roofy

137-05 Cross Bay Boulevard

Queens, NY 11417BBL 4-11529-0001Map

Owner of record: 13705 Crossbay Blvd LLC

137-05 Cross Bay Boulevard is a mixed residential and retail building built in 1925 in Queens, 11417. It has 2 residential units across 2 floors. The owner of record is 13705 Crossbay Blvd LLC. HPD has recorded 50 housing violations here, most recently on August 27, 2025. 14 of the 50 most recent violations are still open.

HPD violations
50
DOB violations
2
ECB violations
0
HPD complaints
42

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Aug 27, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 50

  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story

    Aug 27, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective street entrance door hinges to building , 1st story

    Aug 27, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective vinyl flooring in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective vinyl flooring in the private hallway located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective electrical outlet at north wall in the 2nd room from north at east located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 2nd room from north at east located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • A

    Replace with new the missing electrical outlet cover in the foyer located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less then 10sq at west and north walls in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Closed — Violation closed
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the private hallway located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over ceiling in the private hallway located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling, north, west and east wall in the 2nd room from north at east located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from north at east located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 1st apartment from north at east

    Aug 27, 2025 · Apt 2R

    Closed — Violation closed
  • C

    Fire escape defective. properly secure shuttle ladders at public hall, 2nd story

    Aug 27, 2025

    Open — Invalid certification
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story

    Aug 27, 2025

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing , 1st story

    Aug 27, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing , 1st story

    Aug 27, 2025

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less then 10sq at west and north walls in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east original violation 18189355 issued 27-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Aug 27, 2025 · Apt 2R

    Open — Defect letter issued
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall and ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east original violation 18096752 issued 19-jul-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Jul 19, 2025 · Apt 2R

    Open — Not complied with
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Jul 19, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Jul 19, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof . at public hall, 2nd story

    Jul 19, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox . at public hall, 1st story

    Jul 19, 2025

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system . at public hall, 1st story

    Jul 19, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges, building front entrance door at public hall, 1st story

    Jul 19, 2025

    Open — Nov sent out
  • A

    Properly secure the loose shower head to north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Jul 19, 2025 · Apt 2R

    Closed — Violation dismissed
  • A

    Provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door . in the entrance located at apt 2r, 2nd story, 1st apartment from north at east

    Jul 19, 2025 · Apt 2R

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings .

    Jul 19, 2025

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall and ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    Jul 19, 2025 · Apt 2R

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 1st apartment from north at east

    Jul 19, 2025 · Apt 2R

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 19, 2025

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at . at public hall, 1st story

    Jul 19, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 19, 2025

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jul 19, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 2, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2024

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 4, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 1, 2019

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 24, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 5, 2017

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2016

    Closed — Violation dismissed

DOB building violations · 2

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Boiler boiler optional

    18b

    May 3, 1990

    Vp-violation unserved ecb-active

ECB violations · 0

No ECB violations on record

Complaints

  • Unsanitary condition

    Mold

    Aug 1, 2025 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Aug 1, 2025 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Aug 1, 2025 · Apt 2R

    Close
  • Door/window

    Window frame

    Aug 1, 2025 · Apt 2R

    Close
  • Safety

    Carbon monoxide detector

    Aug 1, 2025 · Apt 2R

    Close
  • Safety

    Fire escape

    Aug 1, 2025 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Aug 1, 2025 · Apt 2R

    Close
  • Safety

    Smoke detector

    Aug 1, 2025 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Aug 1, 2025 · Apt 2R

    Close
  • Water leak

    Damp spot

    Jul 9, 2025 · Apt 2R

    Close
Show 32 more ↓
  • Paint/plaster

    Wall

    Jul 9, 2025 · Apt 2R

    Close
  • Paint/plaster

    Radiator

    Jul 9, 2025 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Jul 9, 2025 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Jul 9, 2025 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Jul 9, 2025 · Apt 2R

    Close
  • Door/window

    Window frame

    Jul 9, 2025 · Apt 2R

    Close
  • General

    Bell/buzzer/intercom

    Jul 9, 2025 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Jul 9, 2025 · Apt 2R

    Close
  • Electric

    Outlet/switch

    Jul 9, 2025 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Jul 9, 2025 · Apt 2R

    Close
  • Safety

    Smoke detector

    Jul 9, 2025 · Apt 2R

    Close
  • Safety

    Fire escape

    Jul 9, 2025 · Apt 2R

    Close
  • Safety

    Carbon monoxide detector

    Jul 9, 2025 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Jul 9, 2025 · Apt 2R

    Close
  • Safety

    Fire escape

    Jul 9, 2025 · Apt 2R

    Close
  • Electric

    No lighting

    Jul 9, 2025 · Apt 2R

    Close
  • Paint/plaster

    Door/frame

    Jul 9, 2025 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 9, 2025 · Apt 2R

    Close
  • Door/window

    Door frame

    Jul 9, 2025 · Apt 2R

    Close
  • Flooring/stairs

    Stairs

    Jul 9, 2025 · Apt 2R

    Close
  • Outside building

    Skylight

    Jul 9, 2025 · Apt 2R

    Close
  • General

    Signage missing

    Jul 9, 2025 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Jan 27, 2020 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Jan 27, 2020 · Apt 2R

    Close
  • Door/window

    Window frame

    Jan 27, 2020 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Jan 27, 2020 · Apt 2R

    Close
  • General

    Cabinet

    Jan 27, 2020 · Apt 2R

    Close
  • Door/window

    Window pane

    Jan 27, 2020 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Jan 27, 2020 · Apt 2R

    Close
  • Safety

    Carbon monoxide detector

    Jan 27, 2020 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Jan 27, 2020 · Apt 2R

    Close
  • Safety

    Smoke detector

    Jan 27, 2020 · Apt 2R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S2)
Year built
1925
Floors
2
Residential units
2
Building area
2,500 ft²
Lot area
1,950 ft²
Zoning
R5D
Community board
410
Council district
32
Block / lot
11529 / 1
Assessed value
$64,380
Landmark / historic district
No

HPD registration #411015, last renewed Sep 30, 2025.

Questions about 137-05 Cross Bay Boulevard

Who owns 137-05 Cross Bay Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is 13705 Crossbay Blvd LLC.

Does 137-05 Cross Bay Boulevard have violations?

Yes. NYC HPD has recorded 50 housing violations at this property.

Is 137-05 Cross Bay Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 137-05 Cross Bay Boulevard built?

City records list 1925 as the year it was built.

How many apartments are in 137-05 Cross Bay Boulevard?

It has 2 residential units and 3 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.