Violations at 199-04 Hillside Avenue
Queens, NY 11423 · BBL 4-10494-0123 · Back to the property
HPD housing violations
The newest 50 of 195 HPD violations. The city keeps the complete history.
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7b, 2nd story, 1st apartment from south at west
Jun 13, 2025 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7a, 1st story, 1st apartment from south at west
Jun 13, 2025 · Apt 7A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch assembly on door in the entrance located at apt 6a, 1st story, 2nd apartment from east at south
Jun 6, 2025 · Apt 6A
Open — Not complied with - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartment located at apt 8a, 1st story, 1st apartment from south at west
Jun 6, 2025 · Apt 8A
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of uncapped gas line in the kitchen located at apt 8a, 1st story, 1st apartment from south at west
Jun 6, 2025 · Apt 8A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges boiler room entrance at cellar
Jun 6, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges cellar entrance from east yard at cellar
Jun 6, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ceiling cellar rear at cellar
Jun 6, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material ceiling cellar center at cellar
Jun 6, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material ceiling cellar front at cellar
Jun 6, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling cellar rear at cellar
Jun 6, 2025
Open — Certification postponment denied - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the entrance located at apt 6a, 1st story
May 9, 2025 · Apt 6A
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6a, 1st story
May 9, 2025 · Apt 6A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 6a, 1st story, 2nd apartment from east at south
Dec 27, 2024 · Apt 6A
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6a, 1st story, 2nd apartment from east at south
Dec 27, 2024 · Apt 6A
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6a, 1st story, 2nd apartment from east at south
Dec 27, 2024 · Apt 6A
Open — Not complied with - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock set on vestibule door , 1st story
Nov 29, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed on vestibule door , 1st story
Nov 29, 2024
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 1 sq ft east wall at closet in the kitchen located at apt 6a, 1st story, 1st apartment from east at south original violation 16954633 issued 04-may-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
May 4, 2024 · Apt 6A
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... approx 1 sq ft at north wall in the 1st bathroom from east located at apt 6a, 1st story, 1st apartment from north at east original violation 16954619 issued 04-may-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
May 4, 2024 · Apt 6A
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6a, 1st story, 1st apartment from east at south
May 4, 2024 · Apt 6A
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling at closet in the kitchen located at apt 6a, 1st story, 1st apartment from east at south
May 4, 2024 · Apt 6A
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 1 sq ft east wall at closet in the kitchen located at apt 6a, 1st story, 1st apartment from east at south
May 4, 2024 · Apt 6A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 6a, 1st story, 1st apartment from east at south
May 4, 2024 · Apt 6A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 6a, 1st story, 1st apartment from east at south
May 4, 2024 · Apt 6A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective uneven vynil tiels at floor in the kitchen located at apt 6a, 1st story, 1st apartment from east at south
May 4, 2024 · Apt 6A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all wall and ceiling in the 1st bathroom from east located at apt 6a, 1st story, 1st apartment from north at east
May 4, 2024 · Apt 6A
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 1 sq ft at north wall in the 1st bathroom from east located at apt 6a, 1st story, 1st apartment from north at east
May 4, 2024 · Apt 6A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the 1st bathroom from east located at apt 6a, 1st story, 1st apartment from north at east
May 4, 2024 · Apt 6A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at enterance door in the foyer located at apt 6a, 1st story, 2nd apartment from north at east
Apr 5, 2024 · Apt 6A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6a, 1st story, 2nd apartment from north at east
Apr 5, 2024 · Apt 6A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). in the entire apartment located at apt 6a, 1st story, 2nd apartment from north at east
Apr 5, 2024 · Apt 6A
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bath tub in the bathroom located at apt 6a, 1st story, 2nd apartment from north at east
Apr 5, 2024 · Apt 6A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 6a, 1st story, 2nd apartment from north at east
Apr 5, 2024 · Apt 6A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vynl floor in the 1st room from north located at apt 6a, 1st story, 2nd apartment from north at east
Apr 5, 2024 · Apt 6A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 6a, 1st story, 2nd apartment from north at east
Apr 5, 2024 · Apt 6A
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 6a, 1st story, 2nd apartment from north at east
Apr 5, 2024 · Apt 6A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 6a, 2nd story
Feb 29, 2020 · Apt 6A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 6a, 2nd story
Feb 29, 2020 · Apt 6A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water kitchen and bathroom located at apt 6a, 1st story, 2nd apartment from east at south
Feb 29, 2020 · Apt 6A
Closed — Violation dismissed - BHazardous
Replace or repair the self-closing doors that is missing or defective ..... in the entrance located at apt 5a, 1st story
May 9, 2019 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls aand ceilings in the kitchen located at apt 5a, 1st story, 1st apartment from east at south
Feb 27, 2019 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 2nd room from north at east located at apt 5a, 1st story, 1st apartment from east at south
Feb 27, 2019 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 5a, 1st story, 1st apartment from east at south
Feb 27, 2019 · Apt 5A
Closed — Violation closed - BHazardous
Replace with new the broken or defective base cabinet at sink in the kitchen located at apt 5a, 1st story, 1st apartment from east at south
Feb 27, 2019 · Apt 5A
Closed — Violation closed - BHazardous
Replace the broken or defective sink in the kitchen located at apt 5a, 1st story, 1st apartment from east at south
Feb 27, 2019 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 5a, 1st story, 1st apartment from east at south
Feb 27, 2019 · Apt 5A
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste line to washbasin in the bathroom located at apt 5a, 1st story, 1st apartment from east at south
Feb 27, 2019 · Apt 5A
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at west wall (10 square feet) in the kitchen located at apt 5a, 1st story, 1st apartment from east at south
Feb 27, 2019 · Apt 5A
Open — Defect letter issued - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 5, 2017
Closed — Violation dismissed
DOB building violations
No DOB violations on record
ECB violations
2 ECB violations, newest first.
- Class - 2
36,21b,50,15. (36)found weil mclain model 88 steam boiler not registered. (50a)flue pipe wrong material. (50b)no clean out on chimney base. (50c)storage in boiler room. register the boiler & correct all violati
Dec 16, 2016 · Penalty $500
Resolve - Class - 3
Work w/o a permit. work noted at cellar level erected full height partitions to subdivide cellar right & left. also created 1 room. remedy: obtain permit or restore to prior legal condition.
Jul 2, 2009 · Penalty $200
Resolve