Violations at 90-01 Braddock Avenue
Queens, NY 11428 · BBL 4-10723-0001 · Back to the property
HPD housing violations
The newest 50 of 106 HPD violations. The city keeps the complete history.
- BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north
Apr 7, 2025 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north
Apr 7, 2025 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective missing shut-off valve handle on radiator, south wall at public hall, 1st story
Mar 10, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 2nd and 3rd story balcony at 2nd stack from south at west at fire escape
Nov 22, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Nov 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective bulkhead door hinges , 3rd story
Nov 22, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at 1st window frame from south at west wall in the 2nd room from east located at apt 3c, 3rd story, 1st apartment from east at south , section ''9015borkel''
Jan 12, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 2nd room from east located at apt 3c, 3rd story, 1st apartment from east at south , section ''9015borkel''
Jan 12, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling and west wall in the foyer located at apt 3c, 3rd story, 1st apartment from east at south , section ''9015borkel''
Jan 12, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the foyer located at apt 3c, 3rd story, 1st apartment from east at south , section ''9015borkel''
Jan 12, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south , section ''9015borkel''
Jan 12, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south , section ''9015borkel''
Jan 12, 2024 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls, ceiling and trim in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south , section ''9015borkel''
Jan 12, 2024 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south , section ''9015borkel''
Jan 12, 2024 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Dec 19, 2023 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Oct 28, 2021 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Oct 28, 2021 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Oct 28, 2021 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at west, the 1st room from north at east, the 1st room from north at west, the kitchen located at apt 3a, 3rd story, 1st apartment from west at north , 2nd section from west at north
Feb 10, 2021 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approx. 32 sq ft at west wall, south wall, baseboard at west wall, 1st window frame from south at west wall in the 3rd room from north at west located at apt 3a, 3rd story, 1st apartment from west at north , 2nd section from west at north
Feb 10, 2021 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approx. 40 sq ft at in the 1st room from north at east located at apt 3a, 3rd story, 1st apartment from west at north , 2nd section from west at north
Feb 10, 2021 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approx. 32 sq ft at west wall, baseboard at west wall, 1st window frame from south at west wall, north wall, ceiling in the 1st room from north at west located at apt 3a, 3rd story, 1st apartment from west at north , 2nd section from west at north
Feb 10, 2021 · Apt 3A
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx. 20 sq ft at east wall, 1st window frame from north at east wall, ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from west at north , 2nd section from west at north
Feb 10, 2021 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the kitchen located at apt 3d, 3rd story, 1st apartment from north at east , section ''90-10'', 1st from east at south
Jan 4, 2021 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 1st room from east at north, the private hallway , the foyer , the kitchen located at apt 3d, 3rd story, 1st apartment from north at east , section ''90-10'', 1st from east at south
Jan 4, 2021 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Jan 4, 2021
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south , section ''90-24''
Jan 4, 2021 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east , section ''90-24''
Jan 4, 2021 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north , section ''90-10'', 1st from east at south
Jan 4, 2021 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north , section ''90-20'', 1st from west at north
Jan 4, 2021 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south , section ''90-20''
Jan 4, 2021 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 3d, 3rd story, 1st apartment from north at east , section ''90-10'', 1st from east at south
Jan 4, 2021 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3d, 3rd story, 1st apartment from north at east , section ''90-10'', 1st from east at south
Jan 4, 2021 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors ... in the entrance located at apt 3d, 3rd story, 1st apartment from north at east , section ''90-10'', 1st from east at south
Jan 4, 2021 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east , section ''90-10''
Jan 4, 2021 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south , section ''90-10'', 1st from east at south
Jan 4, 2021 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west , section ''90-10''
Jan 4, 2021 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Oct 6, 2020
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 3a, 3rd story, 1st apartment from north at east
Sep 27, 2020 · Apt 3A
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 3 story, south1 apt 3c vacate # 155867,effective date 9/15/2020
Sep 14, 2020
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south , section ''90-21 ''
Aug 20, 2020 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south , section ''90-24''
Jun 10, 2020 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south , section ''90-24''
Jun 10, 2020 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Oct 22, 2019 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Oct 22, 2019 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Sep 24, 2019 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Sep 24, 2019 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3a, 3rd story, 1st apartment from south at west
Jun 14, 2019 · Apt 3A
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of rusted bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west
Jun 14, 2019 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration floor to ceiling partition erected creating two rooms obstracting light and ventilation in the 1st room from east at south located at apt 2b, 2nd story, 1st apartment from west at north
Sep 29, 2018 · Apt 2B
Open — Civ14 mailed
DOB building violations
16 DOB violations, newest first.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 27, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 27, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 8, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 21, 1994
Vh*-violation hazardous dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Unsafe buildings none
Ub-unsafe buildings none
Feb 22, 1994
V%*-dob violation - dismissed
ECB violations
6 ECB violations, newest first.
- Class - 1
Failrue to provide unobstructed exit passageway.as noted at time of inspection observed at rear of building a chain link fence without proper egress exit passageway provided.no gate door installed.provide prope
Feb 6, 2022 · Penalty $1,000
Resolve - Class - 1
At courtyard fire escape clear passageway to street obstructed by fence, where no gate., remove obstruction
Feb 4, 2022 · Penalty $312
Resolve - Class - 2
28-116.2.4.2 failed to perform a final inspection for completed work within one year of permit expiration. application 410168848 expired 10-29-08. associated techinical report not signed off, fire stops (27-345
Dec 10, 2009
Resolve - Non-hazardous
26,42. 1986 oil rockmills boiler.
Sep 14, 1999
Resolve - Hazardous
Occupancy contrary to that allowed by teh c of o or building department records cellar changed form storage and ordingary use to anapartment. partitions erected and kitchen and bath facilties have
May 30, 1996
Resolve - Hazardous
Failure to maintain exterior building wall. defect is: west wall and concrete roof of 1 story garages collapsed. remedy: vacate remaining garages immediately remove all loose debris make safe. obtain a letter o
Feb 21, 1994
Resolve