67-03 Beach Channel Drive
Queens, NY 11692BBL 4-15915-0054Map
Owner of record: Jessica Thomas-Howard
67-03 Beach Channel Drive is a walk-up apartment building built in 1905 in Queens, 11692. It has 3 residential units across 2.5 floors. The owner of record is Jessica Thomas-Howard. HPD has recorded 361 housing violations here, most recently on June 25, 2026. 45 of the 50 most recent violations are still open.
- HPD violations
- 361
- DOB violations
- 1
- ECB violations
- 0
- HPD complaints
- 577
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 361
- BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Jun 25, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north at east located at apt 1b, 1st story, 1st apartment from west at north
Jun 25, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at west located at apt 1b, 1st story, 1st apartment from west at north
Jun 25, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly secure the loose handrail at west at stairs leading to apartment 1b at building rear , 1st story
Jun 25, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective 3rd, 4th and 5th concrete treads from bottom leading to apartment 1b at building rear , 1st story
Jun 25, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood window frame in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Jun 25, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at building front at north yard, 1st story
Apr 26, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective 1st, 2nd, 3rd, 4th and 5th concrete tread leading to apartment 1b at building rear at south yard, 1st story
Apr 26, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective metal handrail at stairs leading to apartment 1b at building rear at south yard, 1st story
Apr 26, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood window frame in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Apr 26, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Apr 26, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Replace with new the missing escucheon at base and ceiling of steam riser in the bathroom located at apt 1b, 1st story, 1st apartment from west at north
Apr 26, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from north at west located at apt 1b, 1st story, 1st apartment from west at north
Apr 26, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood flooring and vinyl floor tiles in the 2nd room from north located at apt 1b, 1st story, 1st apartment from west at north
Apr 26, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 2nd room from north located at apt 1b, 1st story, 1st apartment from west at north
Apr 26, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Mar 17, 2026 · Apt 1B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Mar 17, 2026 · Apt 1B
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Mar 17, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Mar 17, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance upper window sash in the 3rd room from north located at apt 1b, 1st story, 1st apartment from west at north
Mar 17, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl tile flooring in the 1st room from north at east located at apt 1b, 1st story, 1st apartment from west at north
Mar 17, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures , in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Feb 11, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system .door is locked at basement at boiler room
Feb 11, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Feb 11, 2026 · Apt 3
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures , in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Feb 11, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures , in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Feb 11, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north , section ''rear''
Dec 15, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Oct 9, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective window frame in the 2nd room from north located at apt 3, 3rd story, 1st apartment from north at east
Oct 9, 2025 · Apt 3
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in bathtub wasteline in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Oct 9, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Oct 9, 2025 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Oct 9, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Oct 9, 2025 · Apt 3
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north at west located at apt 1b, 1st story, 1st apartment from west at north , section ''rear''
Sep 22, 2025 · Apt 1B
Open — Not complied with - ANon-hazardous
Properly repair with similar material the broken or defective laminate wood flooring in the 2nd room from north at east located at apt 1b, 1st story, 1st apartment from west at north , section ''rear''
Sep 22, 2025 · Apt 1B
Open — Not complied with - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard yard
Sep 22, 2025
Open — Not complied with - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north at west located at apt 1b, 1st story, 1st apartment from west at north , section ''rear''
Sep 22, 2025 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Aug 6, 2025 · Apt 1B
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tile floor in the 2nd room from east located at apt 1b, 1st story, 1st apartment from west at north
Jul 29, 2025 · Apt 1B
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Jul 29, 2025 · Apt 1B
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling. in the 2nd room from east located at apt 1b, 1st story, 1st apartment from west at north
Jul 29, 2025 · Apt 1B
Open — Not complied with - BHazardous
Refit lower window sashes at west wall in the 2nd room from east located at apt 1b, 1st story, 1st apartment from west at north
Jul 29, 2025 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood window frame at west wall in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Jul 29, 2025 · Apt 1B
Open — Not complied with - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Jul 29, 2025
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — First no access to re- inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2024
Open — First no access to re- inspect violation - CImmediately hazardous
M/d law abate the nuisance consisting of free standing used reftigerator with doors intact. at stoop, 1st story
Jan 17, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items. at stoop, 1st story
Jan 17, 2024
Closed — Violation closed
DOB building violations · 1
- Construction other optional
Failure to maintain building. load bearing wood frame wall at exp 2 of 67-07 beach channel drive has partially collapsed. the front of exp. 2 wall is approx. 1ft out of plumb. due to the unsafe conditions and possible further collapse at 67-07 beach channel drive, the right side yard of 67-03 will be vacated.
Mar 19, 2024
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Flooring/stairs
Stairs
Aug 3, 2026 · Apt 1B
Close - Door/window
Door
Aug 3, 2026 · Apt 1B
Close - Flooring/stairs
Stairs
Aug 3, 2026 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Aug 3, 2026 · Apt 1B
Close - Paint/plaster
Wall
Aug 3, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Aug 3, 2026 · Apt 1B
Close - Paint/plaster
Cabinet
Aug 3, 2026 · Apt 1B
Close - Flooring/stairs
Floor
Aug 3, 2026 · Apt 1B
Close - Plumbing
Toilet
Aug 3, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Aug 3, 2026 · Apt 1B
Close
Show 40 more ↓
- Unsanitary condition
Pests
Aug 3, 2026 · Apt 1B
Close - Door/window
Window frame
Aug 3, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Aug 3, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Jun 2, 2026 · Apt 1B
Close - Door/window
Window frame
Jun 2, 2026 · Apt 1B
Close - Flooring/stairs
Stairs
Jun 2, 2026 · Apt 1B
Close - Flooring/stairs
Stairs
Jun 2, 2026 · Apt 1B
Close - Paint/plaster
Wall
Jun 2, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Jun 2, 2026 · Apt 1B
Close - Electric
Power outage
Jun 2, 2026 · Apt 1B
Close - Flooring/stairs
Floor
Jun 2, 2026 · Apt 1B
Close - Plumbing
Toilet
Jun 2, 2026 · Apt 1B
Close - Flooring/stairs
Floor
Apr 22, 2026 · Apt 1B
Close - Electric
No lighting
Apr 22, 2026 · Apt 1B
Close - Flooring/stairs
Stairs
Apr 22, 2026 · Apt 1B
Close - Flooring/stairs
Stairs
Apr 22, 2026 · Apt 1B
Close - General
Cabinet
Apr 22, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Apr 22, 2026 · Apt 1B
Close - Water leak
Heavy flow
Apr 22, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Apr 21, 2026 · Apt 1B
Close - Plumbing
Toilet
Mar 16, 2026 · Apt 1B
Close - Flooring/stairs
Floor
Mar 16, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Mar 16, 2026 · Apt 1B
Close - General
Cabinet
Mar 16, 2026 · Apt 1B
Close - Door/window
Window frame
Mar 16, 2026 · Apt 1B
Close - Plumbing
Basin/sink
Mar 16, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Mar 16, 2026 · Apt 1B
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt 3
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 3
Close - Plumbing
Water supply
Feb 9, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 3
Close - Plumbing
Water supply
Feb 8, 2026 · Apt 3
Close - Electric
No lighting
Dec 11, 2025 · Apt 1B
Close - Flooring/stairs
Floor
Dec 11, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 11, 2025 · Apt 1B
Close - Heat/hot water
Entire building
Oct 10, 2025 · Apt 3
Close - Door/window
Window frame
Sep 24, 2025 · Apt 3
Close - Plumbing
Bathtub/shower
Sep 24, 2025 · Apt 3
Close - Appliance
Electric/gas range
Sep 24, 2025 · Apt 3
Close - Unsanitary condition
Pests
Sep 24, 2025 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1905
- Floors
- 2.5
- Residential units
- 3
- Building area
- 2,593 ft²
- Lot area
- 4,000 ft²
- Zoning
- R5D
- Community board
- 414
- Council district
- 31
- Block / lot
- 15915 / 54
- Assessed value
- $56,400
- Landmark / historic district
- No
HPD registration #402548, last renewed Jul 7, 2025.
Questions about 67-03 Beach Channel Drive
Who owns 67-03 Beach Channel Drive?
The owner of record in NYC Department of City Planning PLUTO data is Jessica Thomas-Howard.
Does 67-03 Beach Channel Drive have violations?
Yes. NYC HPD has recorded 361 housing violations at this property.
Is 67-03 Beach Channel Drive rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 67-03 Beach Channel Drive built?
City records list 1905 as the year it was built.
How many apartments are in 67-03 Beach Channel Drive?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.