roofy

Violations at 107-37 166 Street

Queens, NY 11433 · BBL 4-10170-0023 · Back to the property

HPD housing violations

19 HPD violations, newest first.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 16, 2024

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north

    Dec 23, 2023 · Apt 2C

    Open — Nov certified late
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north

    Dec 23, 2023 · Apt 2C

    Open — Nov certified late
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north

    Dec 23, 2023 · Apt 2C

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north

    Dec 23, 2023 · Apt 2C

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    Replace with new the missing shower head at bathtub in the bathroom located at apt 2c, 2nd story, 3rd apartment from west at north

    Dec 19, 2023 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector defective in the entrance located at apt 2c, 2nd story, 3rd apartment from west at north

    Dec 19, 2023 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entrance located at apt 2c, 2nd story, 3rd apartment from west at north

    Dec 19, 2023 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 3rd apartment from south at west

    Sep 13, 2023 · Apt 1L

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north

    Apr 6, 2023 · Apt 2C

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north

    Apr 6, 2023 · Apt 2C

    Open — Notice of issuance sent to tenant
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 9, 2022

    Closed — Violation dismissed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of excessive heat coming from hot water pipes runing under floor in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north

    Jul 8, 2021 · Apt 1A

    Open — Nov sent out
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 7m, 7th story

    Nov 5, 2020 · Apt 7M

    Closed — Violation dismissed
  • BHazardous

    Properly repair the broken or defective counter balance at lower sash at 2nd window from south in the 2nd room from north at west located at apt 1j, 1st story, 1st apartment from south at west , section at northwest

    Feb 3, 2016 · Apt 1J

    Closed — Violation closed
  • BHazardous

    Properly repair the broken or defective counter balance at lower sash at first window from south in the 2nd room from north at west located at apt 1j, 1st story, 1st apartment from south at west , section at northwest

    Feb 3, 2016 · Apt 1J

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of bedbugs located at apt 1j, 1st story, 1st apartment from south at west , section at northwest

    Feb 3, 2016 · Apt 1J

    Closed — Violation closed
  • BHazardous

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 6h, 6th story, 1st apartment from north at east

    Nov 28, 2011 · Apt 6H

    Open — Nov sent out

DOB building violations

19 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Jun 22, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2021

    Aug 21, 2022

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 19, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 19, 2021

    Dob violation - active
  • Elevator elevatorrequired

    Due to water damage the entire elevator was damage. perform necessary repair and restore elevator back to service , and to dismiss this dob summons you can contact nycdob at [email protected] for a complete inspection. cease use

    Oct 7, 2021

    Dob violation - active
  • Elevator elevatorrequired

    Due to water damage the entire elevator was damaged. perform necessary repair and restore elevator back to service, and to dismiss the dob summons. you can contact nycdob at [email protected] for a complete inspection. cease use

    Oct 7, 2021

    Dob violation - active
  • Elevator elevatorrequired

    Cease use

    Sep 9, 2021

    Dob violation - active
  • Elevator elevatorrequired

    Cease use

    Sep 9, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 6, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 28, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 13, 2018

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 21, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active

ECB violations

16 ECB violations, newest first.

  • Class - 2

    Failure to comply with commissioner's order contained in summons #39040479k issued on 4/30/2021, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable certi

    May 15, 2024 · Penalty $3,125

    Resolve
  • Class - 2

    Repair and restore device back to service. you can contact nycdob at [email protected] for a complete inspection. water in the pit remove water. too much slack in the hoist cables it laying in the opposite

    Jan 8, 2024 · Penalty $3,125

    Active
  • Class - 2

    Repair and restore to service.

    Sep 6, 2022

    Resolve
  • Class - 2

    Permit q00613929-i1-vt expired 10/21/2021 . renew peermit and post

    Apr 11, 2022

    Resolve
  • Class - 2

    Water pump leaking ,combustion air fan runs continous needs to be interlocked with burner,hard pipe gas line to regulator

    Jul 23, 2021 · Penalty $3,125

    Active
  • Class - 2

    Water pump leaking,hard pipe gas line to regulator,inter lock combustion air fan with burner

    Jul 23, 2021 · Penalty $3,125

    Active
  • Class - 2

    Remove debris on top of boiler,leak on header by pumps,hard pipe gas line to regulator cannot .bypass backflow,should not hav exhaust fan in boiler room

    Apr 30, 2021 · Penalty $625

    Active
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a

    Apr 6, 2020

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a

    Apr 6, 2020

    Resolve
  • Class - 2

    Removal of safety measure such as sidewalk sheds w/o dept approval. atthe time of inspeciton building facade was sitll designated as unsafe,the amended facade report (tr6) received on 05-16-18 had not been acc

    May 21, 2018

    Resolve
  • Class - 1

    Failure to take provide safety measures such as sidewalk sheds fence etc where require to protect and secure public safety from documented unsafe facade as per 1rcny 103-04. facade technical report file unsafe

    Mar 14, 2018

    Resolve
  • Non-hazardous

    83x10.restore to service so a complete inspection can be done by this dept.

    Oct 17, 2007

    Resolve
  • Non-hazardous

    83x07. 83x restore to service. call d.o.b. elevator section 212-566-5 539, when restored, so a complete inspection can be made.

    Aug 27, 2007 · Penalty $180

    Active
  • Non-hazardous

    83x07, 83x restore to service-call d.o.b. elevator section, 212-566-5539. when restored, so a complete inspection can be done.

    Aug 27, 2007 · Penalty $180

    Resolve
  • Non-hazardous

    39z09/ 39- water in machine rm.

    Feb 7, 2006

    Resolve
  • Non-hazardous

    39z09. 39- water in machine rm

    Feb 7, 2006

    Resolve