118-25 199 Street
Queens, NY 11412BBL 4-12624-0055Map
Owner of record: Hemans, Winifred
118-25 199 Street is a two-family home built in 1925 in Queens, 11412. It has 2 residential units across 2.5 floors. The owner of record is Hemans, Winifred. HPD has recorded 38 housing violations here, most recently on April 18, 2025. 38 of the 38 most recent violations are still open.
- HPD violations
- 38
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 22
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 38
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Apr 18, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and west wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from north at east
Apr 18, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl tiles floor in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Apr 18, 2025 · Apt 2
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at sink waste line in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Apr 18, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective shower head at shower stall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Apr 18, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Apr 18, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Apr 18, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock istalled at building entrance storm metal door at public hall, 1st story
Apr 18, 2025
Open — Nov sent out - IInformation / order
Apartments have been issued a commissioner's order and occupants are in need of relocation services. apartments cannot be re-occupied unitl the commissioner's order is revoked after hpd inspection of apartments. commissioner's order# 16/0039 in the entire apartment located at apt 1, 1st story
May 6, 2016 · Apt 1
Open — Info nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak north wall in the 7th room from east located at apt 1fl, 1st story, apartment at east
Dec 28, 2012 · Apt 1FL
Open — Nov sent out
Show 28 more ↓
- BHazardous
Replace with new the broken or defective ceramic floor tiles in the private hallway located at apt 1fl, 1st story, apartment at east
Dec 28, 2012 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening key operated double cylinder locking mechanism security gate in the entrance located at apt 1fl, 1st story, apartment at east
Dec 28, 2012 · Apt 1FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1fl, 1st story, apartment at east
Dec 28, 2012 · Apt 1FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story, apartment at east
Dec 28, 2012 · Apt 1FL
Open — Nov sent out - BHazardous
Properly secure the loose ceiling light fixture in the bathroom located at apt 1fl, 1st story, apartment at east
Dec 28, 2012 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the bathroom located at apt 1fl, 1st story, apartment at east
Dec 28, 2012 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 1fl, 1st story, apartment at east
Dec 28, 2012 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 1fl, 1st story
May 9, 2012 · Apt 1FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak ceiling in the bathroom located at apt 1fl, 1st story
May 9, 2012 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective connection sink waste line in the bathroom located at apt 1fl, 1st story
May 9, 2012 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet north wall in the kitchen located at apt 1fl, 1st story
May 9, 2012 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective storm windows do not open in dining room and bathroom 1st story apartment # 1.
Jun 26, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mildew walls and ceiling in bathroom 1st story apartment # 1.
Jun 26, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of rust at bathtub drain in bathroom 1st story apartment # 1.
Jun 26, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective window lower sash in 2 room from front 1st story apartment # 1.
Jun 26, 2002
Open — Nov sent out - BHazardous
Replace with new the broken or defective window glass lower sash in 2 room from front 1st story apartment # 1.
Jun 26, 2002
Open — Nov sent out - BHazardous
Replace with new the broken or defective window glass lower sash in dining room 1st story apartment # 1.
Jun 26, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color wall under kitchen sink 1st story apartment # 1.
Jun 26, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective electric stove in kitchen 1st story apartment # 1.
Jun 26, 2002
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in kitchen 1st story apartment # 1.
Jun 26, 2002
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the waste line at wash basin in the bathroom located at apt 1, 1st story
Mar 10, 2002 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color hole at west wall in the kitchen located at apt 1, 1st story
Mar 10, 2002 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cabinet under the kitchen sink in the kitchen located at apt 1, 1st story
Mar 10, 2002 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective window at west wall in the 2nd bedroom from north at west located at apt 1, 1st story
Mar 10, 2002 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective window at east wall in the kitchen located at apt 1, 1st story
Mar 10, 2002 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective east window at south wall in the living room from north at west located at apt 1, 1st story
Mar 10, 2002 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1, 1st story
Mar 10, 2002 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1, 1st story
Mar 10, 2002 · Apt 1
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Electric
Power outage
Jul 7, 2026 · Apt 2FL
Close - Paint/plaster
Ceiling
Apr 9, 2025 · Apt 2
Close - Paint/plaster
Ceiling
Apr 9, 2025 · Apt 2
Close - Paint/plaster
Ceiling
Apr 9, 2025 · Apt 2
Close - Flooring/stairs
Floor
Apr 9, 2025 · Apt 2
Close - Plumbing
Basin/sink
Apr 9, 2025 · Apt 2
Close - Plumbing
Bathtub/shower
Apr 9, 2025 · Apt 2
Close - Water leak
Damp spot
Jan 14, 2025 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Jan 14, 2025 · Apt 2NDFLO
Close - Electric
No lighting
Jan 14, 2025 · Apt 2NDFLO
Close
Show 12 more ↓
- Flooring/stairs
Floor
Jan 14, 2025 · Apt 2NDFLO
Close - Heating
Heat related
Nov 18, 2012 · Apt 1ST
Close - General
Cooking gas
Nov 13, 2012 · Apt 1FL
Close - Plumbing
Water-leaks
Nov 13, 2012 · Apt 1FL
Close - Heating
Heat related
Nov 13, 2012 · Apt 1FL
Close - Plumbing
Water-leaks
Aug 22, 2012 · Apt 1FL
Close - Paint/plaster
Ceiling
Aug 22, 2012 · Apt 1FL
Close - Paint/plaster
Ceiling
Aug 22, 2012 · Apt 1FL
Close - Plumbing
Basin/sink
May 7, 2012 · Apt 1FL
Close - Plumbing
Water-leaks
May 7, 2012 · Apt 1FL
Close - Paint/plaster
Ceiling
May 7, 2012 · Apt 1FL
Close - Appliance
Electric/gas range
May 7, 2012 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1925
- Floors
- 2.5
- Residential units
- 2
- Building area
- 1,760 ft²
- Lot area
- 2,858 ft²
- Zoning
- R4A
- Community board
- 412
- Council district
- 27
- Block / lot
- 12624 / 55
- Assessed value
- $51,720
- Landmark / historic district
- No
Questions about 118-25 199 Street
Who owns 118-25 199 Street?
The owner of record in NYC Department of City Planning PLUTO data is Hemans, Winifred.
Does 118-25 199 Street have violations?
Yes. NYC HPD has recorded 38 housing violations at this property.
Is 118-25 199 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 118-25 199 Street built?
City records list 1925 as the year it was built.
How many apartments are in 118-25 199 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.