Violations at 88-19 199 Street
Queens, NY 11423 · BBL 4-10494-0118 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
2 DOB violations, newest first.
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 5, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 7, 2011
Dob violation - dismissed
ECB violations
22 ECB violations, newest first.
- Class - 3
Pc1101.2 where req'd all roofs,paved areas,yards,courts & court yards shall drain into a seperate storm sewer system or a combined sewer system or to an apprv'd place of disposal. noted @time of insp @rightside
May 27, 2014
Resolve - Class - 2
Failure to maintain bldg wall(s)or appurtenances.noted a right side(exp.#4)second fl roof approx.15' of drainage gutter broken/missing.rem:replace missing gutter
May 9, 2014
Resolve - Class - 1
Filed a c/c or other related materials containing material false statement(s). respondent filed a c/c which was approved on 1.29.13 for nov #34988372p. upon inspection, found that the condition which respondent
Mar 9, 2013 · Penalty $4,800
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob. respondent failed to comply w/the commissioner's order to correct the vio condition & file a c/c pursuant to sec.28-204.2 for nov #34988372p
Mar 9, 2013 · Penalty $800
Resolve - Class - 3
Sec. zr 23-451. failure to comply w/the zoning resolution front yard planting requirement. note: premises located r3-2 zoning w/25% of front yard (30' wide lot) to be left open planting area. observed: front
Mar 9, 2013 · Penalty $500
Resolve - Class - 3
Sec. zr 23-451. failure to comply w/zoning resolutions front yard planting requirement. observed at time of inspection premises installed new concrete paving at front yard and leaving only 15% planting area.
Dec 21, 2012
Resolve - Class - 3
Sec pc 1101.2 ll 103-1989. failure to maintain storm drainage. noted: observed at time of inspection at front area of the bldg the roof leader was not connected w/drywell, sewer line or directed into planting
Dec 21, 2012
Resolve - Class - 3
1101.2 & 103-1989:failure to maintain storm drainage. noted:observed at time of inspection at front side the roof leaders to be disconnected& at bottom side not connected with drywell sewer line or directed to
Jan 13, 2012 · Penalty $500
Resolve - Class - 2
Violation of parking regulations in a residential district. noted:observed at time of inspection dead storage of 1 vehicle place on the driveway without plates. premises is on "r3-2" residential district & no s
Jan 13, 2012 · Penalty $4,000
Resolve - Class - 3
Failure to maintain storm drainage noted:observed @ time of insp @ rear side of the premises no gutters/leaders installed @ the garage roof, & the rainwater run off into adjacent property of 88-23 119st.
Jul 29, 2011 · Penalty $500
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. at time of inspection i did observed fuel not stored property & no fire extinguishers in place while gasoline powered equipment
Jun 10, 2011 · Penalty $1,200
Resolve - Class - 3
Sec. 26-229a;3304.7 failure to provide adequate egress from excavationat time of inspection i did observe at excavation an inadequate ladder being used as the only means of egress. remedy: provide adequate
Jun 10, 2011
Resolve - Class - 3
Sec. 27-1009a;3303.2.4 failure to provide requires temp or permanent (sanitary)facility during construction or demo operations. at time of insp no sanitary facility on site. (lock) remedy: comply w/notice of
Jun 10, 2011
Resolve - Class - 3
Bc3304.4.4)failure to provide 3'6"guardrails or solid enclosure around open & accessible sides of excavation.@ time of insp i did observe an excavation more than 5'in depth w/o guardrails.rem:comply w/ nov.
Jun 10, 2011
Resolve - Class - 1
Failure to provide protection @ site of excavation.@ time of inspec i did observe @ exp#3 an excavation more than 5'deep sheer cuts.no protection.rem:provide protection.
Jun 10, 2011 · Penalty $2,400
Resolve - Class - 3
Failure to perform inspec & document condition of existing structures adjoining a construction on demo site in a preconstruction survey.@ time of inspec no survey has been performed.rem:perform pre-construction
Jun 10, 2011
Resolve - Class - 3
Bc3309.6)failure to monitor adjoining structures for movement in all directions during excavation related activity that may adversely affect adjoining operations.@ time of inspec i did observe an excavation mor
Jun 10, 2011
Resolve - Class - 3
Bc3301.9.1)failure to provide a sign w/ the wording "to anonymously report unsafe conditions @ this work site that endanger workers call 311"@ new blding/demo site.no sign posted @ time of inspec.rem:comply w/
Jun 10, 2011
Resolve - Class - 3
Bc3304.3.1)failure to notify dob within 28-48 hrs of the start of excavation.@ time of inspec no rule 52 notification made.rem:officially notify dob by calling 212-227-4416 & obtain conformation number.
Jun 10, 2011
Resolve - Class - 3
Bc3307.7)failure to provide an adeqaute construction fence.@ time of inspec i did observe no adequate construction fence @ all exp & gates that open outward to street.rem:comply w/ nov.
Jun 10, 2011
Resolve - Class - 2
Failure to provide approved/accepted plans @ job site @ time of inspec.@ time of inspec no plans on site for job.noted:pursuant to 28-207.2 of a/c of nyc you are hereby ordered to immediately stop all work @ ab
Jun 10, 2011
Resolve - Non-hazardous
Work without a permit work noted erected at the rear of the property an extersion on the garage approx 20'x 20'x 10'h from a 1 car to a 2 car garage .remedy:obtain a permit or restore to prior legal condition
Oct 4, 2004 · Penalty $500
Resolve