142-19 Rockaway Boulevard
Queens, NY 11436BBL 4-12036-0092Map
Owner of record: 7701 101 Ave INC.
142-19 Rockaway Boulevard is a mixed residential and retail building built in 1925 in Queens, 11436. It has 1 residential unit across 2 floors. The owner of record is 7701 101 Ave INC.. HPD has recorded 30 housing violations here, most recently on June 14, 2002. 29 of the 30 most recent violations are still open.
- HPD violations
- 30
- DOB violations
- 12
- ECB violations
- 4
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 30
- BHazardous
Remove all obstructions and repair all defects in washbasin in the bathroom located at apt 1, 2nd story
Jun 14, 2002 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective entrance doors all rooms in the entire apartment located at apt 1, 2nd story
Jun 14, 2002 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles walls & floor in the bathroom located at apt 1, 2nd story
May 29, 2002 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood window frame in the 1st room from north located at apt 1, 2nd story
May 29, 2002 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 1, 2nd story
May 29, 2002 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood window frame in the 2nd room from north located at apt 1, 2nd story
May 29, 2002 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 1, 2nd story
May 29, 2002 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 1, 2nd story
May 29, 2002 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective kitchen sink counter top in the kitchen located at apt 1, 2nd story
May 29, 2002 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line under kitchen sink in the kitchen located at apt 1, 2nd story
May 29, 2002 · Apt 1
Open — Nov sent out
Show 20 more ↓
- BHazardous
Properly repair with similar material the broken or defective ceramic tiles floor & west wall in the kitchen located at apt 1, 2nd story
May 29, 2002 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing ceramic tiles at south and north walls in the bathroom located at apt 2fl, 2nd story
Apr 10, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Properly secure the loose electrical light switch at north wall in the 3rd room from north located at apt 2fl, 2nd story
Apr 10, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden floor in the 1st room from north located at apt 2fl, 2nd story
Apr 10, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires at light switches throughout in the entire apartment located at apt 2fl, 2nd story
Apr 10, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden floor in the 3rd room from north located at apt 2fl, 2nd story
Apr 10, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective door in the bathroom located at apt 2fl, 2nd story
Apr 10, 2002 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Properly secure the loose electrical light switch at west wall at public hall, 2nd story
Apr 10, 2002
Open — Nov sent out - BHazardous
Replace with new the missing hand rail at public hall stairs, 2nd story
Apr 10, 2002
Open — Nov sent out - ANon-hazardous
Replace with new the missing electrical cover plates outlets at south, east and west walls in the 4th room from north located at apt 2fl, 2nd story
Apr 10, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden floor in the 4th room from north located at apt 2fl, 2nd story
Apr 10, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the missing light fixture at ceiling in the kitchen located at apt 2fl, 2nd story
Apr 10, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceramic tile counter top at sink in the kitchen located at apt 2fl, 2nd story
Apr 10, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the broken or defective wooden cabinet at sink in the kitchen located at apt 2fl, 2nd story
Apr 10, 2002 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department scrape and paint wooden cabinets at north and south walls in the kitchen located at apt 2fl, 2nd story
Apr 10, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass and sash frame east room located at apt 2fl, 2nd story
Mar 4, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrcal wall outlets in the entire apartment located at apt 2fl, 2nd story
Mar 4, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixtures in the entire apartment located at apt 2fl, 2nd story
Mar 4, 2002 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings in the entire apartment located at apt 2fl, 2nd story
Mar 4, 2002 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floors in the entire apartment located at apt 2fl, 2nd story
Mar 4, 2002 · Apt 2FL
Open — Nov sent out
DOB building violations · 12
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed
Show 2 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 1
Unlawful acts failure to comply with an order of the commissioner.records indiacate no application was filed or certify to correct ecb#35424030h.remedy:comply with commissioner's orders.
Oct 18, 2019 · Penalty $2,500
Resolve - Class - 1
Unapproved/unsafe/unsuitable electrical equipment,apparatus materials,devices,appliances,or wiring in use. in the barber's shop extension cords used as permanent wiring throughout. open junction box in ceiling,
Aug 30, 2019 · Penalty $1,600
Resolve - Class - 1
Work w/o a permit at time of inspection at cellar level observed new installation of shoring shoring installed to support rotted & deteriorated girder & fl joists shoring consist of steel twist jack type column
Nov 14, 2008 · Penalty $1,600
Resolve - Class - 2
Failure to maintain bldg noted: at cellar level of an existing mixed use bldg found wood girder approx. 8" x 12" x 30' w/rear & deteriorated & only partially bearing on foundation wall, sections of fl joists a
Sep 23, 2008 · Penalty $500
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S1)
- Year built
- 1925
- Floors
- 2
- Residential units
- 1
- Building area
- 1,728 ft²
- Lot area
- 987 ft²
- Zoning
- R5D
- Community board
- 412
- Council district
- 28
- Block / lot
- 12036 / 92
- Assessed value
- $49,920
- Landmark / historic district
- No
Questions about 142-19 Rockaway Boulevard
Who owns 142-19 Rockaway Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 7701 101 Ave INC..
Does 142-19 Rockaway Boulevard have violations?
Yes. NYC HPD has recorded 30 housing violations at this property.
Is 142-19 Rockaway Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 142-19 Rockaway Boulevard built?
City records list 1925 as the year it was built.
How many apartments are in 142-19 Rockaway Boulevard?
It has 1 residential units and 2 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.