218-13 Jamaica Avenue
Queens, NY 11428BBL 4-10694-0002Map
Owner of record: Jy Jamaica LLC
218-13 Jamaica Avenue is a store building built in 1948 in Queens, 11428. It has 2 residential units across 2 floors. The owner of record is Jy Jamaica LLC. HPD has recorded 29 housing violations here, most recently on March 15, 2009. 29 of the 29 most recent violations are still open.
- HPD violations
- 29
- DOB violations
- 16
- ECB violations
- 2
- HPD complaints
- 72
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 29
- ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 2, 2nd story
Mar 15, 2009 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 2, 2nd story
Mar 15, 2009 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective grout around bathtub in the bathroom located at apt 2, 2nd story
Mar 15, 2009 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective leaky air valve at radiator in the 1st room from north located at apt 2, 2nd story
Mar 15, 2009 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed wire at north wall at closet in the private hallway located at apt 2, 2nd story
Feb 3, 2009 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed wire at ceiling and walls in the kitchen located at apt 2, 2nd story
Feb 3, 2009 · Apt 2
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at apt 2, 2nd story
Feb 3, 2009 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing cabinet at west wall in the kitchen located at apt 2, 2nd story
Feb 3, 2009 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing door in the 4th room from north at west located at apt 2, 2nd story
Feb 3, 2009 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 2, 2nd story
Feb 3, 2009 · Apt 2
Open — Nov sent out
Show 19 more ↓
- BHazardous
Properly repair with similar material the broken or defective ceramic tile at walls in the bathroom located at apt 2, 2nd story
Feb 3, 2009 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2, 2nd story
Feb 3, 2009 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective sky light in the bathroom located at apt 2, 2nd story
Feb 3, 2009 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed wire at ceiling in the 3rd room from north at east located at apt 2, 2nd story
Feb 3, 2009 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing ceiling light fixture in the 3rd room from north at east located at apt 2, 2nd story
Feb 3, 2009 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective ***skylight.*** in the entire apartment located at apt 2nd, 2nd story
Jan 30, 2009 · Apt 2ND
Open — Invalid certification - ANon-hazardous
Refit ***the entrance door.*** in the foyer located at apt 2nd, 2nd story
Jan 30, 2009 · Apt 2ND
Open — Nov sent out - BHazardous
Abate the nuisance consisting of ***exposed electrical wire,north wall at ceiling closet.*** in the private hallway located at apt 2nd, 2nd story
Jan 30, 2009 · Apt 2ND
Open — Invalid certification - BHazardous
Abate the nuisance consisting of ***exposed electrical wire,the ceiling.*** in the 5th room from east at north located at apt 2nd, 2nd story
Jan 30, 2009 · Apt 2ND
Open — Invalid certification - BHazardous
Replace with new the missing ***electrical ceiling light fixture.*** in the 5th room from east at north located at apt 2nd, 2nd story
Jan 30, 2009 · Apt 2ND
Open — Invalid certification - BHazardous
Abate the nuisance consisting of ***electrical extension strung throughout .*** in the kitchen located at apt 2nd, 2nd story
Jan 30, 2009 · Apt 2ND
Open — Invalid certification - BHazardous
Replace with new the broken or defective ***skylight.*** in the bathroom located at apt 2nd, 2nd story
Jan 30, 2009 · Apt 2ND
Open — Invalid certification - BHazardous
Replace with new the broken or defective **locking assembly,at entrance door.*** in the entire apartment located at apt 2nd, 2nd story
Jan 30, 2009 · Apt 2ND
Open — Invalid certification - BHazardous
Replace with new the missing ceiling light fixture at south room located at apt 2nd, 2nd story
Dec 9, 2008 · Apt 2ND
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water at bathroom & kitchen fixtures, temperature-135f. located at apt 2nd, 2nd story
Dec 9, 2008 · Apt 2ND
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wiring at north wall in closet private hallway. located at apt 2nd, 2nd story
Dec 9, 2008 · Apt 2ND
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires at private hall closet north wall located at apt 2nd, 2nd story
Nov 20, 2008 · Apt 2ND
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
May 14, 2007 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed ceiling leak rear east room 2nd sty. apt. d20108.
Jun 18, 2002
Open — Nov sent out
DOB building violations · 16
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
Show 6 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
ECB violations · 2
- Class - 2
Manual reset low water cutoff inwrong position,no support on flue pipe correct all violating conditions and submit a certificate of correction
Aug 1, 2023 · Penalty $625
Resolve - Class - 2
Manual reset low water cut off in wrong position no support on flue pipe correct all violating conditions and submit a certificate of correction
Aug 1, 2023 · Penalty $625
Resolve
Complaints
- Electric
Lighting
Mar 11, 2009 · Apt 2ND
Close - Electric
Wiring
Mar 11, 2009 · Apt 2ND
Close - Electric
Wiring
Mar 11, 2009 · Apt 2ND
Close - Electric
Electric-supply
Mar 11, 2009 · Apt 2ND
Close - Plumbing
Radiator
Feb 20, 2009 · Apt 2
Close - General
Cabinet
Feb 20, 2009 · Apt 2
Close - General
Doors
Feb 20, 2009 · Apt 2
Close - General
Windows
Feb 20, 2009 · Apt 2
Close - Electric
Wiring
Feb 20, 2009 · Apt 2
Close - General
Doors
Feb 20, 2009 · Apt 2
Close
Show 40 more ↓
- Plumbing
Water supply
Feb 20, 2009 · Apt 2
Close - Plumbing
Water supply
Feb 20, 2009 · Apt 2
Close - Plumbing
Bathtub/shower
Feb 20, 2009 · Apt 2
Close - General
Ceramic-tile
Feb 20, 2009 · Apt 2
Close - Plumbing
Toilet
Feb 20, 2009 · Apt 2
Close - Plumbing
Bathtub/shower
Feb 20, 2009 · Apt 2
Close - Electric
Lighting
Feb 20, 2009 · Apt 2
Close - Electric
Lighting
Feb 20, 2009 · Apt 2
Close - Heating
Heat related
Feb 3, 2009 · Apt 2
Close - General
Doors
Jan 29, 2009 · Apt 2
Close - General
Cabinet
Jan 29, 2009 · Apt 2
Close - Plumbing
Toilet
Jan 29, 2009 · Apt 2
Close - Electric
Wiring
Jan 29, 2009 · Apt 2
Close - Plumbing
Water supply
Jan 29, 2009 · Apt 2
Close - Heating
Heat related
Jan 29, 2009 · Apt 2
Close - General
Doors
Jan 22, 2009 · Apt 2ND
Close - General
Windows
Jan 22, 2009 · Apt 2ND
Close - General
Windows
Jan 22, 2009 · Apt 2ND
Close - Electric
Wiring
Jan 22, 2009 · Apt 2ND
Close - Electric
Wiring
Jan 22, 2009 · Apt 2ND
Close - Electric
Wiring
Jan 22, 2009 · Apt 2ND
Close - Heating
Heat related
Jan 22, 2009 · Apt 2ND
Close - Heating
Heat related
Jan 4, 2009 · Apt 2ND
Close - Heating
Heat related
Dec 26, 2008 · Apt 2ND
Close - Heating
Heat related
Dec 18, 2008 · Apt 2ND
Close - Heating
Heat related
Dec 4, 2008 · Apt 2
Close - Electric
Wiring
Dec 4, 2008 · Apt 2ND
Close - Construction
Roof
Dec 4, 2008 · Apt 2ND
Close - Electric
Wiring
Dec 4, 2008 · Apt 2ND
Close - Plumbing
Water supply
Nov 20, 2008 · Apt 2ND
Close - Heating
Heat related
Nov 20, 2008 · Apt 2ND
Close - Appliance
Electric/gas range
Nov 1, 2008 · Apt 2ND
Close - Construction
Roof
Nov 1, 2008 · Apt 2ND
Close - Construction
Roof
Nov 1, 2008 · Apt 2ND
Close - Electric
Lighting
Nov 1, 2008 · Apt 2ND
Close - Electric
Wiring
Nov 1, 2008 · Apt 2ND
Close - Electric
Wiring
Nov 1, 2008 · Apt 2ND
Close - Electric
Wiring
Nov 1, 2008 · Apt 2ND
Close - Electric
Electric-supply
Nov 1, 2008 · Apt 2ND
Close - Electric
Electric-supply
Nov 1, 2008 · Apt 2ND
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1948
- Floors
- 2
- Residential units
- 2
- Building area
- 5,200 ft²
- Lot area
- 3,745 ft²
- Zoning
- C4-2
- Community board
- 413
- Council district
- 23
- Block / lot
- 10694 / 2
- Assessed value
- $349,650
- Landmark / historic district
- No
Questions about 218-13 Jamaica Avenue
Who owns 218-13 Jamaica Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Jy Jamaica LLC.
Does 218-13 Jamaica Avenue have violations?
Yes. NYC HPD has recorded 29 housing violations at this property.
Is 218-13 Jamaica Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 218-13 Jamaica Avenue built?
City records list 1948 as the year it was built.
How many apartments are in 218-13 Jamaica Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.