roofy

Violations at 154-06 Broad Street

Queens, NY 11422 · BBL 4-13910-0020 · Back to the property

HPD housing violations

23 HPD violations, newest first.

  • CImmediately hazardous

    Cleanse and disinfect to the satisfaction of this department after removing the stagnet water under the stairs leading to 2nd stry at public hall, 1st story

    Mar 16, 2023

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair with similar material the broken or defective sloping and loose balustrade of stairs that lead to the 2nd stry at public hall, 1st story

    Mar 16, 2023

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair with similar material the broken or defective 4 rotten and deteriorating wood floor beems that support the stairs leading to 2nd stry at public hall, 1st story

    Mar 16, 2023

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2fl, 2nd story

    Mar 16, 2023 · Apt 2FL

    Open — Nov sent out
  • CImmediately hazardous

    Abate the nuisance consisting of scalding hot water excceding the maximum tempeture of 130 degrees at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story

    Mar 16, 2023 · Apt 2FL

    Closed — Violation closed
  • IInformation / order

    The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for apt # 1, 1st story ( vacate # 220225 )

    Jan 3, 2023

    Open — Not complied with
  • CImmediately hazardous

    Abate the nuisance consisting of storm damage throgh out entire illegal clas a apt at in the entire apartment located at apt 1, 1st story

    Dec 28, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). (replace) in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    May 12, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective (wood) floor unsecurely installed at 1st boiler room from east at south, 1st story

    Apr 5, 2022

    Open — Nov sent out
  • BHazardous

    Replace with new the broken or defective ceramic floor tiles in the kitchen located at apt 1floor, 1st story, 1st apartment from east at south

    Mar 5, 2022 · Apt 1FLOOR

    Open — Nov sent out
  • CImmediately hazardous

    Abate the nuisance consisting of broken wood combustible floor in the boiler room located at apt 1stflo, 1st story, 1st apartment from south at west

    Dec 8, 2021 · Apt 1STFLO

    Closed — Violation closed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of scalding hot water of 155 degrees exceeding maximum allowable temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west

    Dec 8, 2021 · Apt 1STFLO

    Closed — Violation closed
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west

    Dec 8, 2021 · Apt 1STFLO

    Open — Nov sent out
  • CImmediately hazardous

    Abate the nuisance consisting of scalding hot water located at apt entire, 2nd story, 1st apartment from north at east

    Feb 20, 2019 · Apt ENTIRE

    Closed — Violation closed
  • BHazardous

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt entire, 2nd story, 1st apartment from north at east

    Feb 20, 2019 · Apt ENTIRE

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt entire, 2nd story, 1st apartment from north at east

    Feb 20, 2019 · Apt ENTIRE

    Open — Nov sent out
  • BHazardous

    § 9, 56, 193, 300, 302 m.d. law- above frame building has been converted from a private dwelling to a multiple dwelling and is now occupied and maintained as such contrary to law.restore premises to lawful occupancy

    Aug 29, 2018

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of illegally converted apt. with plumbing and cooking facilities, at 1st story rear at south

    Aug 29, 2018

    Open — Nov sent out
  • BHazardous

    Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible the gas range in kitchen at 1st story rear, 1st apartment at south

    Aug 29, 2018

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective ceiling light in the kitchen located at apt 1, 1st story, 1st apartment from east at south

    Jul 11, 2018 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Refit the door at the building front entrance .

    Jul 5, 2018

    Open — Nov sent out
  • BHazardous

    Properly repair and abate unsafe electric wiring condition consisting of exposed bx cables at ceiling at public hall, 1st story

    Jul 5, 2018

    Open — Nov sent out
  • BHazardous

    Properly repair and abate unsafe electric wiring condition consisting of exposed elecctric extension cords over ceiling at public hall, 1st story

    Jul 5, 2018

    Open — Nov sent out

DOB building violations

3 DOB violations, newest first.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 25, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 5, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 5, 2018

    Dob violation - dismissed

ECB violations

10 ECB violations, newest first.

  • Class - 1

    Failure to comply w/ the commissioner's order contained in summons/vio#35454360h issued on 8/31/2020 and to file a certificate of correctionpursuant to 28-201.1 and 1rcny 102-01. work w/o permit. remedy:comply

    Apr 2, 2021

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons.violation #35454360h issued on 08-31-20 and to fil ea certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work w/o permit at time

    Dec 10, 2020

    Resolve
  • Class - 1

    Work w/o a permit. at time of inspection premises w/ 4 buildings on lot,observed newly erected cmu block wall at exposures 1,3 approx 7' in height. premises has a job filing for alt2#440508489 to legalize cmu b

    Aug 31, 2020

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation #35334786z issued on 06/04/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit.de

    Dec 14, 2018

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation #35341160m issued on 08/01.18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.comply with commissioner

    Nov 1, 2018

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by the certificate of occupancy or building department records.1st story use changed from storage and ordinary use to an apartment partitions erected with kitchen and bathroom

    Aug 29, 2018

    Resolve
  • Class - 1

    Work w/o a permit. failure to comply w/the comm's order contained in summons/vio#35334786z issued on 06/04/18 & to file a c of c pursuant to28-201.1 & 1rcny 102-01. note: demolished 1 bldg out of 4 bldgs on the

    Aug 1, 2018

    Resolve
  • Class - 2

    Unlawfully continued work while on notice of stop work order. failure to comply w/the comm's order contained in summons/vio#35334793r issued on 6-7-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01.

    Aug 1, 2018

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of a stop work order. noted:roll down shutter installed while swo is in effect. swo issued on 6/4/18 summons 35334786z issued on 6/4/18. no permits on file.roll down

    Jun 7, 2018

    Resolve
  • Class - 1

    Work without a permit. noted: demolished one building out of 4 buildings on the property.now shows 3 biuldings.dob records shows a building on lot observed exterior wall plywood and framing replacement.new ceme

    Jun 4, 2018

    Resolve