Violations at 218-01 Linden Boulevard
Queens, NY 11411 · BBL 4-11319-0006 · Back to the property
HPD housing violations
31 HPD violations, newest first.
- ANon-hazardous
Refit door in the entrance located at apt 2, 2nd story, 1st apartment from west at north
Oct 12, 2018 · Apt 2
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in closet & east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Oct 12, 2018 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling & all walls in closet in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Oct 12, 2018 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall in the 1st room from east at north located at apt 2, 2nd story, apartment at north
Sep 28, 2018 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall in the 1st room from east at north located at apt 2, 2nd story, apartment at north
Sep 28, 2018 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall at north closet in the 1st room from east at south located at apt 2, 2nd story, apartment at north
Sep 28, 2018 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall in the 1st room from east at south located at apt 2, 2nd story, apartment at north
Sep 28, 2018 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice located at apt 2, 2nd story, apartment at north
Sep 28, 2018 · Apt 2
Open — Nov sent out - ANon-hazardous
Refit apartment entrance door in the entrance located at apt 2, 2nd story, apartment at north
Sep 14, 2018 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective door knob at apartment entrance door in the entrance located at apt 2, 2nd story, apartment at north
Sep 14, 2018 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 2nd story, apartment at north
Sep 14, 2018 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story, apartment at north
Sep 14, 2018 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches located at apt 2, 2nd story, 1st apartment from west at north
Sep 14, 2016 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Sep 14, 2016 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective lower shelf at sink base in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Sep 14, 2016 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective laminate countertop in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Sep 14, 2016 · Apt 2
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Sep 14, 2016 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulk at seam between bath and wall tile in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Sep 14, 2016 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at north wall at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Sep 14, 2016 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Sep 14, 2016 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at closet in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from west at north
Sep 14, 2016 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story
Oct 19, 2010 · Apt 2
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 2, 2nd story
Oct 18, 2007 · Apt 2
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 1, 1st story
Jul 23, 2007 · Apt 1
Open — Nov sent out - BHazardous
Properly secure the loose gutter 2sty. at roof rear of the building
Jul 23, 2007
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
Apr 27, 2004 · Apt 1
Open — Nov sent out - BHazardous
Provide adequate lighting for at ceiling light fixture at public hall, 1st story
Apr 27, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of no electric supply in the bathroom located at apt 1, 1st story
Apr 27, 2004 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of no electrical power at public hall
Apr 24, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1 fl, 1st story
Apr 24, 2004 · Apt 1 FL
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of no electrical power at bathroom outlet & light fixture located at apt 1 fl, 1st story
Apr 24, 2004 · Apt 1 FL
Open — Nov sent out
DOB building violations
No DOB violations on record
ECB violations
2 ECB violations, newest first.
- Non-hazardous
Work w/o a permit.work noted:at cellar level installed water & waste lines for a shower in bthrm.remedy:obtain permit or restore to prior legal condition.
Aug 29, 2007 · Penalty $2,500
Active - Hazardous
Occupancy contrary to dept of bldg records.dob records indicates residence to be a legal 2 family.illegal occupancy noted:at cellar level erected partition for 1 bdrm & installed water & waste lines 3pc bthrm
Aug 29, 2007 · Penalty $2,500
Active