roofy

Violations at 118-41 153 Street

Queens, NY 11434 · BBL 4-12208-0002 · Back to the property

HPD housing violations

13 HPD violations, newest first.

  • ANon-hazardous

    Replace with new the broken or defective undersized lower window sash 2nd sty. front room north window.

    Aug 16, 2002

    Open — Nov sent out
  • ANon-hazardous

    Repair the leaky and/or defective faucets at wash basin and bathtub 2nd sty. bathroom.

    Aug 16, 2002

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of wood tread 1st up from lower platform leading to 2nd sty. ( improperly sized-narrow in width. )

    Aug 16, 2002

    Open — Nov sent out
  • ANon-hazardous

    Properly repair the broken or defective wood floor 2nd sty. front room.

    Aug 7, 2002

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective composite floor tile 2nd sty. front room.

    Aug 7, 2002

    Open — Nov sent out
  • ANon-hazardous

    Repair by closing so as to be gas tight all openings in the waste pipe wash basin 2nd sty. bathroom.

    Aug 7, 2002

    Open — Nov sent out
  • ANon-hazardous

    Abate the nuisance consisting of concealed leak at ceiling 1st sty. entrance foyer.

    Aug 7, 2002

    Open — Nov sent out
  • ANon-hazardous

    Repair by closing so as to be gas tight all openings in the waste pipe sink 1st sty. kitchen

    Aug 7, 2002

    Open — Nov sent out
  • ANon-hazardous

    Repair the broken or defective plastered surfaces and paint in uniform color east wall 1st sty. kitchen

    Aug 7, 2002

    Open — Nov sent out
  • ANon-hazardous

    Replace with new the broken or defective glass storm window center window 1st sty. kitchen

    Aug 7, 2002

    Open — Nov sent out
  • ANon-hazardous

    Replace with new the broken or defective glass upper sash center window 1st sty. kitchen.

    Aug 7, 2002

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective composite floor tile 1st sty. kitchen

    Aug 7, 2002

    Open — Nov sent out
  • ANon-hazardous

    Properly repair the broken or defective celotex ceiling 1st sty. rear room.

    Aug 7, 2002

    Open — Nov sent out

DOB building violations

No DOB violations on record

ECB violations

No ECB violations on record