015 · Apt 12D
Open — Nov sent out - BHazardous
Replace with new the broken or defective gasket at refrigerator door in the kitchen located at apt 12d, 12th story, apartment at west
Mar 18, 2015 · Apt 12D
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line under sink in the kitchen located at apt 12d, 12th story, apartment at west
Mar 18, 2015 · Apt 12D
Open — Nov sent out - BHazardous
Properly repair the broken or defective lower sash counter balance window in the kitchen located at apt 12d, 12th story, apartment at west
Mar 18, 2015 · Apt 12D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls at closet in the 1st room from north located at apt 4b, 4th story, apartment at north
Mar 18, 2015 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & ceiling in the bathroom located at apt 4b, 4th story, apartment at north
Mar 18, 2015 · Apt 4B
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches. in the entire apartment located at apt 2g, 1st apartment from east at south
Nov 1, 2006 · Apt 2G
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice at 2nd story. in the entire apartment located at apt 2g, 1st apartment from east at south
Nov 1, 2006 · Apt 2G
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl tiles throught at 2nd story. in the entire apartment located at apt 2g, 1st apartment from east at south
Nov 1, 2006 · Apt 2G
Closed — Violation closed - BHazardous
Properly repair the broken or defective door lock at 2nd story in the entrance located at apt 2g, 1st apartment from east at south
Nov 1, 2006 · Apt 2G
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical wall outlets throughout in the entire apartment located at apt 2g, 2nd story, 1st apartment from east at south
Nov 1, 2006 · Apt 2G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls throughout in the entire apartment located at apt 2g, 2nd story, 1st apartment from east at south
Nov 1, 2006 · Apt 2G
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice droppings kitchen 8 sty northwest apt 8j. , section '' ''
Nov 14, 1990 · Apt 8J
Closed — Violation closed
DOB building violations
37 DOB violations, newest first.
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2020
Jun 20, 2021
Dob violation - dismissed - Facade safety program facade required
Nycha unsafe cycle 8 report filed
Feb 20, 2020
Dob violation - dismissed - Construction other optional
Boro commissioner has ordered work stopped for job # 440343013 due to intent to revoke application
Feb 19, 2020
Dob violation - active - Construction other optional
Boro commissioner has ordered work stopped for job # 440343004 due to intent to revoke application
Feb 19, 2020
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Feb 6, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Sep 26, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 4, 2009
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatoroptional
2
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
2
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
2
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
2
Apr 7, 1992
Dob violation - dismissed - Elevator elevatorrequired
(16)3rd & 7th floor.(17)7th & 12th floor
Jun 5, 1990
Dob violation - resolved - Elevator elevatorrequired
(74)restore car to service for the purpose of inspection
Jun 5, 1990
Dob violation - resolved - Elevator elevatorrequired
(16)8th floor
Jan 25, 1990
Dob violation - resolved - Elevator elevatorrequired
(74)make all necessary repairs to prevent seperations of rollers from clutch at 11th floor
Jan 25, 1990
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 23, 1990
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 23, 1990
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 23, 1990
Dob violation - resolved - Elevator elevatoroptional
2
Oct 12, 1989
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed - Elevator elevatoroptional
2
Oct 12, 1989
Dob violation - dismissed
ECB violations
19 ECB violations, newest first.
- Class - 1
Failure to notify the dept of an accident/incident that resulted in a fatality or an incident. a flag person got caught between the skid steer(bobcat) and the chain link fence. the flag person was transported t
Sep 15, 2020
Resolve - Class - 1
Failure to promptly notify the dept of an accident at construction site.at time of inspection it was observed that worker alexis colon was injured when caught between a skid steer and a wrought iron (fence)whil
Aug 28, 2020 · Penalty $5,000
Resolve - Class - 2
Failure to maintain safe operations.at time of inspection it was observed that worker alexis colon was injured.the workers was flagging spotting a mini front load/skid steer being used to move debris.the worker
Aug 28, 2020 · Penalty $5,000
Resolve - Class - 1
I observed on the first floor area of building 433, a new lock wing valve and several feet of gas piping with a cap installed on the b gas riser line. without a permit. gas company was notified. , obtain permit
Nov 6, 2019 · Penalty $2,500
Resolve - Class - 2
Removal of shed or protective measure w/o dept approval. as noted: on 2/21/18 amended swarmp report had not been approved at 40-20 beach channel drive. their was no safety measures around property. rmdy:comply
Feb 21, 2018
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments.note: sidewalk shed has been erected all around the building under permit #421007065-01-eq-sh some parts of sws not shown on
Jan 30, 2015 · Penalty $250
Resolve - Class - 2
Sign. note: sidewalk shed has been erected all around the building under permit #421007065-01-eq-sh sidewalk shed information panel not provided that does not meet code specifications. rmdy: comply w/code.
Jan 30, 2015 · Penalty $400
Resolve - Class - 2
Failure to file an acceptable 6round technical report in compliance w/ code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & dob rules & regulations.36012582l.fil
Sep 20, 2010
Resolve - Class - 2
Fail to file an acceptable 6th round technical report in compliance w/code provisions:periodic inspections of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.rem:file
Feb 17, 2010
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & dob rules & regulations.remedy:
Apr 24, 2009
Resolve - Class - 2
20i10 20i10 repair damaged car vision panel
Mar 2, 2009
Resolve - Class - 2
8v1.58h10.8v1 adjust leveling 58h10 repair worn beaings
Mar 2, 2009
Resolve - Non-hazardous
59q03,38x10,51m07,17h11,20i11,33o02. 38-x lite 51-m anti spin device 20-i car door 33-0 beams.
Oct 25, 2007
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance w/ code provisions: periodic insp of exterior walls & appurtenances as requiredby ll 11/98 & the dob rules & regulations. the 5th round technical
Aug 25, 2006
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions:periodic inspection of exterior walls & appurtenances asrequired by local law 11 of 1998 & the dob rules & regulations.
Jun 2, 2006
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenancesas required by local law 11 of 1998 & the dept of bldgs rules & regul-
Oct 21, 2005
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance with code provisions:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the department of buildings rules &
Feb 25, 2005
Resolve - Non-hazardous
Failure to submit a fifth round technical report : periodic inspectionof exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy : file
Aug 6, 2004
Resolve - Hazardous
Failure to maintain exterior of building. facade issues- i north and west elevation; deteriorating in mortar joints; bulging in shelf angles; open mortar joints and cracks in facade. remedy: make area safe, ere
May 13, 2003
Resolve