151-23 79 Street
Queens, NY 11414BBL 4-11426-0044Map
Owner of record: Tennis Court Aparts INC
151-23 79 Street is a walk-up apartment building built in 1978 in Queens, 11414. It has 6 residential units across 3 floors. The owner of record is Tennis Court Aparts INC. HPD has recorded 36 housing violations here, most recently on May 6, 2026. 17 of the 36 most recent violations are still open.
- HPD violations
- 36
- DOB violations
- 4
- ECB violations
- 1
- HPD complaints
- 47
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 36
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of stopper hook with eye at building front entrance door at public hall, 1st story
Jul 11, 2023
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jul 11, 2023
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective porcelain anamel glaze in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Apr 5, 2022 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective window frame at east wall in the 2nd room from east located at apt 3b, 3rd story, 1st apartment from north at east
Apr 5, 2022 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain anamel glaze in the 1st bathroom from east located at apt 3b, 3rd story, 1st apartment from north at east
Mar 30, 2022 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair the broken or defective window frame at east wall in the 1st room from east located at apt 3b, 3rd story, 1st apartment from north at east
Mar 30, 2022 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (defective hinges) in the entrance located at apt 3b, 3rd story, 2nd apartment from north at east
Mar 23, 2022 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Refit door in the entrance located at apt 3b, 3rd story, 2nd apartment from north at east
Mar 23, 2022 · Apt 3B
Open — Nov sent out
Show 26 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 3b, 3rd story, 2nd apartment from north at east
Mar 23, 2022 · Apt 3B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 3b, 3rd story, 2nd apartment from north at east
Mar 23, 2022 · Apt 3B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling above tub in the bathroom located at apt 3b, 3rd story, 2nd apartment from north at east
Mar 23, 2022 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden floor in the 2nd room from north at east located at apt 3b, 3rd story, 2nd apartment from north at east
Mar 23, 2022 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair the broken or defective window in the 2nd room from north at east located at apt 3b, 3rd story, 2nd apartment from north at east
Mar 23, 2022 · Apt 3B
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Refit upper and lower sash north and south windows east wall in the 1st room from east located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Refit entrance door in the 1st room from east at north located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Code: replace or repair the self-closing the doors that is missing or defective in the entrance located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Open — Nov certified late - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 11, 2022
Open — Nov sent out - BHazardous
Replace with new the missing closet door west wall in the 1st room from east at north located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at north located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at thermostat north wall in the 1st room from east located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective porcelain glaze at bath tub in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Repair leaky water closet flush pipe connection in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bath tub in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... 3 square feet east wall, 2 square feet west wall, 3 square feet north wall in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... 3 square feet east wall, 2 square feet west wall, 3 square feet north wall in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east original violation 15000611 issued 11-mar-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 11, 2022 · Apt 3B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 3b, 3rd story, 1st apartment from north at east
Mar 11, 2022 · Apt 3B
Open — Invalid certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 3, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 14, 2021
Closed — Violation dismissed
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 1
- Class - 2
Fire rate boiler room: correct violating condition and submit a certificate of correction.
May 7, 2024 · Penalty $625
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Jul 6, 2023 · Apt BLDG
Close - Door/window
Window frame
Sep 28, 2022 · Apt 3R
Close - Plumbing
Bathtub/shower
Sep 28, 2022 · Apt 3R
Close - Door/window
Door frame
Sep 28, 2022 · Apt 3R
Close - Unsanitary condition
Mold
Sep 28, 2022 · Apt 3R
Close - Door/window
Window frame
May 6, 2022 · Apt 3B
Close - Plumbing
Bathtub/shower
May 6, 2022 · Apt 3B
Close - Plumbing
Water supply
Apr 25, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Apr 20, 2022 · Apt 3B
Close
Show 37 more ↓
- Plumbing
Bathtub/shower
Apr 1, 2022 · Apt 3B
Close - Safety
Fire escape
Apr 1, 2022 · Apt 3B
Close - Door/window
Window frame
Apr 1, 2022 · Apt 3B
Close - Door/window
Door frame
Mar 24, 2022 · Apt 3B
Close - Door/window
Door
Mar 24, 2022 · Apt 3B
Close - Paint/plaster
Wall
Mar 24, 2022 · Apt 3B
Close - Flooring/stairs
Floor
Mar 22, 2022 · Apt 3B
Close - Paint/plaster
Wall
Mar 22, 2022 · Apt 3B
Close - Plumbing
Bathtub/shower
Mar 22, 2022 · Apt 3B
Close - Door/window
Window frame
Mar 22, 2022 · Apt 3B
Close - Unsanitary condition
Mold
Mar 22, 2022 · Apt 3B
Close - Plumbing
Bathtub/shower
Mar 16, 2022 · Apt 3B
Close - Plumbing
Toilet
Mar 16, 2022 · Apt 3B
Close - Door/window
Window frame
Mar 9, 2022 · Apt 3B
Close - Heat/hot water
Apartment only
Mar 9, 2022 · Apt 3B
Close - Paint/plaster
Ceiling
Mar 9, 2022 · Apt 3B
Close - Unsanitary condition
Mold
Mar 9, 2022 · Apt 3B
Close - Flooring/stairs
Floor
Mar 9, 2022 · Apt 3B
Close - Plumbing
Toilet
Mar 9, 2022 · Apt 3B
Close - Door/window
Window frame
Mar 3, 2022 · Apt 3B
Close - Door/window
Door
Mar 3, 2022 · Apt 3B
Close - Flooring/stairs
Floor
Mar 3, 2022 · Apt 3B
Close - Paint/plaster
Ceiling
Mar 3, 2022 · Apt 3B
Close - Unsanitary condition
Mold
Mar 3, 2022 · Apt 3B
Close - Paint/plaster
Ceiling
Mar 3, 2022 · Apt 3B
Close - Plumbing
Bathtub/shower
Mar 3, 2022 · Apt 3B
Close - Plumbing
Toilet
Mar 3, 2022 · Apt 3B
Close - Safety
Carbon monoxide detector
Feb 28, 2022 · Apt 3B
Close - Paint/plaster
Ceiling
Feb 28, 2022 · Apt 3B
Close - Plumbing
Bathtub/shower
Feb 28, 2022 · Apt 3B
Close - Door/window
Door
Feb 28, 2022 · Apt 3B
Close - Flooring/stairs
Floor
Feb 28, 2022 · Apt 3B
Close - Safety
Smoke detector
Feb 28, 2022 · Apt 3B
Close - Door/window
Window frame
Feb 28, 2022 · Apt 3B
Close - Unsanitary condition
Mold
Feb 28, 2022 · Apt 3B
Close - General
Mold
Nov 6, 2008 · Apt 1B
Close - General
Mold
Nov 6, 2008 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1978
- Floors
- 3
- Residential units
- 6
- Building area
- 3,886 ft²
- Lot area
- 2,401 ft²
- Zoning
- R4
- Community board
- 410
- Council district
- 32
- Block / lot
- 11426 / 44
- Assessed value
- $388,800
- Landmark / historic district
- No
Questions about 151-23 79 Street
Who owns 151-23 79 Street?
The owner of record in NYC Department of City Planning PLUTO data is Tennis Court Aparts INC.
Does 151-23 79 Street have violations?
Yes. NYC HPD has recorded 36 housing violations at this property.
Is 151-23 79 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 151-23 79 Street built?
City records list 1978 as the year it was built.
How many apartments are in 151-23 79 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.