roofy

100-33 205 Street

Queens, NY 11423BBL 4-10872-0052Map

Owner of record: 205 St Buyer INC

100-33 205 Street is a two-family home built in 1925 in Queens, 11423. It has 2 residential units across 2.5 floors. The owner of record is 205 St Buyer INC. HPD has recorded 54 housing violations here, most recently on March 3, 2023. 12 of the 50 most recent violations are still open.

HPD violations
54
DOB violations
0
ECB violations
3
HPD complaints
44

Available now in this building

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Mar 3, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 54

  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling throughout at cellar

    Mar 3, 2023

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric bx cables at ceiling throughout at cellar

    Mar 3, 2023

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Open — Not complied with
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Open — Not complied with
  • B

    Properly repair the broken or defective electric outlet at east wall in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Open — Not complied with
  • B

    Replace with new the broken or defective electric outlet covers at north wall in the 1st room from east at north located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair the broken or defective light fixture at ceiling in the private hallway located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Open — Not complied with
  • B

    Repair the roof so that it will not leak over ceiling in the foyer located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Closed — Violation closed
Show 40 more ↓
  • B

    Replace with new the broken or defective electric outlet at north wall in the 2nd room from east at south located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at south wall in the 2nd room from east at south located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Replace with new the broken or defective sink in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Dec 16, 2022 · Apt 1FL

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 18, 2022

    Closed — Violation dismissed
  • B

    Replace with new the missing entry door knob in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Sep 7, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles floor in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Sep 7, 2022 · Apt 1FL

    Open — Not complied with
  • B

    Repair the leaky and/or defective faucets shower head in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Sep 7, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Replace with new the broken or defective electric outlet cover on north wall in the 2nd room from east at south located at apt 1fl, 1st story, 1st apartment from east at south

    Sep 7, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Sep 7, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Replace with new the broken or defective sink in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Sep 7, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Sep 7, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair the broken or defective electric outlet on north wall in the 2nd room from east at south located at apt 1fl, 1st story, 1st apartment from east at south

    Sep 7, 2022 · Apt 1FL

    Closed — Violation closed
  • A

    Refit entry door in the 2nd room from east at south located at apt 1fl, 1st story, 1st apartment from east at south

    Sep 7, 2022 · Apt 1FL

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the entrance located at apt 1fl, 1st story, 1st apartment from east at south

    Sep 7, 2022 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles floor in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Sep 7, 2022 · Apt 1FL

    Open — Not complied with
  • B

    Properly repair the broken or defective ceiling light fixtures in the private hallway located at apt 1fl, 1st story, 1st apartment from east at south

    Sep 7, 2022 · Apt 1FL

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Aug 30, 2021

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 4th room from east located at apt 1, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the foyer located at apt 1, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approx 1 sq, ft. at east will under sink in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south original violation 14505541 issued 25-aug-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Aug 25, 2021 · Apt 1FL

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt 1, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1

    Closed — Violation dismissed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 1, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the private hallway located at apt 1, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the foyer located at apt 1, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 4th room from east located at apt 1, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from south at west wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1

    Closed — Violation closed
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 1fl, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1FL

    Open — Not complied with
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 1fl, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1FL

    Open — Not complied with
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1fl, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective grout around bathtub in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1FL

    Closed — Violation closed
  • B

    Repair the leaky and/or defective water supply pipe shower head in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1FL

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approx 1 sq, ft. at east will under sink in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1FL

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in at sink in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Aug 25, 2021 · Apt 1FL

    Closed — Violation closed
  • I

    The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for cellar (vacate#: 45933)

    Sep 26, 2006

    Open — Not complied with

DOB building violations · 0

No DOB violations on record

ECB violations · 3

  • Hazardous

    Work w/o permit. work noted : @ cellar level erected full height partition for (2) rooms & installed water & waste lines for (3) pc bathrm (toilet, sink, shower) & residential sink. gas line for stove @ kitchen

    Nov 8, 2006

    Resolve
  • Hazardous

    Residence alt. for occupancy as a dwelling for more than the legally approved # of fam. dept. of bldgs records indicate residence is a legal(2) fam. residence is now alt for occupancy as (3) family alteration

    Nov 8, 2006 · Penalty $3,050

    Resolve
  • Hazardous

    Occupancy is contrary to that allowed by the c of o or dob records cellar use changed from storage & ordinary use to an apt. partitions erected w/ kitchen & bathrm facilities installed.

    Sep 21, 2006 · Penalty $800

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Feb 25, 2024 · Apt 1STFLO

    Close
  • Electric

    Power outage

    Apr 12, 2023 · Apt 1FL

    Close
  • Heat/hot water

    Apartment only

    Feb 11, 2023 · Apt 1STFLO

    Close
  • Plumbing

    Water supply

    Dec 27, 2022 · Apt 1STFLO

    Close
  • Plumbing

    Water supply

    Dec 27, 2022 · Apt 1STFLO

    Close
  • Plumbing

    Water supply

    Dec 27, 2022 · Apt 1STFLO

    Close
  • Outside building

    Roofing

    Dec 12, 2022 · Apt 1FL

    Close
  • Door/window

    Door

    Dec 12, 2022 · Apt 1FL

    Close
  • Electric

    Power outage

    Dec 12, 2022 · Apt 1FL

    Close
  • Plumbing

    Toilet

    Dec 12, 2022 · Apt 1FL

    Close
Show 34 more ↓
  • Door/window

    Door

    Dec 12, 2022 · Apt 1FL

    Close
  • Plumbing

    Bathtub/shower

    Dec 12, 2022 · Apt 1FL

    Close
  • Plumbing

    Basin/sink

    Dec 12, 2022 · Apt 1FL

    Close
  • Heat/hot water

    Apartment only

    Nov 11, 2022 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Sep 2, 2022 · Apt 1FL

    Close
  • Door/window

    Door frame

    Sep 2, 2022 · Apt 1FL

    Close
  • Plumbing

    Basin/sink

    Sep 2, 2022 · Apt 1FL

    Close
  • Electric

    No lighting

    Sep 2, 2022 · Apt 1FL

    Close
  • Electric

    Lighting

    Sep 2, 2022 · Apt 1FL

    Close
  • Door/window

    Door

    Sep 2, 2022 · Apt 1FL

    Close
  • Plumbing

    Toilet

    Sep 2, 2022 · Apt 1FL

    Close
  • Water leak

    Slow leak

    Sep 2, 2022 · Apt 1FL

    Close
  • Plumbing

    Water supply

    Sep 2, 2022 · Apt 1FL

    Close
  • Plumbing

    Water supply

    Sep 2, 2022 · Apt 1FL

    Close
  • Plumbing

    Basin/sink

    Aug 23, 2021 · Apt 1FL

    Close
  • Plumbing

    Bathtub/shower

    Aug 23, 2021 · Apt 1FL

    Close
  • Electric

    No lighting

    Aug 23, 2021 · Apt 1FL

    Close
  • General

    Bell/buzzer/intercom

    Aug 23, 2021 · Apt 1FL

    Close
  • Safety

    Smoke detector

    Aug 23, 2021 · Apt 1FL

    Close
  • Plumbing

    Water-leaks

    Sep 19, 2006 · Apt BASE

    Close
  • Nonconst

    Vermin

    Sep 19, 2006 · Apt BASE

    Close
  • Appliance

    Refrigerator

    Sep 19, 2006 · Apt BASE

    Close
  • Plumbing

    Toilet

    Sep 16, 2006 · Apt BSMT

    Close
  • Plumbing

    Basin/sink

    Sep 16, 2006 · Apt BSMT

    Close
  • Plumbing

    Bathtub/shower

    Sep 16, 2006 · Apt BSMT

    Close
  • Appliance

    Refrigerator

    Sep 14, 2006 · Apt BSMT

    Close
  • Nonconst

    Vermin

    Sep 14, 2006 · Apt BSMT

    Close
  • General

    Ceramic-tile

    Sep 14, 2006 · Apt BSMT

    Close
  • Appliance

    Refrigerator

    Sep 9, 2006 · Apt BSMT

    Close
  • Plumbing

    Water-leaks

    Sep 9, 2006 · Apt BSMT

    Close
  • Electric

    Lighting

    Sep 9, 2006 · Apt BSMT

    Close
  • General

    Floor

    Sep 9, 2006 · Apt BSMT

    Close
  • General

    Ceramic-tile

    Sep 9, 2006 · Apt BSMT

    Close
  • Nonconst

    Vermin

    Sep 9, 2006 · Apt BSMT

    Close

Sales history

DatePriceTypeUnits
Apr 17, 2026$660,000Two family dwellings2

Building details

Building type
Two-family home (B3)
Year built
1925
Floors
2.5
Residential units
2
Building area
1,848 ft²
Lot area
3,417 ft²
Zoning
R3A
Community board
412
Council district
27
Block / lot
10872 / 52
Assessed value
$51,360
Landmark / historic district
No

HPD registration #924341, last renewed Nov 19, 2025.

Questions about 100-33 205 Street

Who owns 100-33 205 Street?

The owner of record in NYC Department of City Planning PLUTO data is 205 St Buyer INC.

Does 100-33 205 Street have violations?

Yes. NYC HPD has recorded 54 housing violations at this property.

Is 100-33 205 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 100-33 205 Street built?

City records list 1925 as the year it was built.

How many apartments are in 100-33 205 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.