150-06 Liberty Avenue is a store building built in 1931 in Queens, 11435. It has 2 residential units across 2 floors. The owner of record is Liberty Group Manage. HPD has recorded 27 housing violations here, most recently on November 25, 2025. 23 of the 27 most recent violations are still open.

HPD violations
27
DOB violations
55
ECB violations
7
HPD complaints
59

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Nov 25, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 27

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 25, 2025

    Open — Info nov sent out
  • C

    Properly repair or replace the broken or defective glass at building entrance door at public hall, 1st story

    Jan 10, 2024

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 18, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 17, 2022

    Closed — Violation dismissed
  • C

    Repair the roof so that it will not leak over ceiling in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    May 25, 2018 · Apt 2B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color all ceilings in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    May 25, 2018 · Apt 2B

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak at ceiling in the 3rd room from east located at apt 2b, 2nd story, 1st apartment from south at west

    Apr 4, 2018 · Apt 2B

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective acoustic ceiling tiles in the 3rd room from east located at apt 2b, 2nd story, 1st apartment from south at west

    Apr 4, 2018 · Apt 2B

    Open — Nov sent out
  • A

    Refit all windows upper and lower sashes in the 4th room from east at north located at apt 2b, 2nd story, 1st apartment from south at west

    Apr 4, 2018 · Apt 2B

    Open — Nov sent out
  • A

    Refit all windows upper and lower sashes in the 4th room from east at south located at apt 2b, 2nd story, 1st apartment from south at west

    Apr 4, 2018 · Apt 2B

    Open — Nov sent out
Show 17 more ↓
  • C

    Provide a safe and adequate supply of electric service to the fixtures , in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Apr 4, 2018 · Apt 2B

    Closed — Violation closed
  • C

    Remove the illegal fastening double cylinder key operated lock at metal security door at public hall, 2nd story

    Apr 4, 2018

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color east wall in the kitchen located at apt 2b, 2nd story, apartment at west

    Feb 1, 2018 · Apt 2B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 3rd room from east at north located at apt 2b, 2nd story, apartment at west

    Feb 1, 2018 · Apt 2B

    Open — Nov sent out
  • B

    Properly repair the broken or defective inoperative intercom system in the entrance located at apt 2b, 2nd story, apartment at west

    Feb 1, 2018 · Apt 2B

    Open — Nov sent out
  • B

    Properly repair the broken or defective electric outlet at north wall in the 3rd room from east at north located at apt 2b, 2nd story, apartment at west

    Feb 1, 2018 · Apt 2B

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires & bx cable at north/east corner in the 3rd room from east at north located at apt 2b, 2nd story, apartment at west

    Feb 1, 2018 · Apt 2B

    Open — Nov sent out
  • B

    Properly repair the broken or defective electric outlets at west & south walls in the 3rd room from east at south located at apt 2b, 2nd story, apartment at west

    Feb 1, 2018 · Apt 2B

    Open — Nov sent out
  • C

    Remove the illegal double cylinder key operated locking device at door .. in the entrance located at apt 2b, 2nd story, apartment at west

    Feb 1, 2018 · Apt 2B

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 2b, 2nd story, apartment at west

    Feb 1, 2018 · Apt 2B

    Open — Nov sent out
  • B

    Properly secure the loose ceiling light fixture in the 3rd room from east at north located at apt 2b, 2nd story, apartment at west

    Feb 1, 2018 · Apt 2B

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling in the entire apartment located at apt 2b, 2nd story

    Jul 15, 2016 · Apt 2B

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective celo-tex tiles at ceiling in the 3rd room from east at north located at apt 2b, 2nd story

    Jul 15, 2016 · Apt 2B

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 2nd story

    Aug 3, 2015 · Apt 1A

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1a, 2nd story

    Aug 3, 2015 · Apt 1A

    Open — Nov sent out
  • A

    Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Sep 7, 2007

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1a, 2nd story

    Sep 7, 2007 · Apt 1A

    Open — Nov sent out

DOB building violations · 55

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
Show 40 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed

ECB violations · 7

  • Class - 2

    As per class 2 (b265) 28-303.7 failure to file a complete boiler insp report as per dob records. submit a current b.o.-9 report correct all violating conditions & submit the c of c to dob.

    May 27, 2016 · Penalty $500

    Active
  • Class - 2

    Failure to maintain bldg in code compliant manner.@ the time of inspec i observed raw sewage backing up in the cellar @ the wine & roses lounge.conditions of the sewer back in caused the bldg lounge to be close

    Aug 23, 2012 · Penalty $250

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by the certificate of occupancy#400501051 dated 3/22/96 indicating 2nd fl premissible use 2 dwelling units.presently there are 3 dwelling units 1a,1b,1c.unit ic converted from

    Sep 13, 2007 · Penalty $800

    Resolve
  • Non-hazardous

    Plumbing work without a permit installed 3 pc bathroom, kitchen, water& waste lines for shower and residential sink at 2nd floor unit 1c. remedy: obtain permit if feasible or return to prior legal condition.

    Sep 13, 2007

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by bldg dept rec. from:offices of store on the second fl. to 1 bedroom and 5 bedrooms apt. on the 2nd flremedy:discontinue illegal use of obtain c of o

    Nov 25, 1998

    Resolve
  • Non-hazardous

    Work without a permit-work noted. walls erected at 2nd story creating three class "b" rooms with common kitchen and bath. remedy: obtain permit or restore premises to former legal use.

    Aug 11, 1994 · Penalty $350

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by certificate of occupancy #q 205972 from retail store and office to retail stores-offices and three skorooms at 2nd story. remedy: obtain certificate of occupancy for curren

    Aug 11, 1994 · Penalty $800

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Jan 9, 2024 · Apt 1B2

    Close
  • General

    Cooking gas

    Dec 17, 2022 · Apt B2

    Close
  • Heat/hot water

    Apartment only

    Dec 17, 2022 · Apt B2

    Close
  • Door/window

    Door to dumbwaiter

    Dec 17, 2022 · Apt B2

    Close
  • Safety

    Smoke detector

    Dec 17, 2022 · Apt B2

    Close
  • Safety

    Carbon monoxide detector

    Dec 17, 2022 · Apt B2

    Close
  • Safety

    Window guard broken/missing

    Dec 17, 2022 · Apt B2

    Close
  • General

    Cooking gas

    Dec 17, 2022 · Apt B2

    Close
  • Heat/hot water

    Apartment only

    Dec 17, 2022 · Apt B2

    Close
  • Plumbing

    Radiator

    Dec 17, 2022 · Apt B2

    Close
Show 40 more ↓
  • Appliance

    Electric/gas range

    Dec 13, 2022 · Apt B2

    Close
  • Door/window

    Window frame

    Dec 13, 2022 · Apt B2

    Close
  • Door/window

    Window frame

    Dec 13, 2022 · Apt B2

    Close
  • Heat/hot water

    Apartment only

    Dec 13, 2022 · Apt B2

    Close
  • Heat/hot water

    Apartment only

    Dec 9, 2022 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Feb 27, 2020 · Apt B2

    Close
  • Water leak

    Heavy flow

    May 16, 2018 · Apt 2B

    Close
  • Water leak

    Slow leak

    Mar 7, 2018 · Apt 2B

    Close
  • Door/window

    Window frame

    Jan 30, 2018 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2018 · Apt 2B

    Close
  • General

    Bell/buzzer/intercom

    Jan 30, 2018 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Jan 30, 2018 · Apt 2B

    Close
  • Electric

    Power outage

    Jan 30, 2018 · Apt 2B

    Close
  • Water leak

    Damp spot

    Jan 12, 2018 · Apt 2B

    Close
  • Door/window

    Window frame

    Jan 12, 2018 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Jan 12, 2018 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Jan 12, 2018 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Jan 10, 2018 · Apt 2B

    Close
  • Water leak

    Damp spot

    Jan 10, 2018 · Apt 2B

    Close
  • Appliance

    Electric/gas range

    Jan 10, 2018 · Apt 2B

    Close
  • Door/window

    Window frame

    Jan 10, 2018 · Apt 2B

    Close
  • Appliance

    Electric/gas range

    Jan 10, 2018 · Apt 2B

    Close
  • Appliance

    Electric/gas range

    Jan 10, 2018 · Apt 2B

    Close
  • Appliance

    Electric/gas range

    Jan 10, 2018 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Jan 7, 2018 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Jan 6, 2018 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    Oct 15, 2017 · Apt 1B

    Close
  • Door/window

    Window frame

    Jul 13, 2016 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Jul 13, 2016 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Jul 13, 2016 · Apt 2B

    Close
  • Flooring/stairs

    Floor

    Jul 13, 2016 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Jul 13, 2016 · Apt 2B

    Close
  • Water leak

    Damp spot

    Jul 13, 2016 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Jul 27, 2015 · Apt 1A

    Close
  • Electric

    Wiring

    Aug 6, 2013 · Apt 1B2

    Close
  • Electric

    Wiring

    Aug 6, 2013 · Apt 1B2

    Close
  • Plumbing

    Water-leaks

    Aug 6, 2013 · Apt 1B2

    Close
  • Heating

    Heat related

    Aug 6, 2013 · Apt 1B2

    Close
  • Heating

    Heat related

    Mar 8, 2013 · Apt 1B

    Close
  • Plumbing

    Water supply

    Jan 13, 2008 · Apt 1A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Store building (K4)
Year built
1931
Floors
2
Residential units
2
Building area
6,200 ft²
Lot area
3,133 ft²
Zoning
M1-2A
Community board
412
Council district
28
Block / lot
10110 / 6
Assessed value
$388,350
Landmark / historic district
No

HPD registration #916256, last renewed Sep 26, 2024.

Questions about 150-06 Liberty Avenue

Who owns 150-06 Liberty Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Liberty Group Manage.

Does 150-06 Liberty Avenue have violations?

Yes. NYC HPD has recorded 27 housing violations at this property.

Is 150-06 Liberty Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 150-06 Liberty Avenue built?

City records list 1931 as the year it was built.

How many apartments are in 150-06 Liberty Avenue?

It has 2 residential units and 5 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.