Violations at 202-15 Hillside Avenue
Queens, NY 11423 · BBL 4-10533-0001 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
36 DOB violations, newest first.
- High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - active - Construction other optional
Provide engineers report for stability of parapet wall to [email protected] within 72 hours. 212 393 2127
Nov 10, 2022
Dob violation - dismissed - Construction other optional
Structure rendered non compliant-due to fire and firefighting operations brick parapet wall at front of building has been displaced and is bulging out.
Nov 10, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 1, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 30, 2010
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 14, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 5, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed - Plumbing none
Jr
Apr 16, 1993
Vw-violation work without permit - active - Construction other optional
C-construction other optional
Mar 16, 1978
Dob violation - dismissed
ECB violations
20 ECB violations, newest first.
- Class - 2
Failure to comply with commissioner's order to file a certificate of correction with department of building for summons 37025826h., file a certificate of correction
Nov 13, 2025 · Penalty $1,250
Active - Class - 1
Failure to comply with the commissioner's order in dob violation vio22-04160, dated 11/20/2022.respondent was required to submit an engineer's report concerning structurally deficient conditions. as of 10/11/20
Oct 11, 2023 · Penalty $2,530
Active - Class - 2
Observed on ground floor in hill laundromat replacement of 28 gas commercial dryers all work completed no permits, obtain all permits
Sep 18, 2023 · Penalty $1,250
Active - Class - 2
No storage in boiler room, missing fire damper on combustion air intake duct. correct all violating conditions and submit a certificate of correction.
Jan 6, 2022 · Penalty $310
Resolve - Class - 2
Failure to provide aproved/accepted plan at jobsite at time of inspection premises under alt 2 job #420587270 at time o finspection no plan provided at jobsiet at the time of inspection job has not been filed f
Sep 17, 2020 · Penalty $625
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000004771 hasbeen inspected,tested,and disinfected,and that a maintenance plan has been developed and implemented,by november,1,2016.rem:file annual cert
Jun 20, 2017 · Penalty $1,000
Active - Class - 2
B254,50a,50b. fulton v.t. blk,15hp,nb863818,hp,stm gas fd 2000 5 0a-fixed fresh air ventilation for enclosed boiler not traced.install fresh air supply duct with fire dampler for code compliance.50b-eviden
May 5, 2017 · Penalty $500
Resolve - Class - 3
Work does not conform to approved construction documents or amendmentsjob #4209616771 dwg dated 10/1/14.noted:2nd floor of 20-23 a2 suite physical & rehabilitation medical office 1-storage (rm) converted to ex
Feb 2, 2015 · Penalty $500
Active - Class - 2
Work w/o a permit noted: at commercial space approx 30'x 90' found gutting of interior completed including the removal of existing of interior completed including the removal of existing partition & electrical
Apr 16, 2010 · Penalty $800
Resolve - Class - 2
Work w/o a permit. work noted: removed existing stair from 1st flr to cellar & installed approx 4' wide wooden stair w/6" thick supporting wall approx 8'x 12'high. remedy: obtain permit & provide structural wal
Mar 17, 2010 · Penalty $800
Resolve - Class - 2
Work w/o a permit. work noted: removed existing stair from 1st flr to cellar & installed approx 3'wide wooden stair w/2 6"x 6" wooden posts attached to 4'long metal plate. remedy: obtain permit & provide struct
Mar 17, 2010
Resolve - Class - 2
Work w/o a permit. work noted: removed existing stair from 1st flr to cellar & installed approx 6'wide metal stair w/approx 6"think supporting wall from cellar level to 1st flr joists. remedy: obtain permit &
Mar 17, 2010 · Penalty $800
Resolve - Class - 1
Work without a permit noted having removed flooring approx 8 to 10 floor joist creating an opening in floor approx 4'8 to install stairs to bsmt altering floor structural system insufficient sub standard bracin
Mar 3, 2010 · Penalty $1,600
Resolve - Class - 2
Failure to maintain bldg in code compliant manner noted at exterior westerly retaining wall masonry wall has 1/2" crack from top to bottom of 12' to 15' high wall rem: make site safe repair and/or replace
Jun 25, 2009
Resolve - Class - 2
Work does not conform to approved construction documents/amendments for alt 2 job 401975350 (6/17/09) permit exp 7/10/05. noted: at exterior front -"bottle shed" "recycling shelter" not installed & westerly f
Jun 25, 2009 · Penalty $500
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendment. for alt 2 job #401975350,plan dated 4-13-09 permit expired @7-10-05. noted: at cellar electric panels at north-west not on pla
May 12, 2009
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. for alt 2 job #401975350 (7.21.04) permit expired (7.10.05). noted: at 1st fl at rear, westerly side: 1) installed hand sink
Jan 20, 2009 · Penalty $250
Resolve - Non-hazardous
50a/50b.fulton v.t. boiler,15 hp,nb 86381,gas,2000.50a) steam pressure gage has a dial range of 0-200 psi.safety valve is set at 150 psi.install a replacement steam pressure gage with a dial range of 0-300 psi.
Apr 9, 2005 · Penalty $180
Resolve - Non-hazardous
Iol line improperly installed obstructing free access to the rt side oil line connection to the water heater improper, obstructing free passage on the right side of the boiler
Apr 3, 2001 · Penalty $800
Resolve - Non-hazardous
Work w/o a permit.illegal work noted in cellar. parititons erected creating a 3 pc. bathroom (shower not working) there is also an exposed gas line and water lines in main room.remedy:obtian approvals & permits
Aug 26, 2000 · Penalty $500
Resolve