115-47 148 Street
Queens, NY 11436BBL 4-11993-0034Map
Owner of record: Bayside Capital Corp.
115-47 148 Street is an one-family home built in 1920 in Queens, 11436. It has 1 residential unit across 2.5 floors. The owner of record is Bayside Capital Corp.. HPD has recorded 58 housing violations here, most recently on January 16, 2024. 33 of the 50 most recent violations are still open.
- HPD violations
- 58
- DOB violations
- 2
- ECB violations
- 7
- HPD complaints
- 40
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 58
- BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Jan 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cabinet at the sink in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Jan 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line under the sink in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Jan 16, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly secure the loose upper wall cabinet at the north wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Jan 16, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Jan 16, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approx 30 sqft at the east wall, west closet wall and ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Jan 16, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Nov 30, 2023 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Nov 30, 2023 · Apt 1
Open — Nov sent out - BHazardous
Remove the illegal fastening double cylinder operated key at building front entrance door at public hall, 1st story
Oct 12, 2023
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 4 square feet at north wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south original violation 16305374 issued 12-oct-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 12, 2023 · Apt 1
Open — First no access to re- inspect violation
Show 40 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 12, 2023 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 4 square feet at north wall in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Oct 12, 2023 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... on casing window frame (approx 3 sq ft) at south wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east original violation 16200219 issued 01-sep-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 1, 2023 · Apt 2FLOOR
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 4th room from east located at apt 2floor, 2nd story, 1st apartment from north at east
Sep 1, 2023 · Apt 2FLOOR
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Sep 1, 2023 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall over bathtub in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Sep 1, 2023 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood sill and casing at window frame in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Sep 1, 2023 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... on casing window frame (approx 3 sq ft) at south wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Sep 1, 2023 · Apt 2FLOOR
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2floor, 2nd story, 1st apartment from north at east
Sep 1, 2023 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling and all walls in the entire apartment located at apt 2floor, 2nd story, 1st apartment from north at east
Sep 1, 2023 · Apt 2FLOOR
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible at gas range, , 2nd story
Aug 13, 2023
Open — Nov sent out - BHazardous
Abate the nuisance consisting of discontinue use of rooms for living, disconect plumbing fixtures where illegal and properly seal pipe connections at kitchen sink. , 2nd story
Aug 13, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jul 3, 2023
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective all brick and mortar treads and risers at building front entrance at stoop
Jul 1, 2023
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective lime stone treads at stoop
Jun 30, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , west wall, ceiling, west wall, ceiling in the 2nd room from east located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light at ceiling in the bathroom located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , north wall in the kitchen located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color approx 6 sq ft at the ceiling in the foyer located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color approx 10 sq ft at the ceiling in the 2nd room from east located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , ceiling in the bathroom located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 1st window frame from south at west wall in the kitchen located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the foyer located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 2nd room from east located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Defect letter issued - BHazardous
Properly repair with similar material the broken or defective base sink cabinet in the kitchen located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Nov sent out - BHazardous
Properly secure the loose wall cabinet at south wall in the kitchen located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line under sink in the kitchen located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the foyer located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , ceiling in the bathroom located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approx 30sq ft ceiling in the bathroom located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , ceiling in the 2nd room from east located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from east located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Closed — Violation closed - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt pvt, 1st story, 1st apartment from west at north
Jun 30, 2023 · Apt PVT
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story
Jan 24, 2011 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from east located at apt 1fl, 1st story
Jan 24, 2011 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at entrance metal door at front areaway, 1st story
Jan 24, 2011
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective lower sash glass at window in the kitchen located at apt 1fl, 1st story
Jan 24, 2011 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective lower sash glass at window in the 2nd room from east located at apt 1fl, 1st story
Jan 24, 2011 · Apt 1FL
Open — Nov sent out - BHazardous
§ 27-2005,2007 admon. code: fire egress defective. remove obstructing bars or gates from at least 1 window. .. in the 2nd room from east located at apt 1fl, 1st story
Jan 24, 2011 · Apt 1FL
Open — Nov sent out
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 15, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 20, 2011
Dob violation - active
ECB violations · 7
- Class - 2
Occupancy contrary to that allowed by c of o and/or department of building records. 2nd story illegally converted into class "a" apartment. unlawful gas range and kitchen sink present. also full bathroom presen
Aug 13, 2023 · Penalty $6,250
Active - Class - 2
Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the dept. of bldg for notice of violation # 34904788h issued on 03/24/11 pursuant to 28-204.4 & 1 rcny 102-01 bars on all of
Nov 16, 2011 · Penalty $4,000
Resolve - Class - 1
Failure to maintain bldg in code-complaint manner. improper exit/exit access doorway arrangement. note: 1st fl class'a' apt has bars (fixed)on all windows,& 2 x 4 nailed shut across rear door,premises now w/o
Mar 24, 2011 · Penalty $6,000
Active - Class - 2
Residence altered for occupancy by more than the legally approved # offamilies.note:dob records indicate legal 1-family,(a1-1family)contraryto dob records,residence altered to two family work noted:full height
Mar 24, 2011 · Penalty $10,000
Active - Class - 2
Failure to maintain note:no smoke or co2 detectors in each of (2)class"a"apts (illegally altered) on 1st flr & 2nd flr.rem:provide smoke detectors
Mar 24, 2011 · Penalty $2,500
Active - Class - 2
Residence altered as a dwelling for more than the legally approved # of families. the dept of buildings records indicates premises to be a legal 1 family. the premises is now a illegally 2 family w/1 class'a'
Jan 21, 2011 · Penalty $6,000
Active - Class - 1
Work w/o a permit. work noted: at 1st fl of premises installed water & waste lines for a 3pc bathroom,toilet,wash basin,stall shower & full height partitions for bathroom & vertical door & partitions for 1st fl
Jan 21, 2011 · Penalty $8,000
Active
Complaints
- Heat/hot water
Entire building
Jan 17, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Jan 13, 2024 · Apt 1
Close - Heat/hot water
Entire building
Jan 13, 2024 · Apt 1
Close - Heat/hot water
Entire building
Dec 11, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 27, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Nov 12, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Nov 8, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Oct 9, 2023 · Apt 1
Close - Unsanitary condition
Mold
Aug 28, 2023 · Apt 2FLOOR
Close - Electric
Power outage
Aug 28, 2023 · Apt 2FLOOR
Close
Show 30 more ↓
- Paint/plaster
Ceiling
Aug 28, 2023 · Apt 2FLOOR
Close - Electric
Power outage
Aug 28, 2023 · Apt 2FLOOR
Close - Electric
Power outage
Aug 9, 2023 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Jun 29, 2023 · Apt PVT
Close - Plumbing
Basin/sink
Jun 29, 2023 · Apt PVT
Close - Unsanitary condition
Mold
Jun 29, 2023 · Apt PVT
Close - Electric
No lighting
Jun 29, 2023 · Apt PVT
Close - Flooring/stairs
Stairs
Jun 29, 2023 · Apt PVT
Close - Heating
Heat related
Dec 30, 2011 · Apt 1FL
Close - Heating
Heat related
Dec 29, 2011 · Apt 4
Close - Heating
Heat related
Jan 20, 2011 · Apt 1FL
Close - General
Cooking gas
Jan 20, 2011 · Apt 1FL
Close - Heating
Heat related
Jan 20, 2011 · Apt 1FL
Close - General
Windows
Jan 20, 2011 · Apt 1FL
Close - General
Windows
Jan 20, 2011 · Apt 1FL
Close - Plumbing
Water supply
Jan 20, 2011 · Apt 1FL
Close - Heating
Heat related
Jan 14, 2011 · Apt 1FL
Close - Heating
Heat related
Jan 10, 2011 · Apt 1FL
Close - Heating
Heat related
Jan 9, 2011 · Apt 1FL
Close - Plumbing
Water-leaks
Jan 9, 2011 · Apt 1FL
Close - Heating
Heat related
Jan 9, 2011 · Apt 1FL
Close - Plumbing
Water-leaks
Jan 9, 2011 · Apt 1FL
Close - General
Windows
Jan 9, 2011 · Apt 1FL
Close - General
Windows
Jan 9, 2011 · Apt 1FL
Close - General
Doors
Jan 9, 2011 · Apt 1FL
Close - General
Windows
Jan 3, 2011 · Apt 1FL
Close - General
Windows
Jan 3, 2011 · Apt 1FL
Close - Paint/plaster
Ceiling
Jan 3, 2011 · Apt 1FL
Close - Paint/plaster
Ceiling
Jan 3, 2011 · Apt 1FL
Close - Plumbing
Water-leaks
Jan 3, 2011 · Apt 1FL
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jun 29, 2026 | $560,000 | One family dwellings | 1 |
Building details
- Building type
- One-family home (A1)
- Year built
- 1920
- Floors
- 2.5
- Residential units
- 1
- Building area
- 1,200 ft²
- Lot area
- 2,325 ft²
- Zoning
- R3A
- Community board
- 412
- Council district
- 28
- Block / lot
- 11993 / 34
- Assessed value
- $44,520
- Landmark / historic district
- No
HPD registration #928104, last renewed Jul 3, 2025.
Questions about 115-47 148 Street
Who owns 115-47 148 Street?
The owner of record in NYC Department of City Planning PLUTO data is Bayside Capital Corp..
Does 115-47 148 Street have violations?
Yes. NYC HPD has recorded 58 housing violations at this property.
Is 115-47 148 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 115-47 148 Street built?
City records list 1920 as the year it was built.
How many apartments are in 115-47 148 Street?
It has 1 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.