86-10 151 Avenue
Queens, NY 11414BBL 4-11431-0015Map
Owner of record: Greenwood Arms Co-Op Corp
86-10 151 Avenue is an elevator apartment building built in 1966 in Queens, 11414. It has 161 residential units across 6 floors. The owner of record is Greenwood Arms Co-Op Corp. HPD has recorded 124 housing violations here, most recently on September 23, 2026. 28 of the 50 most recent violations are still open.
- HPD violations
- 124
- DOB violations
- 80
- ECB violations
- 51
- HPD complaints
- 136
Available now in this building
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 124
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Sep 23, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Sep 23, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door at entrance located at cellar apt lb, 1st cellar apt from north at east
Jul 12, 2026 · Apt LB
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at cellar apt lb, 1st cellar apt from north at east
Jul 12, 2026 · Apt LB
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at cellar apt lb, 1st cellar apt from north at east
Jul 12, 2026 · Apt LB
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, and east wall, at cellar apt in the 1st room from north located at apt lb, 1st apartment from north at east
Jul 12, 2026 · Apt LB
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling, east, and north walls, at cellar apt in the 1st room from north located at apt lb, 1st apartment from north at east
Jul 12, 2026 · Apt LB
Open — Notice of issuance sent to tenant - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Jul 1, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall
Jul 1, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Jul 1, 2026
Open — Nov sent out
DOB building violations · 80
- Construction other optional
Failure to maintain bldg in a safe condition.bldg sffrd fire on 11/14/24 fire dmg occurd@5thfl apts 4d,4e,6d,6e,&roof above 6d,6e,6c prtlly open/cllpsd.water dmg thruout c,d,e,n lines@south wing.ownr to rtain nyspe to eval ent bldg&file rpair job(s)w/dob bldg to perm rpaird undr prmt strtng by 1/13/25&cmpltd&sgnd off w/loc by 2/28/2025
Nov 14, 2024
Dob violation - dismissed - Construction other optional
Emergency work order.due to fire on 11/14/24,fire damage occurred@5th fl apts,4d,4e,& cont'd up plumbng chase thru 5d,53,6d,6e,&roof.joists& flrs fire dmgd@5thfl thru roof.roof prtlly open/cllpsd.ownr to rtain nyspe&gc to immed 1.temp shore bldg as req'd.2.instll temp roof w/ barricades,3.temp partitions@2nd to 7thfl
Nov 14, 2024
Dob violation - dismissed - Construction other optional
Structure rendered non-compliant. at time of inspection observed at 4th,5th and 6th floor extensive charring of beams, water and smoke damage throughout. roof is open and windows out. building electric service has been cut. these hazardous conditions have therefore rendered the entire building unsafe to occupy.
Nov 14, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 22, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 26, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 26, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2019
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 16, 2018
Dob violation - resolved
ECB violations · 51
- Class - 1
Class 2: repair in-car emergency phone., provide in-case of fire sign in the lobby., class 1: cease use item. door zone restrictor has been rendered inoperative. this is a safety device to ensure elevator passe
Jul 29, 2023 · Penalty $1,280
Active - Class - 2
Failure to maintain exterior facade & appurtenances.at time of inspection observed cracks at multiple locations at exp #2 #3 north & east elevations.also observed cracks at chimney.remedy:maintain exterior faca
Dec 8, 2022 · Penalty $1,250
Resolve - Class - 2
Removal of public protection from unsafe facade without approval from the department.at the time of inspection observed there is no public protection along the exterior facade that filed unsafe.rem:comply with
Apr 26, 2022
Resolve - Class - 2
Failure to file acceptable amended cycle 6 and 7c report indicating correction of unsafe conditions described in initial facades required by28-302.5 for control#711691.remedy:file acceptable report.
Oct 8, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #35210587l issued on 3/17/17,and to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2).remedy:file a certifi
Jun 29, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#811691.rem:submit acceptable required t
Feb 13, 2020
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#811690.rem:submit acceptable required t
Feb 13, 2020
Resolve - Class - 2
69m7,59b7,98bb7,80m7.69m7 code data tag missing.59b7 brake maintenancetag insuff must have date on tag.98bb7 5 year test tag expired.80m7 provide cwt runby signage.
Jun 13, 2017
Resolve - Class - 1
Failure to provide safety measure such as sidewalk shed's,fence etc wehre require to protect and secure public safety from documented un safe facade, as per 1rcny-103-04,building facade were designated as
Mar 17, 2017 · Penalty $24,000
Resolve - Class - 2
Failure to file acceptable amended report indicating correction of unsafe conditions described in initial local law 11/98 report.agg 2 history of noncompliance on 36027604p,360226609j.rem:file acceptable amende
Nov 7, 2016 · Penalty $10,000
Resolve
Complaints
- Elevator
Maintenance
Aug 27, 2026 · Apt BLDG
Close - General
Signage missing
Aug 27, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Jul 9, 2026 · Apt LB
Close - Paint/plaster
Wall
Jul 9, 2026 · Apt LB
Close - Paint/plaster
Ceiling
Jul 9, 2026 · Apt LB
Close - Flooring/stairs
Floor
Jul 9, 2026 · Apt LB
Close - Paint/plaster
Wall
Jul 9, 2026 · Apt LB
Close - Paint/plaster
Ceiling
Jul 9, 2026 · Apt LB
Close - Paint/plaster
Wall
Jul 9, 2026 · Apt LB
Close - Paint/plaster
Ceiling
Jul 9, 2026 · Apt LB
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Sep 4, 2026 | $147,000 | Coops - elevator apartments | — |
| Jul 24, 2026 | $325,000 | Coops - elevator apartments | — |
| Jun 2, 2026 | $145,000 | Coops - elevator apartments | — |
| Apr 29, 2026 | $210,000 | Coops - elevator apartments | — |
| Apr 9, 2026 | $265,000 | Coops - elevator apartments | — |
| Mar 6, 2026 | $360,000 | Coops - elevator apartments | — |
| Dec 12, 2025 | $335,000 | Coops - elevator apartments | — |
| Nov 26, 2025 | $366,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1966
- Floors
- 6
- Residential units
- 161
- Building area
- 169,000 ft²
- Lot area
- 106,150 ft²
- Zoning
- R5
- Community board
- 410
- Council district
- 32
- Block / lot
- 11431 / 15
- Assessed value
- $4,600,800
- Landmark / historic district
- No
HPD registration #420590, last renewed Sep 12, 2026.
Questions about 86-10 151 Avenue
Who owns 86-10 151 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Greenwood Arms Co-Op Corp.
Does 86-10 151 Avenue have violations?
Yes. NYC HPD has recorded 124 housing violations at this property.
Is 86-10 151 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 86-10 151 Avenue built?
City records list 1966 as the year it was built.
How many apartments are in 86-10 151 Avenue?
It has 161 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.

