97-03 191 Street
Queens, NY 11423BBL 4-10817-0021Map
Owner of record: Chowdhury, Ataul
97-03 191 Street is a walk-up apartment building built in 2006 in Queens, 11423. It has 3 residential units across 3 floors. The owner of record is Chowdhury, Ataul. HPD has recorded 66 housing violations here, most recently on May 12, 2026. 48 of the 50 most recent violations are still open.
- HPD violations
- 66
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 55
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 66
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt apt2, 2nd story, 1st apartment from west at north
May 12, 2026 · Apt APT2
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the 2nd room from north at east located at apt apt2, 2nd story, 1st apartment from west at north
May 12, 2026 · Apt APT2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at east located at apt apt2, 2nd story, 1st apartment from west at north
May 12, 2026 · Apt APT2
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door at public hall, 1st story
May 10, 2026
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt apt2, 2nd story, 1st apartment from west at north
May 10, 2026 · Apt APT2
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 10, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 10, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 10, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 10, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
May 10, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
May 10, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt apt2, 2nd story, 1st apartment from west at north
May 10, 2026 · Apt APT2
Open — Nov sent out - ANon-hazardous
Replace with new the missing glass pane at window at west wall in the 1st room from north at west located at apt apt2, 2nd story, 1st apartment from west at north
May 10, 2026 · Apt APT2
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective door at base cabinets in the kitchen located at apt apt2, 2nd story, 1st apartment from west at north
May 10, 2026 · Apt APT2
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective glass pane at left window sash at sliding window at west wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door frame in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east and west wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Replace the broken or defective water closet in the 2nd bathroom from east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the 2nd bathroom from east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Refit sliding window at north wall in the 2nd bathroom from east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective shower stall door in the 1st bathroom from east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base cabinets at all walls in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch assembly at entrance door in the 2nd room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood countertop at east, north, and south walls in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective rubber gasket at refrigerator in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood window frame at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the 2nd bathroom from east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from north at east located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing hand rails at north and south walls at public hall stairs, 1st story
Dec 20, 2024
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of shoes, household items and etc at public hall stairs, 1st story
Dec 20, 2024
Open — Nov sent out - BHazardous
Replace with new the missing handrails at north and south walls at public hall stairs, 2nd story
Dec 20, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door at public hall, 1st story
Dec 20, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mailbox at building west wall at front areaway, 1st story
Dec 20, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2, 2nd story, 1st apartment from west at north
Dec 20, 2024 · Apt 2
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Non-hazardous
Illegal use in a residential;ambulette van t265058c tlc,two unlicesed cars, 3 unlicensed vans parked at side yard at time of inspection;remedy:discontinue illegal use
Jul 10, 2002 · Penalty $480
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 6, 2026 · Apt 2
Open - General
Cabinet
Oct 6, 2026 · Apt 2
Open - General
Cooking gas
Oct 6, 2026 · Apt 2
Open - Plumbing
Water supply
Sep 10, 2026 · Apt 3
Open - Plumbing
Bathtub/shower
Sep 10, 2026 · Apt 3
Open - General
Cabinet
Sep 10, 2026 · Apt 3
Open - Paint/plaster
Wall
Sep 10, 2026 · Apt 3
Open - Door/window
Window frame
Sep 10, 2026 · Apt 3
Open - Door/window
Door
Sep 10, 2026 · Apt 3
Open - General
Cabinet
May 1, 2026 · Apt APT2
Close
Show 40 more ↓
- Flooring/stairs
Floor
May 1, 2026 · Apt APT2
Close - Paint/plaster
Wall
May 1, 2026 · Apt APT2
Close - Door/window
Window pane
May 1, 2026 · Apt APT2
Close - Paint/plaster
Wall
May 1, 2026 · Apt APT2
Close - Door/window
Door
May 1, 2026 · Apt APT2
Close - Unsanitary condition
Pests
May 1, 2026 · Apt APT2
Close - Water leak
Slow leak
May 1, 2026 · Apt APT2
Close - Heat/hot water
Apartment only
Mar 26, 2026 · Apt 3
Close - General
Cabinet
Dec 4, 2024 · Apt 2
Close - Appliance
Refrigerator
Dec 4, 2024 · Apt 2
Close - Door/window
Window frame
Dec 4, 2024 · Apt 2
Close - Paint/plaster
Ceiling
Dec 4, 2024 · Apt 2
Close - Door/window
Window frame
Dec 4, 2024 · Apt 2
Close - Flooring/stairs
Floor
Dec 4, 2024 · Apt 2
Close - Flooring/stairs
Floor
Dec 4, 2024 · Apt 2
Close - Appliance
Refrigerator
Nov 26, 2024 · Apt 2
Close - Paint/plaster
Wall
Nov 26, 2024 · Apt 2
Close - Appliance
Electric/gas range
Nov 26, 2024 · Apt 2
Close - Door/window
Door frame
Nov 26, 2024 · Apt 2
Close - General
Cabinet
Nov 26, 2024 · Apt 2
Close - Paint/plaster
Wall
Nov 26, 2024 · Apt 2
Close - Flooring/stairs
Floor
Nov 26, 2024 · Apt 2
Close - Paint/plaster
Ceiling
Nov 26, 2024 · Apt 2
Close - Unsanitary condition
Pests
Nov 26, 2024 · Apt 2
Close - Water leak
Heavy flow
Nov 26, 2024 · Apt 2
Close - Plumbing
Basin/sink
Jun 17, 2021 · Apt 1
Close - Water leak
Slow leak
Apr 4, 2021 · Apt 1
Close - Water leak
Damp spot
Apr 4, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Apr 3, 2021 · Apt 1
Close - Heat/hot water
Entire building
Mar 10, 2021 · Apt 2FL
Close - Heat/hot water
Apartment only
Mar 8, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Mar 1, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Jan 21, 2021 · Apt 1
Close - Appliance
Electric/gas range
Jan 21, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Jan 18, 2021 · Apt 1
Close - Appliance
Electric/gas range
Jan 18, 2021 · Apt 1
Close - Plumbing
Water-leaks
Feb 6, 2012 · Apt 1FL
Close - Plumbing
Basin/sink
Feb 6, 2012 · Apt 1FL
Close - Plumbing
Toilet
Feb 6, 2012 · Apt 1FL
Close - Nonconst
Vermin
Feb 6, 2012 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2006
- Floors
- 3
- Residential units
- 3
- Building area
- 3,120 ft²
- Lot area
- 2,500 ft²
- Zoning
- R5
- Community board
- 412
- Council district
- 27
- Block / lot
- 10817 / 21
- Assessed value
- $81,780
- Landmark / historic district
- No
HPD registration #428935, last renewed Feb 4, 2025.
Questions about 97-03 191 Street
Who owns 97-03 191 Street?
The owner of record in NYC Department of City Planning PLUTO data is Chowdhury, Ataul.
Does 97-03 191 Street have violations?
Yes. NYC HPD has recorded 66 housing violations at this property.
Is 97-03 191 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 97-03 191 Street built?
City records list 2006 as the year it was built.
How many apartments are in 97-03 191 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.