115-02 Van Wyck Expressway
Queens, NY 11420BBL 4-11678-0007Map
Owner of record: Gittens, Jennifer
115-02 Van Wyck Expressway is a walk-up apartment building built in 1930 in Queens, 11420. It has 3 residential units across 2 floors. The owner of record is Gittens, Jennifer. HPD has recorded 66 housing violations here, most recently on September 10, 2026. 47 of the 50 most recent violations are still open.
- HPD violations
- 66
- DOB violations
- 2
- ECB violations
- 2
- HPD complaints
- 43
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 66
- CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 10, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Sep 10, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Sep 10, 2026 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 10, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Sep 10, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, east wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Sep 10, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood door frame in the entrance located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor tiles at radiator in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Replace with new the missing switch plate cover at east wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace with new the missing lower window sash at 2 window from west at north wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Replace with new the missing entrance door in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Refit closet door in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light switch at south wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lower sash counterbalance in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing cabinet doors at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly secure the loose cabinet at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Sep 2, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jul 10, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective outlet at south wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jul 10, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jul 10, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective outlet at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jul 10, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
May 6, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
May 6, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower sash, glass plane at first window from west at north in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
May 6, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
May 6, 2026 · Apt 2
Open — Nov sent out - BHazardous
Refit door in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
May 6, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Refit entrance door in the bathroom located at apt apt2, 2nd story, 1st apartment from east at south
Apr 15, 2026 · Apt APT2
Open — Nov sent out - ANon-hazardous
Refit 1st door from north at east wall in the bathroom located at apt 2, 3rd story, 1st apartment from east at south
Mar 12, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower sash spring balance at 1st window from west at north wall in the kitchen located at apt 2, 3rd story, 1st apartment from east at south
Mar 12, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electric outlet at south wall in the kitchen located at apt 2, 3rd story, 1st apartment from east at south
Mar 12, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Certification postponment denied - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixture at the ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective reglaze the bathtub with porcelain paint in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Refit door at entrance in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance 2nd window from west at north wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective radiator shut off valve handle at east wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance 1st window from north at east wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixture at the ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at the ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixture at the ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Certification postponment granted - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, 1st door frame from south at west wall, south wall, west wall in the private hallway located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from east at south wall, south wall, east wall, west wall, 1st window frame from west at north wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Feb 19, 2026 · Apt 2
Open — Certification postponment denied
DOB building violations · 2
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Aug 8, 1988
Dob violation - active
ECB violations · 2
- Class - 1
Occupancy contrary to that allowed by bldg dept records. bldg dept records show premises as a 2 family dwelling. at time of inspection observed the cellar designated for storage changed to living space. created
May 13, 2016
Resolve - Class - 2
Work w/o a permit;noted: at cellar level install water & waste lines for 3pc bathroom(toilet,sink,shower). remedy: obtain permit.
May 13, 2016
Resolve
Complaints
- Door/window
Door
Aug 4, 2026 · Apt 2
Close - Door/window
Door
Aug 4, 2026 · Apt 2
Close - Plumbing
Basin/sink
Aug 4, 2026 · Apt 2
Close - General
Cabinet
Aug 4, 2026 · Apt 2
Close - Door/window
Window frame
Aug 4, 2026 · Apt 2
Close - Electric
Outlet/switch
Aug 4, 2026 · Apt 2
Close - Safety
Smoke detector
Aug 4, 2026 · Apt 2
Close - Plumbing
Water supply
May 4, 2026 · Apt 2
Close - Unsanitary condition
Mold
May 4, 2026 · Apt 2
Close - Unsanitary condition
Sewage
May 4, 2026 · Apt 2
Close
Show 33 more ↓
- Door/window
Window frame
May 4, 2026 · Apt 2
Close - Plumbing
Water supply
May 4, 2026 · Apt 2
Close - Plumbing
Water supply
Apr 14, 2026 · Apt APT2
Close - Door/window
Door
Apr 14, 2026 · Apt APT2
Close - Flooring/stairs
Floor
Apr 14, 2026 · Apt APT2
Close - Electric
Outlet/switch
Mar 9, 2026 · Apt 2
Close - Unsanitary condition
Mold
Mar 9, 2026 · Apt 2
Close - Flooring/stairs
Floor
Mar 9, 2026 · Apt 2
Close - Door/window
Window frame
Mar 9, 2026 · Apt 2
Close - Door/window
Window frame
Feb 26, 2026 · Apt 2
Open - Electric
No lighting
Feb 18, 2026 · Apt 2
Close - Plumbing
Water supply
Feb 18, 2026 · Apt 2
Close - Electric
Outlet/switch
Feb 18, 2026 · Apt 2
Close - Unsanitary condition
Mold
Feb 18, 2026 · Apt 2
Close - Plumbing
Water supply
Feb 18, 2026 · Apt 2
Close - Plumbing
Bathtub/shower
Feb 18, 2026 · Apt 2
Close - Door/window
Window frame
Feb 18, 2026 · Apt 2
Close - Electric
Outlet/switch
Feb 18, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Feb 18, 2026 · Apt 2
Close - Plumbing
Water supply
Feb 18, 2026 · Apt 2
Close - Electric
Outlet/switch
Dec 17, 2025 · Apt 2
Close - Door/window
Window frame
Dec 17, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 22, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 14, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 12, 2025 · Apt 2
Close - Door/window
Window frame
Nov 12, 2025 · Apt 2
Close - Plumbing
Water supply
Sep 3, 2025 · Apt 2
Close - Plumbing
Water supply
Sep 3, 2025 · Apt 2
Close - Electric
Outlet/switch
Sep 3, 2025 · Apt 2
Close - Electric
Power outage
Aug 31, 2025 · Apt 2
Close - Electric
Outlet/switch
Aug 31, 2025 · Apt 2
Close - Heat/hot water
Entire building
Dec 13, 2017 · Apt BLDG
Close - Electric
Power outage
Mar 10, 2017 · Apt 2NDFLR
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1930
- Floors
- 2
- Residential units
- 3
- Building area
- 1,698 ft²
- Lot area
- 3,300 ft²
- Zoning
- R3-2
- Community board
- 410
- Council district
- 28
- Block / lot
- 11678 / 7
- Assessed value
- $52,380
- Landmark / historic district
- No
Questions about 115-02 Van Wyck Expressway
Who owns 115-02 Van Wyck Expressway?
The owner of record in NYC Department of City Planning PLUTO data is Gittens, Jennifer.
Does 115-02 Van Wyck Expressway have violations?
Yes. NYC HPD has recorded 66 housing violations at this property.
Is 115-02 Van Wyck Expressway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 115-02 Van Wyck Expressway built?
City records list 1930 as the year it was built.
How many apartments are in 115-02 Van Wyck Expressway?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.