Violations at 107-37 166 Street
Queens, NY 11433 · BBL 4-10170-0023 · Back to the property
HPD housing violations
19 HPD violations, newest first.
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north
Dec 23, 2023 · Apt 2C
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north
Dec 23, 2023 · Apt 2C
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north
Dec 23, 2023 · Apt 2C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north
Dec 23, 2023 · Apt 2C
Open — Notice of issuance sent to tenant - ANon-hazardous
Replace with new the missing shower head at bathtub in the bathroom located at apt 2c, 2nd story, 3rd apartment from west at north
Dec 19, 2023 · Apt 2C
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entrance located at apt 2c, 2nd story, 3rd apartment from west at north
Dec 19, 2023 · Apt 2C
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entrance located at apt 2c, 2nd story, 3rd apartment from west at north
Dec 19, 2023 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 3rd apartment from south at west
Sep 13, 2023 · Apt 1L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north
Apr 6, 2023 · Apt 2C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 3rd apartment from west at north
Apr 6, 2023 · Apt 2C
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of excessive heat coming from hot water pipes runing under floor in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jul 8, 2021 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7m, 7th story
Nov 5, 2020 · Apt 7M
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance at lower sash at 2nd window from south in the 2nd room from north at west located at apt 1j, 1st story, 1st apartment from south at west , section at northwest
Feb 3, 2016 · Apt 1J
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at lower sash at first window from south in the 2nd room from north at west located at apt 1j, 1st story, 1st apartment from south at west , section at northwest
Feb 3, 2016 · Apt 1J
Closed — Violation closed - BHazardous
Abate the nuisance consisting of bedbugs located at apt 1j, 1st story, 1st apartment from south at west , section at northwest
Feb 3, 2016 · Apt 1J
Closed — Violation closed - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 6h, 6th story, 1st apartment from north at east
Nov 28, 2011 · Apt 6H
Open — Nov sent out
DOB building violations
19 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Jun 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2021
Aug 21, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2021
Dob violation - active - Elevator elevatorrequired
Due to water damage the entire elevator was damage. perform necessary repair and restore elevator back to service , and to dismiss this dob summons you can contact nycdob at [email protected] for a complete inspection. cease use
Oct 7, 2021
Dob violation - active - Elevator elevatorrequired
Due to water damage the entire elevator was damaged. perform necessary repair and restore elevator back to service, and to dismiss the dob summons. you can contact nycdob at [email protected] for a complete inspection. cease use
Oct 7, 2021
Dob violation - active - Elevator elevatorrequired
Cease use
Sep 9, 2021
Dob violation - active - Elevator elevatorrequired
Cease use
Sep 9, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 6, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 13, 2018
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Feb 21, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active
ECB violations
16 ECB violations, newest first.
- Class - 2
Failure to comply with commissioner's order contained in summons #39040479k issued on 4/30/2021, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable certi
May 15, 2024 · Penalty $3,125
Resolve - Class - 2
Repair and restore device back to service. you can contact nycdob at [email protected] for a complete inspection. water in the pit remove water. too much slack in the hoist cables it laying in the opposite
Jan 8, 2024 · Penalty $3,125
Active - Class - 2
Repair and restore to service.
Sep 6, 2022
Resolve - Class - 2
Permit q00613929-i1-vt expired 10/21/2021 . renew peermit and post
Apr 11, 2022
Resolve - Class - 2
Water pump leaking ,combustion air fan runs continous needs to be interlocked with burner,hard pipe gas line to regulator
Jul 23, 2021 · Penalty $3,125
Active - Class - 2
Water pump leaking,hard pipe gas line to regulator,inter lock combustion air fan with burner
Jul 23, 2021 · Penalty $3,125
Active - Class - 2
Remove debris on top of boiler,leak on header by pumps,hard pipe gas line to regulator cannot .bypass backflow,should not hav exhaust fan in boiler room
Apr 30, 2021 · Penalty $625
Active - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
Apr 6, 2020
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
Apr 6, 2020
Resolve - Class - 2
Removal of safety measure such as sidewalk sheds w/o dept approval. atthe time of inspeciton building facade was sitll designated as unsafe,the amended facade report (tr6) received on 05-16-18 had not been acc
May 21, 2018
Resolve - Class - 1
Failure to take provide safety measures such as sidewalk sheds fence etc where require to protect and secure public safety from documented unsafe facade as per 1rcny 103-04. facade technical report file unsafe
Mar 14, 2018
Resolve - Non-hazardous
83x10.restore to service so a complete inspection can be done by this dept.
Oct 17, 2007
Resolve - Non-hazardous
83x07. 83x restore to service. call d.o.b. elevator section 212-566-5 539, when restored, so a complete inspection can be made.
Aug 27, 2007 · Penalty $180
Active - Non-hazardous
83x07, 83x restore to service-call d.o.b. elevator section, 212-566-5539. when restored, so a complete inspection can be done.
Aug 27, 2007 · Penalty $180
Resolve - Non-hazardous
39z09/ 39- water in machine rm.
Feb 7, 2006
Resolve - Non-hazardous
39z09. 39- water in machine rm
Feb 7, 2006
Resolve