90-23 198 Street
Queens, NY 11423BBL 4-10481-0025Map
Owner of record: Sherlock, Barrington Jr
90-23 198 Street is a walk-up apartment building built in 1943 in Queens, 11423. It has 4 residential units across 2 floors. The owner of record is Sherlock, Barrington Jr. HPD has recorded 57 housing violations here, most recently on May 7, 2026. 38 of the 50 most recent violations are still open.
- HPD violations
- 57
- DOB violations
- 1
- ECB violations
- 1
- HPD complaints
- 87
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 57
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 15, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 21, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Nov 21, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ''missing'' at public hall, 1st story
Nov 21, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 21, 2018
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 21, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2018
Closed — Violation dismissed
Show 40 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 5, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 27, 2015
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jan 14, 2005
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass at windows at cellar north court
Oct 23, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cement paving at north court
Oct 23, 2004
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear court
Oct 23, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , south wall in the bathroom located at apt 2r, 1st story, apartment at east
Sep 9, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , north wall in the 3rd room from east located at apt 2r, 1st story, apartment at east
Sep 9, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , 1st door from east at south wall, ceiling in the 2nd room from east located at apt 2r, 1st story, apartment at east
Sep 9, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , 1st window sash from north at east wall in the 1st room from east located at apt 2r, 1st story, apartment at east
Sep 9, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , east wall, north wall in the kitchen located at apt 2r, 1st story, apartment at east
Sep 9, 2004 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .. ceiling in the 2nd room from east located at apt 2r, 1st story, apartment at east
Sep 3, 2004 · Apt 2R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of water stain ceiling ceiling in the 2nd room from east located at apt 2r, 1st story, apartment at east
Sep 3, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass upper sash east window in the 1st room from east located at apt 2r, 1st story, apartment at east
Sep 3, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the broken or defective as to make operable the north window in the 1st room from east located at apt 2r, 1st story, apartment at east
Sep 3, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2r, 1st story, apartment at east
Sep 3, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector which is defective in the entire apartment located at apt 2r, 1st story, apartment at east
Sep 3, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2r, 1st story, apartment at east
Sep 3, 2004 · Apt 2R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of exposed electric wires in the closet in the private hallway located at apt 2r, 1st story, apartment at east
Sep 3, 2004 · Apt 2R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1, 1st story, apartment at west
Sep 3, 2004 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective paving at north side yard of building
Sep 3, 2004
Open — Nov sent out - BHazardous
Replace with new the broken or defective the top and bottom sash all windows throughout apt. in the entire apartment located at apt 1f, 1st story
Jun 16, 2004 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair the broken or defective the wood floor at radiator in the east bed room located at apt 1f, 1st story
Jun 16, 2004 · Apt 1F
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2, 1st story
May 26, 2004 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the smoke detector which is defective in the entire apartment located at apt 2, 1st story
May 26, 2004 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass top window sash in the 1st bedroom from east located at apt 2, 1st story
May 26, 2004 · Apt 2
Open — Nov sent out - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk. at front areaway
May 26, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective door entrance to building , 1st story
Feb 19, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1f, 1st story, apartment at west
Feb 19, 2004 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room, cellar
Feb 19, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire proofing material at cellar center at open space, cellar
Dec 27, 2000
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling cellar thruout.
May 12, 1994
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance to 2 sty rear apt 4r. , section '' ''
Jan 24, 1991 · Apt 4R
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance to 1 sty front apt 1. , section '' ''
Feb 14, 1989 · Apt 1
Open — Nov sent out - BHazardous
D26-10.01 adm code replace with new the broken or defective glass of windows center of cellar at south.
Jul 13, 1988
Open — Nov sent out - BHazardous
Replace with new the missing screen under & above skylight 2 sty pub hall.
Jul 13, 1988
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard.
Jul 13, 1988
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of cellar windows boarded up thruout.
Jul 13, 1988
Open — Nov sent out
DOB building violations · 1
- Construction other optional
C-construction other optional
Oct 4, 2011
Dob violation - active
ECB violations · 1
- Non-hazardous
Failure to maintain.noted defect:plastic buckets,lumber,furniture,windows,concrete blocks,misc household rubbish spread through out side/rear yards.noted location:north/east yards.remedy:remove debris/maintai p
Dec 6, 2004 · Penalty $350
Active
Complaints
- Heat/hot water
Entire building
Nov 17, 2018 · Apt 3
Close - Safety
Window guard broken/missing
Nov 9, 2016 · Apt 4
Close - Electric
Lighting
Jul 17, 2008 · Apt 1A
Close - Plumbing
Basin/sink
Jul 17, 2008 · Apt 1A
Close - Electric
Electric-supply
Jul 17, 2008 · Apt 1A
Close - Plumbing
Basin/sink
Jul 15, 2008 · Apt 1A
Close - Electric
Wiring
Jul 15, 2008 · Apt 1A
Close - Heating
Heat related
Dec 2, 2007 · Apt 4
Close - Heating
Heat related
Apr 1, 2007 · Apt 4
Close - Heating
Heat related
Mar 26, 2007 · Apt 4
Close
Show 40 more ↓
- Heating
Heat related
Mar 25, 2007 · Apt 4
Close - Heating
Heat related
Mar 7, 2007 · Apt 4
Close - Heating
Heat related
Dec 8, 2005 · Apt 2FR
Close - Plumbing
Basin/sink
Dec 1, 2005 · Apt 2
Close - Plumbing
Bathtub/shower
Dec 1, 2005 · Apt 2
Close - Heating
Heat related
Nov 29, 2005 · Apt BLDG
Close - Plumbing
Radiator
Nov 24, 2005 · Apt 2FR
Close - Plumbing
Radiator
Nov 24, 2005 · Apt 2FR
Close - Plumbing
Radiator
Nov 24, 2005 · Apt 2FR
Close - Paint/plaster
Ceiling
Oct 18, 2005 · Apt 2FR
Close - Nonconst
Vermin
Oct 18, 2005 · Apt 2FR
Close - Electric
Electric-supply
Oct 17, 2005 · Apt 2FR
Close - Plumbing
Water supply
Nov 23, 2004 · Apt 4
Close - Plumbing
Water supply
Nov 23, 2004 · Apt 4
Close - Plumbing
Toilet
Nov 23, 2004 · Apt 4
Close - Appliance
Refrigerator
Oct 29, 2004 · Apt 2R
Close - Appliance
Electric/gas range
Oct 29, 2004 · Apt 2R
Close - Heating
Heat related
Oct 29, 2004 · Apt 2R
Close - Heating
Heat related
Oct 27, 2004 · Apt 2R
Close - Electric
Electric-supply
Oct 27, 2004 · Apt 2R
Close - Electric
Electric-supply
Oct 27, 2004 · Apt 2R
Close - General
Ceramic-tile
Oct 27, 2004 · Apt 2R
Close - General
Ceramic-tile
Oct 27, 2004 · Apt 2R
Close - Electric
Electric-supply
Oct 27, 2004 · Apt 2R
Close - Heating
Heat related
Oct 23, 2004 · Apt 1
Close - Heating
Heat related
Oct 22, 2004 · Apt 1
Close - Heating
Heat related
Oct 19, 2004 · Apt 1FLR
Close - Heating
Heat related
Oct 7, 2004 · Apt 1
Close - Heating
Heat related
Oct 6, 2004 · Apt 2R
Close - Nonconst
Illegal
Oct 6, 2004 · Apt BLDG
Close - Appliance
Refrigerator
Sep 15, 2004 · Apt 1
Close - General
Windows
Sep 7, 2004 · Apt 2R
Close - Nonconst
Vermin
Sep 7, 2004 · Apt 2R
Close - Appliance
Electric/gas range
Aug 31, 2004 · Apt 2R
Close - Nonconst
Vermin
Aug 31, 2004 · Apt 1
Close - General
Windows
May 15, 2004 · Apt 2
Close - General
Mold
May 15, 2004 · Apt 2
Close - Nonconst
Vermin
May 15, 2004 · Apt 2
Close - Appliance
Refrigerator
May 15, 2004 · Apt 2
Close - Appliance
Electric/gas range
May 15, 2004 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1943
- Floors
- 2
- Residential units
- 4
- Building area
- 3,192 ft²
- Lot area
- 3,125 ft²
- Zoning
- R4
- Community board
- 412
- Council district
- 23
- Block / lot
- 10481 / 25
- Assessed value
- $213,300
- Landmark / historic district
- No
HPD registration #406955, last renewed Sep 4, 2025.
Questions about 90-23 198 Street
Who owns 90-23 198 Street?
The owner of record in NYC Department of City Planning PLUTO data is Sherlock, Barrington Jr.
Does 90-23 198 Street have violations?
Yes. NYC HPD has recorded 57 housing violations at this property.
Is 90-23 198 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 90-23 198 Street built?
City records list 1943 as the year it was built.
How many apartments are in 90-23 198 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.