Violations at 88-08 151 Avenue
Queens, NY 11414 · BBL 4-11434-0007 · Back to the property
HPD housing violations
29 HPD violations, newest first.
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the walls in the 1st bathroom from east located at apt 3c, 3rd story, 1st apartment from west at north
Jan 14, 2026 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective the ceramic tiles at west wall inside shower stall in the 2nd bathroom from east located at apt 3c, 3rd story, 1st apartment from west at north
Jan 14, 2026 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from east located at apt 3c, 3rd story, 1st apartment from west at north
Jan 14, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 1st bathroom from east located at apt 3c, 3rd story, 1st apartment from west at north
Jan 14, 2026 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from west at north
Jan 14, 2026 · Apt 3C
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 4h, 4th story, 5th apartment from east at south
Jan 5, 2022 · Apt 4H
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). dfefective in the entire apartment located at apt 4h, 4th story, 5th apartment from east at south
Jan 5, 2022 · Apt 4H
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 1, 2018
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Dec 1, 2018
Open — Nov sent out - ANon-hazardous
Replace with new the missing safety caps on outlet at south wall at public hall, 2nd story
Dec 1, 2018
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door in the entrance located at apt 2c, 2nd story, 1st apartment from north at east
Dec 1, 2018 · Apt 2C
Open — Nov certified late - BHazardous
M/d law abate the nuisance consisting of egress window opens outward on to fire escape in the 1st room from east at north located at apt 2c, 2nd story, 1st apartment from north at east
Dec 1, 2018 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 1st room from east at north located at apt 2c, 2nd story, 1st apartment from north at east
Dec 1, 2018 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 2c, 2nd story, 1st apartment from north at east
Dec 1, 2018 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cement stucco at ceiling in the terrace located at apt 5k, 5th story, 1st apartment from east at south
Jul 9, 2012 · Apt 5K
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective concrete pointing at south and north sides of chimney.
Sep 11, 1999
Open — Nov sent out - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint broken plaster at north room east wall 5 sty apt 5c. , section '' ''
Mar 3, 1997 · Apt 5C
Open — Nov sent out - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint broken plaster at south room east wall 5 sty apt 5c ms dubovick 718 848 6610 brittany 6 yrs old. , section '' ''
Mar 3, 1997 · Apt 5C
Open — Nov sent out - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint east wall front room 4 sty apt 4b er1. , section '' ''
Oct 31, 1996 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint ceiling and east wall rear room 4 sty apt 4b denise 6410003 er1. , section '' ''
Oct 31, 1996 · Apt 4B
Open — Nov sent out
DOB building violations
The newest 50 of 89 DOB violations. The city keeps the complete history.
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Construction other optional
Due to hazard posed by the cracked concrete slabs on the balconies, on west and east elevations. remedy: vacate all blaconies on lines k and c on east elevation, lines g and f on west elevation until conditions are remedied and balconies are made safe
Aug 12, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 16, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 16, 2022
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Feb 18, 2022
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Feb 18, 2022
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Feb 18, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2021
Dob violation - resolved - Elevator elevatorrequired
Cease use
Sep 23, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 12, 2019
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2017
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2016
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2016
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2016
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)
Jun 1, 2016
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2015
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2015
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Failure to submit eer none
Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4
Dec 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2014
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 6, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 10, 2013
Dob violation - resolved
ECB violations
24 ECB violations, newest first.
- Class - 1
Door zone restrictor not working tampered with disabled(cu). no dlm installed on this controller. as mandated by code 3.10.12. of the the nycbc 2014 k3 building code.
Mar 29, 2023 · Penalty $3,125
Resolve - Class - 1
No dlm installed on this controller. as mandated by code a-17.1 section 3.10.12 of the nycbe2014 k3 building code. reverse phase relay not working.
Mar 29, 2023 · Penalty $3,125
Resolve - Class - 1
Failure to take&provide adequate safety measure,sidewalkshed&controlled access zone where required to protect&secure public safety from documented unsafe facade.this tr6 rec from pe/ra on7/14/22 filed facades u
Aug 9, 2022 · Penalty $10,000
Resolve - Class - 2
Failure to maintain building exterior walls or appurtenances.note:at time of inspection observed at exp #1 east elevation cracked brickwork cracked beam spandrels balcony slabs covered with netting. exp #2 sout
May 20, 2022 · Penalty $1,250
Active - Class - 1
Failure to maintain exterior building walls and appurtenances.as notedat time of inspection i observed on exposure#1,2,3,4 & roof hazardous conditions at parapet disintegrating coping stone over entrance door d
Mar 30, 2022 · Penalty $2,500
Active - Class - 1
Failure to take and secure required measures to protect the public from unsafe facade.technical report field by ra/pe on 02/18/2022 cited the facade as unsafe and to this day 03/30/2022 adequate safety measures
Mar 30, 2022 · Penalty $10,000
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
Nov 8, 2021 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
Nov 8, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 8a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#811697.rem:submit acceptable required t
Jun 1, 2021 · Penalty $1,250
Resolve - Class - 3
Work does not conformed to approved construction documenyts and/or amendments.noted:(1) cel boiler (rm)stall area found opening wall.approx (4'wx 8 ht) to adjacent storage(rm)with 2 pc bathroom(rm) plan #440504
Nov 13, 2018 · Penalty $250
Resolve - Class - 2
21j1,56y13,56o2 21-j-1 adjust 4th fl door contacts. 56-y=13 seal oil leak 56-o-2 clean machine.
Jun 9, 2017
Resolve - Class - 2
10m07,10h11. 10m07-missing 4th floor door gib; 10h11-replace worn m.o.rollers where necessary.
Nov 18, 2013
Resolve - Class - 1
Sec. 3314.1 failure to protect all persons & property. noted: at time of inspection pointing in progress at exposure #2 at 3rd stories levelusing suspended c-hook scaffolds. no danger sign,no flag person,no
Oct 25, 2011 · Penalty $12,000
Resolve - Class - 2
72m07 100b07 71m07. 72m07-provide pit stop switch- as per appendix k. 100b07-provide proper size of a toeguard (21") as per appendix k. 71m07-provide light switch in the pit.
Mar 21, 2011
Resolve - Class - 2
72m07 100b07 71m07. 72m07-provide pit stop switch-as per appendix. 100b07-provide proper size of a toeguard (21") as per appendix k. 71m07-provide light switch in the pit.
Mar 21, 2011
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations
Feb 6, 2009 · Penalty $400
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations
Feb 6, 2009 · Penalty $400
Resolve - Class - 3
44h08.
Jul 29, 2008 · Penalty $500
Resolve - Non-hazardous
03m07 32d06 48o02 49o02 52y11 55b07 80x11 60x11 19m07 80i12 (03-m-07)provide capacity platein thecar, 32-d-06) povide cover missing for riser box between l to1,48-o-02, 49-o-02)clean hoist cable and gov cable
Aug 20, 2003 · Penalty $350
Resolve - Non-hazardous
57o2,58o2,59o2,18q3,22d6. -18q3 door lock covers missing - replace
Sep 1, 1998
Resolve - Non-hazardous
72o08j22d50y
Dec 13, 1997 · Penalty $180
Resolve - Non-hazardous
73o08j22o50y
Dec 13, 1997 · Penalty $180
Resolve - Non-hazardous
39r, installed traction sheave without a permit.
Nov 14, 1990
Resolve - Non-hazardous
39r, 39 installed traction sheave without a permit.
Nov 14, 1990
Resolve