Violations at 164-01 Cross Bay Boulevard
Queens, NY 11414 · BBL 4-14207-0128 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
5 DOB violations, newest first.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 31, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 20, 1997
Vpw*-violation unserved ecb-work without permit-dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
May 16, 1991
Vw-violation work without permit - active
ECB violations
18 ECB violations, newest first.
- Class - 2
Failure to maintain building in code compliant manner. at time of my inspection observed approx 1/4" vertical cracks at exterior,exp#3&4. nointernal crack observed:exterior vertical crack through the cmu blocke
Sep 2, 2021 · Penalty $625
Resolve - Class - 1
Electrical work w/o a permit. work noted: at the time of inspection 1pm i observed 3 construction workers, who work for sign-a-rama installing a new illuminated sign to bldg structure at exp1.the installation
Mar 8, 2017
Resolve - Class - 1
28-415.1 unlicensed sign hanger sign hanger license required work noted: at time of inspection i observed 3 construction workers, who all work for sign-a-rama gc#614482 installing a new illuminated sign apprx
Mar 8, 2017 · Penalty $400
Resolve - Class - 2
Outdoor sign on display structure w/o a permit. work noted: at the time of inspection 1pm i observed 3 construction workers,working for gc#614482 sign-a-rama installing a new illuminated sign apprx 19'x40"
Mar 8, 2017 · Penalty $600
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. non-compliance noted: no certificate of correction on file with the dept for ecb nov#345105
Jul 8, 2010 · Penalty $800
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. non-compliance noted: no certificate of correction on file with the department for ecb nov#
Jul 8, 2010 · Penalty $800
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. non-compliance noted: no certificate of correction on file with the dept for ecb nov#345286
Jul 8, 2010 · Penalty $800
Active - Class - 2
Failure to maintain building's wall. defect noted: at right of premises (building's south wall), 1. vertical crack at rear cmu wall apprx 1/4" w x 15' long. remedy: maintain building repair crack.
Jul 8, 2010 · Penalty $250
Resolve - Non-hazardous
Failure to comply w/ commissioner order to file a cert of correction w/ d.o.b for violation #34510528y. observed steel frame structure approx size 20' x 70' 12ht. no permit was obtained to erect this structure
Sep 15, 2007 · Penalty $500
Active - Non-hazardous
Noted:failure to comply with dept. order to obtain permit for erectingone story metal structure along north side of existing masonry structure as noted in nov#3451028j issued 02/01/06.
Jun 20, 2006 · Penalty $1,500
Active - Non-hazardous
Work w/o a permit. noted: at left side of property erected quanzom structure w/steel frame, curved roof & front, rear roll gates. structure has approx. size: (20'w x 70'l x 12' ht) remedy: obtain permit if feas
Feb 1, 2006 · Penalty $800
Active - Non-hazardous
Failure to provide approved plans at premises at time of inspection. remedy; provide approved plans.
Mar 31, 1998
Resolve - Non-hazardous
Work without a permit. noted duct work for air conditioning installed. a review of building dept. records indicate that no permit was issued. remedy:-obtain necessary permit.
Mar 31, 1998
Resolve - Non-hazardous
Failure to provide contractors sign facing a public throughfare. no sign anywhere on site. remedy: provide contractors sign/
Mar 31, 1998
Resolve - Hazardous
Failure to file tr1 prior to start of controlled work. remedy: file form tr1.
Mar 31, 1998 · Penalty $350
Resolve - Non-hazardous
Plumbing work without a permit. noted 4" cast iron no hub installed under slab and extending up 4'-0" and connected to city sewer. a review of building dept. records indicate that no plumbing permit was issued
Mar 31, 1998
Resolve - Hazardous
Failure to protect public and property affected by construction operations, in htat no 8'-0" solid fence provided around on going construction stop all work remedy:-provide safeguards to public.
Mar 31, 1998 · Penalty $400
Resolve - Non-hazardous
Work without permit (noted building demolished prior to approval's andpermit. remedy:obtian a permit if feasible or restore premises to prior legal condition
May 16, 1991 · Penalty $285
Resolve