Violations at 118-34 154 Street
Queens, NY 11434 · BBL 4-12208-0052 · Back to the property
HPD housing violations
30 HPD violations, newest first.
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective concrete floor in the terrace located at apt 1, 1st story
Oct 11, 2019 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east at north located at apt 1 lower level, 1st story
Oct 11, 2019 · Apt 1
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 1 upper level, 2nd story
Oct 11, 2019 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass at upprer window sash in the 1st room from east at north located at apt 1 lower level, 1st story
Oct 11, 2019 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective connection drain line at sink in the kitchen located at apt 1, 1st story
Oct 11, 2019 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor in the kitchen located at apt 1 lower level, 1st story
Oct 11, 2019 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing noising 6th from top at stairs located at apt 1, 1st story
Oct 11, 2019 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling front porch located at apt 1fl, 1st story
Aug 17, 2011 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder lock on front exterior metal door to building located at apt 1fl, 1st story
Aug 17, 2011 · Apt 1FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak ceiling in the kitchen located at apt 1fl, 1st story
Aug 17, 2011 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the kitchen located at apt 1fl, 1st story
Aug 17, 2011 · Apt 1FL
Open — Nov sent out - BHazardous
Replace with new the broken or defective window glass lower sash in the kitchen located at apt 1fl, 1st story
Aug 17, 2011 · Apt 1FL
Open — Nov sent out - BHazardous
Replace with new the broken or defective door and saddle at kitchen to rear yard located at apt 1fl, 1st story
Aug 17, 2011 · Apt 1FL
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the washbasin waste line in the bathroom located at apt 1fl, 1st story
Aug 17, 2011 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile wall around bathtub. in the bathroom located at apt 1fl, 1st story
Aug 17, 2011 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling front room 2nd sty.
Aug 12, 2002
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Aug 6, 2002
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete steps rear entrance to building.
Aug 6, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches throughout 1st and 2nd sty.
Aug 6, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wire ceiling kitchen 1st sty.
Aug 6, 2002
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the waste pipe water closet 2nd sty. bathroom.
Aug 6, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling front and center room 1st sty.
Aug 6, 2002
Open — Nov sent out - BHazardous
Replace with new the missing ceiling front room 1st sty.
Aug 6, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective window frame rear room 2nd sty.
Aug 6, 2002
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets bathtub bathroom 2nd sty.
Aug 6, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling 2nd public hall
Aug 6, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture front room 2nd sty.
Aug 6, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling front room 2nd sty.
Aug 6, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of gas fired water heater not rented to chimney cellar
Aug 6, 2002
Open — Nov sent out
DOB building violations
2 DOB violations, newest first.
- Unsafe buildings none
Ub-unsafe buildings none
Nov 25, 1992
Dob violation - active - Unsafe buildings none
Ub-unsafe buildings none
Nov 24, 1992
Dob violation - active
ECB violations
No ECB violations on record