211-34 99 Avenue
Queens, NY 11429BBL 4-10880-0142Map
Owner of record: Skeete, Marcia
211-34 99 Avenue is a two-family home built in 1915 in Queens, 11429. It has 2 residential units across 2 floors. The owner of record is Skeete, Marcia. HPD has recorded 88 housing violations here, most recently on November 25, 2025. 9 of the 50 most recent violations are still open.
- HPD violations
- 88
- DOB violations
- 0
- ECB violations
- 4
- HPD complaints
- 93
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 88
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2025
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in ,wasteline at wash basin in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Nov 9, 2025 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 9, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Nov 9, 2025 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 9, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall, ceiling, west wall, south wall, west wall, south wall, west wall, south wall, west wall, south wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story
Aug 15, 2025
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the foyer , the 1st room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Open — Defect letter issued - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Open — Defect letter issued - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall, north wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling, ceiling in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling, ceiling, ceiling in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Refit window at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from south at west wall door frame, 1st door frame from south at west wall in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east wall in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling ceiling in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall, north wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Open — First no access to re- inspect violation - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Open — Defect letter issued - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in at wasteline at washbasin in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 2nd story
Aug 15, 2025
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from north at east wall, east wall, 1st window frame from west at north wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Open — Defect letter issued - BHazardous
Repair the roof so that it will not leak over ceiling ceiling in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from east at south wall, east wall, 1st closet from south at west wall door frame, 1st door frame from south at west wall, east wall, 1st closet from south at west wall door frame, 1st door frame from south at west wall, east wall, 1st radiator from east at south wall, 1st closet from south at west wall door frame, 1st door frame from south at west wall in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective rubber gasket at upper and lower refrigerator door in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Aug 15, 2025 · Apt 2
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 5, 2024
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Oct 17, 2021 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling, east and west walls in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Oct 17, 2021 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Oct 17, 2021 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Oct 17, 2021 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from north at east
Oct 17, 2021 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from north at east
Oct 17, 2021 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceramic floor tile in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Oct 17, 2021 · Apt 2
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 4
- Class - 3
Work without a permit, noted at cellar level. erected full height partition walls creating a bathroom and a bedroom., obtain permit or restore premises to prior legal condition
Nov 18, 2024 · Penalty $500
Active - Class - 1
Work without a permit, noted at cellar level. installed water and waste lines for residential sink, dishwasher and 3pc bathroom (shower, sink, toilet). installed gas line for gas stove., obtain permit
Nov 18, 2024 · Penalty $12,500
Active - Class - 2
Residence converted from a legal 2-family to 3-family at cellar level. dob records state premises to be a legal 2 family (1st & 2nd level) w/cellar as ordinary use. cellar is now setup & arranged as a class "a"
Nov 18, 2024 · Penalty $10,000
Active - Class - 3
Failure to maintain building in a code-compliant manner. at the time of inspection, at the front of the building i observed loose and damaged pieces of a small section of roof shingles. vertical cracks at front
Jul 9, 2021 · Penalty $500
Active
Complaints
- Paint/plaster
Wall
Nov 6, 2025 · Apt 2
Close - Unsanitary condition
Mold
Nov 6, 2025 · Apt 2
Close - Appliance
Refrigerator
Nov 6, 2025 · Apt 2
Close - Unsanitary condition
Pests
Nov 6, 2025 · Apt 2
Close - Door/window
Door
Nov 6, 2025 · Apt 2
Close - Appliance
Electric/gas range
Nov 6, 2025 · Apt 2
Close - Paint/plaster
Ceiling
Nov 6, 2025 · Apt 2
Close - Plumbing
Basin/sink
Nov 6, 2025 · Apt 2
Close - Paint/plaster
Wall
Nov 6, 2025 · Apt 2
Close - Flooring/stairs
Floor
Nov 6, 2025 · Apt 2
Close
Show 40 more ↓
- Plumbing
Toilet
Aug 12, 2025 · Apt 2
Close - Unsanitary condition
Mold
Aug 12, 2025 · Apt 2
Close - Paint/plaster
Wall
Aug 12, 2025 · Apt 2
Close - Paint/plaster
Wall
Aug 12, 2025 · Apt 2
Close - Appliance
Electric/gas range
Aug 12, 2025 · Apt 2
Close - Unsanitary condition
Pests
Aug 12, 2025 · Apt 2
Close - Appliance
Refrigerator
Aug 12, 2025 · Apt 2
Close - Paint/plaster
Ceiling
Aug 12, 2025 · Apt 2
Close - Flooring/stairs
Floor
Aug 12, 2025 · Apt 2
Close - Plumbing
Basin/sink
Aug 12, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Jan 8, 2024 · Apt 2
Close - Flooring/stairs
Floor
Oct 9, 2021 · Apt 2
Close - Unsanitary condition
Pests
Oct 9, 2021 · Apt 2
Close - Paint/plaster
Wall
Oct 9, 2021 · Apt 2
Close - Plumbing
Toilet
Oct 9, 2021 · Apt 2
Close - Nonconst
Vermin
Jun 28, 2007 · Apt 1FL
Close - General
Locks
Aug 5, 2006 · Apt 1A
Close - Heating
Heat related
Apr 5, 2006 · Apt 2A
Close - Heating
Heat related
Feb 19, 2006 · Apt 2A
Close - General
Mold
Dec 9, 2005 · Apt 2FL
Close - Plumbing
Radiator
Dec 9, 2005 · Apt 2FL
Close - Plumbing
Basin/sink
Dec 9, 2005 · Apt 2FL
Close - Plumbing
Bathtub/shower
Dec 9, 2005 · Apt 2FL
Close - Plumbing
Toilet
Dec 9, 2005 · Apt 2FL
Close - Heating
Heat related
Oct 24, 2005 · Apt 1A
Close - Plumbing
Radiator
Oct 23, 2005 · Apt 2FL
Close - Plumbing
Toilet
Oct 23, 2005 · Apt 2FL
Close - Plumbing
Bathtub/shower
Oct 23, 2005 · Apt 2FL
Close - Heating
Heat related
Oct 23, 2005 · Apt 2FL
Close - Heating
Heat related
Oct 23, 2005 · Apt 1A
Close - Plumbing
Toilet
Oct 3, 2005 · Apt 2
Close - Plumbing
Basin/sink
Oct 3, 2005 · Apt 2
Close - Plumbing
Bathtub/shower
Oct 3, 2005 · Apt 2
Close - Plumbing
Bathtub/shower
Aug 23, 2005 · Apt 2
Close - Plumbing
Toilet
Aug 23, 2005 · Apt 2
Close - Plumbing
Basin/sink
Aug 23, 2005 · Apt 2
Close - Plumbing
Basin/sink
Aug 6, 2005 · Apt SECON
Close - Plumbing
Bathtub/shower
Aug 6, 2005 · Apt SECON
Close - Plumbing
Toilet
Aug 6, 2005 · Apt SECON
Close - Plumbing
Basin/sink
Aug 1, 2005 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1915
- Floors
- 2
- Residential units
- 2
- Building area
- 1,300 ft²
- Lot area
- 1,560 ft²
- Zoning
- R3-2
- Community board
- 413
- Council district
- 27
- Block / lot
- 10880 / 142
- Assessed value
- $38,880
- Landmark / historic district
- No
Questions about 211-34 99 Avenue
Who owns 211-34 99 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Skeete, Marcia.
Does 211-34 99 Avenue have violations?
Yes. NYC HPD has recorded 88 housing violations at this property.
Is 211-34 99 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 211-34 99 Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 211-34 99 Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.