3-10 Beach 68 Street
Queens, NY 11692BBL 4-15915-0027Map
Owner of record: Marks, Michael
3-10 Beach 68 Street is a two-family home built in 1950 in Queens, 11692. It has 2 residential units across 2 floors. The owner of record is Marks, Michael. HPD has recorded 33 housing violations here, most recently on October 22, 2006. 33 of the 33 most recent violations are still open.
- HPD violations
- 33
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 10
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 33
- BHazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 2, 2nd story
Oct 22, 2006 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story
Oct 22, 2006 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches and mice throughout - 1 sty. apt. d-32300-h.
May 19, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective - lock and latch assembly - door - vestibule to 1 sty. public hall.
May 19, 2002
Open — Nov sent out - ANon-hazardous
Replace with new the missing - saddle - 2 sty. apt. south east room - entrance to deck.
May 19, 2002
Open — Nov sent out - ANon-hazardous
Refit door's - 2 sty. apt. throughout.
May 19, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective - cabinets - bottom - 2 sty. apt. sink - kitchen.
May 19, 2002
Open — Nov sent out - BHazardous
Replace with new the missing - door - 2 sty. apt. - north east room.
May 19, 2002
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures wash basin - 2 sty. apt. bathroom.
May 19, 2002
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets bathtub - 2 sty. apt. bathroom.
May 19, 2002
Open — Nov sent out
Show 23 more ↓
- CImmediately hazardous
Provide electric - 2 sty. apt. throughout.
May 19, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective - electric ceiling light fixture 1 sty. apt. rear south rm. d33306h.
May 19, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective - electrical fixture - kitchen ceiling - 1sty. apt. 1.
May 19, 2002
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the boiler room - 1 sty. public hall rear.
May 19, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective paving front entrance walk to building - front yard.
May 19, 2002
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front, rear and south yards.
May 19, 2002
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures wash basin - 2 sty. apt. bathroom.
May 19, 2002
Open — Nov sent out - ANon-hazardous
Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
May 7, 2002
Open — Nov sent out - ANon-hazardous
Replace with new the missing door entrance to bldg. vestibule.
May 7, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective mortis locks' 2 sty. apt.-entrance door and door to rear deck.
May 7, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling throughout in the entire apartment located at apt 2, 2nd story
Apr 17, 2002 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood facing over entrance door to building and roof front 2nd sty at front areaway
Apr 17, 2002
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of house hold items / boxies etc. public hall all stories at public hall
Apr 17, 2002
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the apt throughout in the entire apartment located at apt 2, 2nd story
Apr 17, 2002 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate lighting for public hall all stories 60watts required at public hall
Apr 17, 2002
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 332nd story
Apr 17, 2002 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile walls in the bathroom located at apt 2, 2nd story
Apr 17, 2002 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective kitchen sink cabinets in the kitchen located at apt 2, 2nd story
Apr 17, 2002 · Apt 2
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in kitchen sink in the kitchen located at apt 2, 2nd story
Apr 17, 2002 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective unhinge door in the bathroom located at apt 2, 2nd story
Apr 17, 2002 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2, 2nd story
Apr 17, 2002 · Apt 2
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over entire apt in the entire apartment located at apt 2, 2nd story
Apr 17, 2002 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling of public hall all stories at public hall
Apr 17, 2002
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Mold
Sep 29, 2014 · Apt 1STFL
Close - Heating
Heat related
Jan 31, 2007 · Apt 1FL
Close - Heating
Heat related
Dec 22, 2006 · Apt 1FL
Close - Heating
Heat related
Oct 24, 2006 · Apt 2
Close - Heating
Heat related
Oct 20, 2006 · Apt 1FL
Close - Heating
Heat related
Oct 17, 2006 · Apt 1FL
Close - Heating
Heat related
Dec 2, 2004 · Apt 1FL
Close - Heating
Heat related
Nov 18, 2004 · Apt 1FL
Close - Electric
Electric-supply
Oct 8, 2004 · Apt 2
Close - General
Doors
Jun 16, 2003 · Apt N/A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1950
- Floors
- 2
- Residential units
- 2
- Building area
- 2,156 ft²
- Lot area
- 3,033 ft²
- Zoning
- R5A
- Community board
- 414
- Council district
- 31
- Block / lot
- 15915 / 27
- Assessed value
- $45,000
- Landmark / historic district
- No
Questions about 3-10 Beach 68 Street
Who owns 3-10 Beach 68 Street?
The owner of record in NYC Department of City Planning PLUTO data is Marks, Michael.
Does 3-10 Beach 68 Street have violations?
Yes. NYC HPD has recorded 33 housing violations at this property.
Is 3-10 Beach 68 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3-10 Beach 68 Street built?
City records list 1950 as the year it was built.
How many apartments are in 3-10 Beach 68 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.