Violations at 147-09 235 Street
Queens, NY 11422 · BBL 4-13728-0013 · Back to the property
HPD housing violations
16 HPD violations, newest first.
- BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling and wall in the 1st room from east located at apt 2ndflo, 2nd story, 1st apartment from north at east
May 12, 2025 · Apt 2NDFLO
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak ceiling rear room extension on the first floor located at apt hse, 1st story
Oct 5, 2018 · Apt HSE
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling rear room extension on the first floor located at apt hse, 1st story
Oct 5, 2018 · Apt HSE
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor rear room extension on the first floor located at apt hse, 1st story
Oct 5, 2018 · Apt HSE
Open — Nov sent out - BHazardous
Properly secure the loose ceiling light fixture rear room extension on the first floor located at apt hse, 1st story
Oct 5, 2018 · Apt HSE
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective door frame rear room extension on the first floor located at apt hse, 1st story
Oct 5, 2018 · Apt HSE
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceiling front living-room on the first floor located at apt hse, 1st story
Oct 5, 2018 · Apt HSE
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling front living-room on the first floor. located at apt hse, 1st story
Oct 5, 2018 · Apt HSE
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt hse, 1st story
Oct 5, 2018 · Apt HSE
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Sep 20, 2018
Open — Info nov sent out - BHazardous
Remove the illegal fastening double key cylinder lock installed at gates building front
Sep 16, 2018
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door frame leading to rear yard in the 1st room from east located at apt 1stfl, 1st story
Sep 16, 2018 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 1stfl, 1st story
Sep 16, 2018 · Apt 1STFL
Open — Nov sent out - BHazardous
Properly secure the loose ceiling light fixture in the 1st room from east located at apt 1stfl, 1st story
Sep 16, 2018 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt 1stfl, 1st story
Sep 16, 2018 · Apt 1STFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiing in the 1st room from east located at apt 1stfl, 1st story
Sep 16, 2018 · Apt 1STFL
Open — Nov sent out
DOB building violations
No DOB violations on record
ECB violations
2 ECB violations, newest first.
- Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35370358k issued on 10/30/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).an acceptible cert
Sep 10, 2019 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner. noted: roof gutter and siding on the right side extension of the house ripped off. rear side extension is completely covered with brown color tarp to prote
Oct 30, 2018 · Penalty $625
Resolve