roofy

116-51 157 Street

Queens, NY 11434BBL 4-12235-0002Map

Owner of record: Cedar Manor Mut Hous

116-51 157 Street is an elevator apartment building built in 1962 in Queens, 11434. It has 215 residential units across 8 floors. The owner of record is Cedar Manor Mut Hous. HPD has recorded 446 housing violations here, most recently on September 12, 2026. 34 of the 50 most recent violations are still open.

HPD violations
446
DOB violations
167
ECB violations
78
HPD complaints
269

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 12, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. The newest 10 per agency here; the full lists are a click away.

HPD housing violations · 446

  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4f, 4th story, 4th apartment from east at south

    Sep 12, 2026 · Apt 4F

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations ,defective in the entire apartment located at apt 4f, 4th story, 4th apartment from east at south

    Sep 12, 2026 · Apt 4F

    Open — Nov sent out
  • CImmediately hazardous

    Provide ready access to buildings heating system door to boiler room locked at basement

    Sep 12, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4f, 4th story, 4th apartment from east at south

    Sep 12, 2026 · Apt 4F

    Closed — Violation closed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at door to room with slop sink at public hall, 4th story

    Sep 9, 2026

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood entrance door in the 3rd room from east located at apt 6g, 6th story, 1st apartment from west at north

    Jul 26, 2026 · Apt 6G

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective wood entrance door in the 2nd room from east located at apt 6g, 6th story, 1st apartment from west at north

    Jul 26, 2026 · Apt 6G

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6g, 6th story, 1st apartment from west at north

    Jul 26, 2026 · Apt 6G

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the bathroom located at apt 6g, 6th story, 1st apartment from west at north

    Jul 26, 2026 · Apt 6G

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the bathroom located at apt 6g, 6th story, 1st apartment from west at north

    Jul 21, 2026 · Apt 6G

    Open — Nov sent out
See all 446 HPD violations (10 shown here)

DOB building violations · 167

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner: observed at building main entrance. loose/cracking of stucco and flaking of paint at the awning ceiling. roof area: missing coping stone and area left open/unprocted. remedy: repair and/or replace

    Jun 24, 2024

    Dob violation - active
  • Construction other optional

    Atoi, observed vertical cracked bullnose tile at entrance to elevators on right side at lobby entrance. dob violation issued for failure to maintain building.

    Apr 6, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
See all 167 DOB violations (10 shown here)

ECB violations · 78

  • Class - 2

    Found 3 inoperative roof exhaust fans as per code mc 102.3, repair and/or replace; correct all violating conditions and submit a certificate of correction.

    Aug 19, 2026 · Penalty $1,250

    Active
  • Class - 2

    Temporary construction equipment installed- sidewalk shed with expired permit. at time of inspection observed: installed sidewalk shed in place at expo #1, expo#2, expo# 3 and expo#4 with expired permit. permit

    Aug 18, 2026 · Penalty $1,250

    Active
  • Class - 2

    During inspection of a sidewalk shed in place, dob records revealed that the permit expired on january 30, 2026 with no renewal in process. permits must be maintained for the duration that the equipment is in p

    Jun 5, 2026 · Penalty $1,280

    Active
  • Class - 2

    During inspection of a sidewalk shed in place, dob records revealed that the shed permit expired january 30, 2025 with no renewal in process. permits must be maintained for the duration of time that the equipme

    Jun 5, 2026 · Penalty $1,280

    Active
  • Class - 2

    Ecb violation issued for sidewalk shed still erected at site under an expired permit. on 03/19/26, i observed a sidewalk shed erected at the place of occupancy with an expired permit # q00678217-i1-sh. with exp

    Mar 19, 2026 · Penalty $1,280

    Active
  • Class - 2

    Ecb violation issued for sidewalk shed still erected at site under an expired permit. on 03/19/26, i observed a sidewalk shed erected at the place of occupancy with an expired permit # q00678259-i1-sh. with exp

    Mar 19, 2026 · Penalty $1,250

    Active
  • Class - 2

    Expired sidewalk shed permit. note at time of inspection observed sidewalk shed. at multiple locations and at exp #1 when looking for a valid permit posted none was found on dobnow or bis. remedy: renew permit.

    Apr 28, 2025 · Penalty $6,250

    Active
  • Class - 2

    Jobsite fence not constructed/maintained pursuant to subsection at time of inspection observed at exposure #3 north elev a construction fence with a discontinued path where pedestrian/public could access to sub

    Apr 28, 2025 · Penalty $5,000

    Active
  • Class - 2

    Temporary construction fence equipment on site expired permit. at timeof inspection observed no permit valid on bis or dobnow or posted on site. remedy: renew permit.

    Apr 28, 2025 · Penalty $6,250

    Active
  • Class - 2

    Pedestrian protection does not meet code specifications at time of inspection it was observed at exposure 3 north elevation sidewalk shed panel temporarly and improperly attached or supported. also observed det

    Apr 28, 2025 · Penalty $10,000

    Active
See all 78 ECB violations (10 shown here)

Complaints

  • Heat/hot water

    Entire building

    Oct 19, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Sep 15, 2026 · Apt 4F

    Close
  • Plumbing

    Water supply

    Aug 13, 2026 · Apt 4F

    Close
  • Electric

    No lighting

    Aug 9, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Aug 7, 2026 · Apt 4F

    Close
  • Electric

    No lighting

    Aug 3, 2026 · Apt BLDG

    Close
  • Electric

    Lighting

    Jul 23, 2026 · Apt 6G

    Close
  • Paint/plaster

    Wall

    Jul 23, 2026 · Apt 6G

    Close
  • Plumbing

    Steam pipe/riser

    Jul 23, 2026 · Apt 6G

    Close
  • Paint/plaster

    Wall

    Jul 20, 2026 · Apt 6G

    Close
See all 269 HPD complaints (10 shown here)

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D4)
Year built
1962
Floors
8
Residential units
215
Building area
227,376 ft²
Lot area
240,000 ft²
Zoning
R3-2
Community board
412
Council district
28
Block / lot
12235 / 2
Assessed value
$9,207,900
Landmark / historic district
No

HPD registration #420578, last renewed Mar 20, 2026.

Questions about 116-51 157 Street

Who owns 116-51 157 Street?

The owner of record in NYC Department of City Planning PLUTO data is Cedar Manor Mut Hous.

Does 116-51 157 Street have violations?

Yes. NYC HPD has recorded 446 housing violations at this property.

Is 116-51 157 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 116-51 157 Street built?

City records list 1962 as the year it was built.

How many apartments are in 116-51 157 Street?

It has 215 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.