193-06 99 Avenue
Queens, NY 11423BBL 4-10840-0016Map
Owner of record: Hirakis, Peter
193-06 99 Avenue is a two-family home built in 1920 in Queens, 11423. It has 2 residential units across 2 floors. The owner of record is Hirakis, Peter. HPD has recorded 39 housing violations here, most recently on July 13, 2018. 32 of the 39 most recent violations are still open.
- HPD violations
- 39
- DOB violations
- 1
- ECB violations
- 1
- HPD complaints
- 64
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 39
- BHazardous
Provide an adequate supply of gas to the fixtures .. in the kitchen located at apt 2fl, 2nd story, 1st apartment from east at south
Jul 13, 2018 · Apt 2FL
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story, 1st apartment from east at south
Jul 13, 2018 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt, 1st story
Jul 10, 2018
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt, 2nd story
Jul 10, 2018
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1f, 1st story, 1st apartment from north at east
Jun 6, 2018 · Apt 1F
Open — Second no access to re-inspect violation - BHazardous
Properly secure the loose vanity to the wall in the bathroom located at apt 1f, 1st story, 1st apartment from north at east
Jun 6, 2018 · Apt 1F
Open — Second no access to re-inspect violation - ANon-hazardous
Provide suitable strainer for the drain on the floor at boiler room, section at north
Jun 6, 2018
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in floor drain at boiler room, section at north
Jun 6, 2018
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling through out at cellar
Jun 2, 2016
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective shower head at bathtub in the bathroom located at apt 1r, 1st story
Oct 17, 2008 · Apt 1R
Open — Nov sent out
Show 29 more ↓
- BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1r, 1st story, apartment at west
Sep 21, 2008 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls, ceilings & trims apartment throughout. located at apt 1r, 1st story, apartment at west
Sep 21, 2008 · Apt 1R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... & mildew at walls & ceiling in south bathroom located at apt 1r, 1st story, apartment at west
Sep 21, 2008 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall in south bathroom located at apt 1r, 1st story, apartment at west
Sep 21, 2008 · Apt 1R
Open — Nov sent out - BHazardous
Properly repair the broken or defective windows in the entire apartment located at apt 1r, 1st story, apartment at west
Sep 21, 2008 · Apt 1R
Open — Nov sent out - ANon-hazardous
Refit entrance door at south/east room located at apt 1r, 1st story, apartment at west
Sep 21, 2008 · Apt 1R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... east wall in the 5th room from north at east located at apt 1r, 1st story
May 27, 2008 · Apt 1R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... east and south walls in the 5th room from north at west located at apt 1r, 1st story
May 27, 2008 · Apt 1R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at south wall in the bathroom located at apt 1r, 1st story
May 27, 2008 · Apt 1R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at north wall in the 1st room from north located at apt 1r, 1st story
May 27, 2008 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 1r, 1st story
May 27, 2008 · Apt 1R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak at ceiling in the 2nd room from north located at apt 2fl, 2nd story
Dec 17, 2005 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story
Dec 17, 2005 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story
Apr 8, 2005 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and south wall in the 2nd room from north at west located at apt 2fl, 2nd story
Apr 8, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north at west located at apt 2fl, 2nd story
Apr 8, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches kitchen, bathroom 2nd sty. rear apt.
Dec 27, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed leaks ceiling kitchen 2nd sty. rear apt.
Dec 27, 2002
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling 2nd sty. apt. 2r west room.
Dec 27, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color newell post 1st sty. to 2nd sty. public hall stairs.
Dec 27, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches and mice excreta 1st sty. rear apt. throughout
Dec 27, 2002
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and wall 1st sty. apt. er1 d34598h
Dec 27, 2002
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective electric wall outlet 2nd sty. apt. 2r west room
Oct 31, 2002
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective electric light fixture 2nd sty. apt. 2r ceiling west room
Oct 31, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective mortor lock entrance door to bldg.
Oct 31, 2002
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar throughout
Oct 31, 2002
Open — Nov sent out - BHazardous
Repair the leaky and/or defective water supply pipe ceiling cellar center at west
Oct 31, 2002
Open — Nov sent out - BHazardous
Replace with new the broken or defective electric light wall fixture at 2nd sty. publie hall.
Oct 31, 2002
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 1st story
Oct 29, 2001 · Apt 1F
Open — Nov sent out
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2018
Dob violation - dismissed
ECB violations · 1
- Class - 1
3316.1 pawrtwial stop work order for supported scaffold issued pursuant to 28-207.2 and posted at premises.scaffold is in unsafe condition.notes: observed pipe scaffold 3 bays in height erected at exp #2 and
Nov 15, 2017 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Jul 12, 2018 · Apt BLDG
Close - Appliance
Electric/gas range
Jul 12, 2018 · Apt 2FL
Close - Heat/hot water
Entire building
Jul 12, 2018 · Apt 2FL
Close - General
Mold
Mar 17, 2011 · Apt 1R
Close - Plumbing
Water supply
Feb 16, 2010 · Apt 1R
Close - Plumbing
Basin/sink
Feb 16, 2010 · Apt 1R
Close - Heating
Heat related
Oct 20, 2008 · Apt 1R
Close - Nonconst
Vermin
Oct 16, 2008 · Apt 1R
Close - General
Doors
Oct 16, 2008 · Apt 1R
Close - General
Windows
Oct 16, 2008 · Apt 1R
Close
Show 40 more ↓
- General
Mold
Oct 16, 2008 · Apt 1R
Close - Paint/plaster
Wall
Oct 16, 2008 · Apt 1R
Close - Nonconst
Vermin
Sep 17, 2008 · Apt 1R
Close - Nonconst
Vermin
Sep 17, 2008 · Apt 1R
Close - General
Doors
Sep 17, 2008 · Apt 1R
Close - Nonconst
Rubbish
Sep 17, 2008 · Apt 1R
Close - General
Windows
Sep 17, 2008 · Apt 1R
Close - General
Windows
Sep 17, 2008 · Apt 1R
Close - General
Windows
Sep 17, 2008 · Apt 1R
Close - Paint/plaster
Ceiling
Sep 17, 2008 · Apt 1R
Close - Paint/plaster
Cabinet
Sep 17, 2008 · Apt 1R
Close - General
Mold
Sep 17, 2008 · Apt 1R
Close - General
Windows
Jun 28, 2008 · Apt 1R
Close - General
Cabinet
Jun 28, 2008 · Apt 1R
Close - General
Doors
Jun 28, 2008 · Apt 1R
Close - General
Windows
May 29, 2008 · Apt 1R
Close - Construction
Pavement
May 29, 2008 · Apt 1R
Close - General
Cabinet
May 29, 2008 · Apt 1R
Close - General
Doors
May 29, 2008 · Apt 1R
Close - General
Mold
May 29, 2008 · Apt 1R
Close - General
Mold
May 29, 2008 · Apt 1R
Close - Paint/plaster
Wall
May 29, 2008 · Apt 1R
Close - General
Mold
May 29, 2008 · Apt 1R
Close - Paint/plaster
Wall
May 29, 2008 · Apt 1R
Close - General
Mold
May 20, 2008 · Apt 1R
Close - Paint/plaster
Wall
May 20, 2008 · Apt 1R
Close - General
Windows
Sep 15, 2007 · Apt 1R
Close - General
Windows
Sep 15, 2007 · Apt 1R
Close - General
Mold
Sep 15, 2007 · Apt 1R
Close - Paint/plaster
Wall
Sep 15, 2007 · Apt 1R
Close - General
Mold
Sep 15, 2007 · Apt 1R
Close - General
Doors
Sep 15, 2007 · Apt 1R
Close - Paint/plaster
Ceiling
Sep 15, 2007 · Apt 1R
Close - General
Floor
Sep 15, 2007 · Apt 1R
Close - General
Cabinet
Sep 15, 2007 · Apt 1R
Close - General
Mold
Sep 1, 2007 · Apt 1R
Close - General
Windows
Sep 1, 2007 · Apt 1R
Close - Paint/plaster
Wall
Sep 1, 2007 · Apt 1R
Close - General
Mold
Sep 1, 2007 · Apt 1R
Close - General
Doors
Sep 1, 2007 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 2,600 ft²
- Lot area
- 2,500 ft²
- Zoning
- R3-2
- Community board
- 412
- Council district
- 27
- Block / lot
- 10840 / 16
- Assessed value
- $62,580
- Landmark / historic district
- No
HPD registration #912174, last renewed Jun 12, 2025.
Questions about 193-06 99 Avenue
Who owns 193-06 99 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Hirakis, Peter.
Does 193-06 99 Avenue have violations?
Yes. NYC HPD has recorded 39 housing violations at this property.
Is 193-06 99 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 193-06 99 Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 193-06 99 Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.