200-10 Linden Boulevard
Queens, NY 11412BBL 4-12625-0005Map
Owner of record: Ettienne, Andrea F
200-10 Linden Boulevard is a mixed residential and retail building built in 1925 in Queens, 11412. It has 2 residential units across 2 floors. The owner of record is Ettienne, Andrea F. HPD has recorded 23 housing violations here, most recently on February 7, 2025. 19 of the 23 most recent violations are still open.
- HPD violations
- 23
- DOB violations
- 35
- ECB violations
- 4
- HPD complaints
- 11
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 23
- BHazardous
Properly repair with similar material the broken or defective wood door in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Feb 7, 2025 · Apt 2F
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Feb 7, 2025 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective handle assembly in the entrance located at apt 2f, 2nd story, 1st apartment from north at east
Feb 7, 2025 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wooden tread, 1st, 4th,6th,8th and 11th stair, from top down at public hall stairs, 1st story
Feb 7, 2025
Closed — Violation closed - ANon-hazardous
Refit door in the 1st room from north at west located at apt 2f, 2nd story, 1st apartment from north at east
Feb 7, 2025 · Apt 2F
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wooden door casing in the 1st room from north at west located at apt 2f, 2nd story, 1st apartment from north at east
Feb 7, 2025 · Apt 2F
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 30, 2025
Open — Info nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from east at south
Jan 29, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from east at south
Jan 29, 2025 · Apt 2R
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling less than 10 sq ft in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from east at south
Jan 29, 2025 · Apt 2R
Closed — Violation closed
Show 13 more ↓
- BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jan 29, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jan 29, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the foyer located at apt 2r, 2nd story, 1st apartment from east at south
Jan 29, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and all walls in the foyer located at apt 2r, 2nd story, 1st apartment from east at south
Jan 29, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jan 29, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and all walls in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Jan 29, 2025 · Apt 2R
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling less than 10 sq ft in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Jan 29, 2025 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jan 29, 2025 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door , in the entrance located at apt 2r, 2nd story, 1st apartment from east at south
Jan 29, 2025 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key o perated lock on building entrance door , 1st story
Jan 29, 2025
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling less than 10 sq ft in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from east at south original violation 17659354 issued 29-jan-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 29, 2025 · Apt 2R
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling less than 10 sq ft in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south original violation 17659361 issued 29-jan-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 29, 2025 · Apt 2R
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 2r, 2nd story
Jan 13, 2010 · Apt 2R
Open — Nov sent out
DOB building violations · 35
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed
Show 25 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed - Boiler boiler optional
20b
Oct 15, 1990
Vp*-violation unserved ecb- dismissed - Boiler boiler optional
B-boiler boiler optional
Aug 8, 1983
Dob violation - dismissed
ECB violations · 4
- Non-hazardous
19b,50a,b,c,d,e.50a-safety relief valve on boiler not pipe down.50b-no backflow(check valve)on boiler feed line.50c-no isolation valve on expansion tank.50d-leak on riser bushing above boiler.50e-water pipes no
Feb 28, 2007 · Penalty $2,500
Active - Non-hazardous
19b,32a,50a,50b,50c.50a-no backflow(check valve)on boiler feed line.50b-safety relief valve not piped down.50c-no isolation valve on exhaustion tank.
Feb 28, 2007
Resolve - Non-hazardous
Work without a permit: work noted--partition wall erected at rear of commercial property creating 2 business offices. remedy: obtain per-mits if feasible or restore premises to prior legal condition.
Feb 22, 1995
Resolve - Non-hazardous
20b
Oct 15, 1990 · Penalty $170
Active
Complaints
- Heat/hot water
Apartment only
Feb 5, 2025 · Apt 2F
Close - Flooring/stairs
Stairs
Feb 5, 2025 · Apt 2F
Close - Door/window
Door frame
Feb 5, 2025 · Apt 2F
Close - Paint/plaster
Wall
Feb 5, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 1, 2025 · Apt 2R
Close - Heat/hot water
Apartment only
Jan 29, 2025 · Apt 2R
Close - Paint/plaster
Ceiling
Jan 29, 2025 · Apt 2R
Close - Unsanitary condition
Pests
Jan 29, 2025 · Apt 2R
Close - Unsanitary condition
Pests
Jan 29, 2025 · Apt 2R
Close - Water leak
Heavy flow
Jan 29, 2025 · Apt 2R
Close
Show 1 more ↓
- Nonconst
Vermin
Dec 10, 2009 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1925
- Floors
- 2
- Residential units
- 2
- Building area
- 2,600 ft²
- Lot area
- 1,680 ft²
- Zoning
- R5B
- Community board
- 412
- Council district
- 27
- Block / lot
- 12625 / 5
- Assessed value
- $62,160
- Landmark / historic district
- No
Questions about 200-10 Linden Boulevard
Who owns 200-10 Linden Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Ettienne, Andrea F.
Does 200-10 Linden Boulevard have violations?
Yes. NYC HPD has recorded 23 housing violations at this property.
Is 200-10 Linden Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 200-10 Linden Boulevard built?
City records list 1925 as the year it was built.
How many apartments are in 200-10 Linden Boulevard?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.