Violations at 214-35 93 Avenue
Queens, NY 11428 · BBL 4-10628-0080 · Back to the property
HPD housing violations
The newest 50 of 99 HPD violations. The city keeps the complete history.
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story, section at east
Apr 17, 2026
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, section at east
Apr 17, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story, section at east
Apr 17, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges building entrance labelled '92-48' to public hall , 1st story, section at east
Apr 17, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5a, 1st story, 1st apartment from west at north , section at east
Apr 17, 2026 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding the maximum allowable temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 5a, 1st story, 1st apartment from west at north , section at east
Apr 17, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt 5a, 1st story, 1st apartment from west at north
Dec 22, 2025 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures , in the entire apartment located at apt 5a, 1st story, 1st apartment from west at north
Dec 22, 2025 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures , in the entire apartment located at apt 5a, 1st story, 1st apartment from west at north
Dec 22, 2025 · Apt 5A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5a, 1st story, 1st apartment from west at north
Dec 22, 2025 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 1st story, 1st apartment from west at north
Dec 22, 2025 · Apt 5A
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft at east wall in the bathroom located at apt 5a, 1st story, 1st apartment from west at north
Dec 22, 2025 · Apt 5A
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling in the bathroom located at apt 5b, 2nd story, 1st apartment from south at west
Jul 2, 2022 · Apt 5B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north window in the 1st room from north at east located at apt 5b, 2nd story, 1st apartment from south at west
Jul 2, 2022 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at celing in the 1st room from north at east located at apt 5b, 2nd story, 1st apartment from south at west
Jul 2, 2022 · Apt 5B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 5b, 2nd story, 1st apartment from south at west
Jul 2, 2022 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the ceiling at public hall, 2nd story
Jun 25, 2022
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 20 sq ft at all walls and ceiling in the bathroom located at apt 5b, 2nd story, 1st apartment from south at west
Jun 25, 2022 · Apt 5B
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at the ceiling, north and east walls in the foyer located at apt 5b, 2nd story, 1st apartment from south at west
Jun 25, 2022 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at the ceiling in the 1st room from east at north located at apt 5b, 2nd story, 1st apartment from south at west
Jun 25, 2022 · Apt 5B
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 2nd story, 1st apartment from south at west
Jun 25, 2022 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5b, 2nd story, 1st apartment from south at west
Jun 25, 2022 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 3rd room from east located at apt 7b, 2nd story, apartment at east
Jan 13, 2021 · Apt 7B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all walls and ceiling in the entire apartment located at apt 4b, 2nd story, apartment at west
Jan 6, 2021 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the bathroom located at apt 4b, 2nd story, apartment at west
Jan 6, 2021 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall in the 1st room from north at east located at apt 5b, 2nd story, 1st apartment from south at west , section ''92-48 vand''
Dec 28, 2020 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north at east located at apt 5b, 2nd story, 1st apartment from south at west , section ''92-48 vand''
Dec 28, 2020 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 5b, 2nd story, 1st apartment from south at west , section ''92-48 vand''
Dec 28, 2020 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the bathroom located at apt 5b, 2nd story
Nov 28, 2020 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at east located at apt 5b, 2nd story
Nov 28, 2020 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north at east located at apt 5b, 2nd story, section ''92-48''
Nov 28, 2020 · Apt 5B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling & north wall in the bathroom located at apt 4a, 1st story, 1st apartment from west at north
Jul 31, 2020 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the bathroom located at apt 4a, 1st story, 1st apartment from west at north
Jul 31, 2020 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls at public hall, 1st story
Jul 31, 2020
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 7b, 2nd story, apartment at east
Sep 9, 2019 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 7b, 2nd story, apartment at east
Sep 9, 2019 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 3rd room from east located at apt 7b, 2nd story, apartment at east
Sep 9, 2019 · Apt 7B
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Sep 9, 2019
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at celing in the bathroom located at apt 4a, 1st story, 1st apartment from east at south
Sep 4, 2019 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 4a, 1st story, 1st apartment from east at south
Sep 4, 2019 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 4a, 1st story, 1st apartment from west at north
Aug 21, 2019 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4a, 1st story, 1st apartment from west at north
Aug 21, 2019 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze of the bathtub in the bathroom located at apt 7b, 2nd story, apartment at east
Dec 29, 2018 · Apt 7B
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from east located at apt 7b, 2nd story, apartment at east
Dec 29, 2018 · Apt 7B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall in the 3rd room from east located at apt 7b, 2nd story, apartment at east
Dec 29, 2018 · Apt 7B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling ( 1 sq ft ) in the 3rd room from east located at apt 7b, 2nd story, apartment at east
Dec 29, 2018 · Apt 7B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 3rd room from east located at apt 7b, 2nd story, apartment at east
Dec 29, 2018 · Apt 7B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 1st room from east at north located at apt 7b, 2nd story, apartment at east
Dec 29, 2018 · Apt 7B
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak above the ceiling in the 3rd room from east at north located at apt 7b, 2nd story, 1st apartment from north at east
Mar 22, 2018 · Apt 7B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the 3rd room from east at north located at apt 7b, 2nd story, 1st apartment from north at east
Mar 22, 2018 · Apt 7B
Closed — Violation dismissed
DOB building violations
2 DOB violations, newest first.
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed
ECB violations
3 ECB violations, newest first.
- Class - 1
Reissue ecb #3545955j issued 11-01-2019 failure to mainatin buidling in code compliant amnner at time of insepction observed teh corner unit know as 92-49 214 place has loose and falling off siding on the side
Dec 20, 2019
Resolve - Class - 1
Failure to maintain building in code complaint manner.noted:at time ofinspection the corner unit known as 92-49 214 place has loose and falling off siding on the side facing 93rd ave.several pieces missing and
Nov 1, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain exterior walls noted at right side stair well to cellar walls bulgering cracked and loose roots tree at edge of stair well pushing at wall also noted at left side stair well walls cracked
Jul 18, 2008 · Penalty $1,000
Resolve