roofy

Violations at 202-15 Hillside Avenue

Queens, NY 11423 · BBL 4-10533-0001 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

36 DOB violations, newest first.

  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 internal hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 external hgh pressure inspection

    Sep 23, 2024

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2020 internal hgh pressure inspection

    Jun 30, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2019 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2018 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2022 external high pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Construction other optional

    Provide engineers report for stability of parapet wall to [email protected] within 72 hours. 212 393 2127

    Nov 10, 2022

    Dob violation - dismissed
  • Construction other optional

    Structure rendered non compliant-due to fire and firefighting operations brick parapet wall at front of building has been displaced and is bulging out.

    Nov 10, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 1, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 1, 2014

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 30, 2010

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 14, 2008

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 5, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 28, 1993

    Dob violation - dismissed
  • Plumbing none

    Jr

    Apr 16, 1993

    Vw-violation work without permit - active
  • Construction other optional

    C-construction other optional

    Mar 16, 1978

    Dob violation - dismissed

ECB violations

20 ECB violations, newest first.

  • Class - 2

    Failure to comply with commissioner's order to file a certificate of correction with department of building for summons 37025826h., file a certificate of correction

    Nov 13, 2025 · Penalty $1,250

    Active
  • Class - 1

    Failure to comply with the commissioner's order in dob violation vio22-04160, dated 11/20/2022.respondent was required to submit an engineer's report concerning structurally deficient conditions. as of 10/11/20

    Oct 11, 2023 · Penalty $2,530

    Active
  • Class - 2

    Observed on ground floor in hill laundromat replacement of 28 gas commercial dryers all work completed no permits, obtain all permits

    Sep 18, 2023 · Penalty $1,250

    Active
  • Class - 2

    No storage in boiler room, missing fire damper on combustion air intake duct. correct all violating conditions and submit a certificate of correction.

    Jan 6, 2022 · Penalty $310

    Resolve
  • Class - 2

    Failure to provide aproved/accepted plan at jobsite at time of inspection premises under alt 2 job #420587270 at time o finspection no plan provided at jobsiet at the time of inspection job has not been filed f

    Sep 17, 2020 · Penalty $625

    Resolve
  • Class - 2

    Failure to file annual certification that cooling tower 1000004771 hasbeen inspected,tested,and disinfected,and that a maintenance plan has been developed and implemented,by november,1,2016.rem:file annual cert

    Jun 20, 2017 · Penalty $1,000

    Active
  • Class - 2

    B254,50a,50b. fulton v.t. blk,15hp,nb863818,hp,stm gas fd 2000 5 0a-fixed fresh air ventilation for enclosed boiler not traced.install fresh air supply duct with fire dampler for code compliance.50b-eviden

    May 5, 2017 · Penalty $500

    Resolve
  • Class - 3

    Work does not conform to approved construction documents or amendmentsjob #4209616771 dwg dated 10/1/14.noted:2nd floor of 20-23 a2 suite physical & rehabilitation medical office 1-storage (rm) converted to ex

    Feb 2, 2015 · Penalty $500

    Active
  • Class - 2

    Work w/o a permit noted: at commercial space approx 30'x 90' found gutting of interior completed including the removal of existing of interior completed including the removal of existing partition & electrical

    Apr 16, 2010 · Penalty $800

    Resolve
  • Class - 2

    Work w/o a permit. work noted: removed existing stair from 1st flr to cellar & installed approx 4' wide wooden stair w/6" thick supporting wall approx 8'x 12'high. remedy: obtain permit & provide structural wal

    Mar 17, 2010 · Penalty $800

    Resolve
  • Class - 2

    Work w/o a permit. work noted: removed existing stair from 1st flr to cellar & installed approx 3'wide wooden stair w/2 6"x 6" wooden posts attached to 4'long metal plate. remedy: obtain permit & provide struct

    Mar 17, 2010

    Resolve
  • Class - 2

    Work w/o a permit. work noted: removed existing stair from 1st flr to cellar & installed approx 6'wide metal stair w/approx 6"think supporting wall from cellar level to 1st flr joists. remedy: obtain permit &

    Mar 17, 2010 · Penalty $800

    Resolve
  • Class - 1

    Work without a permit noted having removed flooring approx 8 to 10 floor joist creating an opening in floor approx 4'8 to install stairs to bsmt altering floor structural system insufficient sub standard bracin

    Mar 3, 2010 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner noted at exterior westerly retaining wall masonry wall has 1/2" crack from top to bottom of 12' to 15' high wall rem: make site safe repair and/or replace

    Jun 25, 2009

    Resolve
  • Class - 2

    Work does not conform to approved construction documents/amendments for alt 2 job 401975350 (6/17/09) permit exp 7/10/05. noted: at exterior front -"bottle shed" "recycling shelter" not installed & westerly f

    Jun 25, 2009 · Penalty $500

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendment. for alt 2 job #401975350,plan dated 4-13-09 permit expired @7-10-05. noted: at cellar electric panels at north-west not on pla

    May 12, 2009

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments. for alt 2 job #401975350 (7.21.04) permit expired (7.10.05). noted: at 1st fl at rear, westerly side: 1) installed hand sink

    Jan 20, 2009 · Penalty $250

    Resolve
  • Non-hazardous

    50a/50b.fulton v.t. boiler,15 hp,nb 86381,gas,2000.50a) steam pressure gage has a dial range of 0-200 psi.safety valve is set at 150 psi.install a replacement steam pressure gage with a dial range of 0-300 psi.

    Apr 9, 2005 · Penalty $180

    Resolve
  • Non-hazardous

    Iol line improperly installed obstructing free access to the rt side oil line connection to the water heater improper, obstructing free passage on the right side of the boiler

    Apr 3, 2001 · Penalty $800

    Resolve
  • Non-hazardous

    Work w/o a permit.illegal work noted in cellar. parititons erected creating a 3 pc. bathroom (shower not working) there is also an exposed gas line and water lines in main room.remedy:obtian approvals & permits

    Aug 26, 2000 · Penalty $500

    Resolve