90-75 Sutphin Boulevard
Queens, NY 11435BBL 4-09994-0031Map
Owner of record: 90-75 Sutphin Realty LLC
90-75 Sutphin Boulevard is a hotel built in 1968 in Queens, 11435. The owner of record is 90-75 Sutphin Realty LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 76
- ECB violations
- 72
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 76
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 13, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Plumbing none
Fdny variance letter not provided to the dob
Sep 12, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2015
May 15, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Failure to submit eer none
Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4
Dec 31, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Photoluminescent none
Ll2604-photoluminescent none
Nov 1, 2006
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 8, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2005
Dob violation - resolved
ECB violations · 72
- Class - 2
Failure to maintain parking structure in safe conditions. note: at time of inspection on a parking structure consisting of 1 level below 19 stories bldg, observed spalled concrete, exposed rebars around pipe pe
Apr 30, 2026 · Penalty $1,280
Resolve - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#q0002358 by the august 1, 2024 deadline. to date, the department
Oct 1, 2024 · Penalty $1,250
Resolve - Class - 2
I observed pedestrian protection (sidewalk shed) installed contrary to code. 8ft height requirement not maintained under shed at exposure 1 at bus stop entry/exit & exposure 3 adjoining store fronts (bc 3307.6.
Oct 26, 2023 · Penalty $2,400
Resolve - Class - 2
I observed a sidewalk shed installed at exposure 3 with a active storage/work zone in street. after review of the approved site safety plan work was installed contrary to drawings. missing 4ft wood panels with
Oct 26, 2023
Resolve - Class - 2
Failure to provide corner mirrors where required. upon inspection on at active 19 story construction i observed a fence and sidewalk shed installed at exposure 3 creating blind corners located at both ends due
Oct 26, 2023
Resolve - Class - 2
I observed a sidewalk shed installed at exposure 1&3. upon review of approved drawings, in conclusion the sws at expos 3 was installed contrary to plans. missing horizontal pipe bracing at top of both open span
Aug 31, 2023
Resolve - Class - 1
A worker was hit in the head and was taken to a first med. permit holder job#421171975 failed to submit report within 3 business days of required 16 items to code 28-103.21 per 28-103.21.1 via web form, ll78 of
Jul 10, 2023 · Penalty $5,030
Resolve - Class - 1
Failure to notify dept of accident/incident resulting in fatality or injury.note:worker moving suspended scaffold fell hit face went to hospital dept records permit holder failed to adequately notify dob within
Jun 28, 2022
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments.at time of inspection on an active jobsite,observed roofprotection missing at exp#2 from the roof of the 2 sty adjacent buildi
May 23, 2022
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments.at time of inspection on an active jobsite,observed sidewalk shed erected at exp#1 & 3 under permit#440352413-sh expires 09/13
May 23, 2022
Resolve
Show 40 more ↓
- Class - 2
Work doesnt conform to const doc-suspended scf.note:ato my insp observed active jobsit.responding to complaint that 1worker got injured on his face.worker was working on suspended scf.upon request for suspended
May 12, 2022 · Penalty $620
Resolve - Class - 1
Bc3309.10 failure to provide adj property roof parapet-roof protection.note:ato my insp observed active jobsite bldg exp1&2 covered adj property roof parapet top not protected&also damage conditions.not provide
May 12, 2022 · Penalty $2,500
Resolve - Class - 1
Preshift safty meeting content note:ato my insp responding to incidentthat 1worker got injured on his face.insp reveal that workers was working on suspended scf&suspended scf motor when scf was descending&got s
May 12, 2022
Resolve - Class - 1
Failure to obtain cd5:suspended scf app or expired.note:atoi my insp observed active jobsite.response to incident that 1worker got injured on his face insp reveal that worker working on suspended scf@exp1 outsi
May 12, 2022 · Penalty $5,000
Resolve - Class - 2
Bc3307.6.5.3 responsibility for maintenance&use-pedestrian protection doesnt meet code spec (sws) ato my insp on active jobsite,i observed that permit holder failed to maintain sws which was installed@exp1&3@ab
Dec 15, 2021 · Penalty $625
Resolve - Class - 1
Bc3301.1.2 failure to comply w/fdny fire code-general (expire permit) ato my insp on active jobsite,i observed w/i site on 1fl level 2cages containing gas tanks 1 w/3tanks of acetylene,the other 2 #2 w/4tanks o
Dec 15, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to perform successful hydrostatic pressure test at standpipe sw/em.at time of inspection at an active site with structural steel working deck at 20fl and in excess at 210ft in height.i reviewed approved
Oct 13, 2021 · Penalty $5,000
Resolve - Class - 2
Sec. 3314.8.2 failure to maintain pipe scaffold netting. at time of inspection on an active jobsite,observed pipe scaffold erected approx 80 feet in height at all exposures. observed scaffold debris/safety nett
Nov 12, 2020
Resolve - Class - 2
Failure to provide approveeed plans at jobsite. at time of inspection on an active jobsite,observed new steel erected structure at 12 floors. upon request for structure plans to reflect site steel erection,none
Nov 12, 2020
Resolve - Class - 2
Failure to maintain/display on site drawings/documents required by chapter 33. at time of inspection on an active jobsite,observed makeshiftworking platforms approx 25ft x 8ft & 12ft x 12ft,consisting of planks
Nov 12, 2020
Resolve - Class - 2
Failure to maintain/display on site documents required by chapter 33. at the time of inspection,i observed an active jobsite under alt-1,worker working. i observed supported scaffolding at all exposure & overhe
Mar 6, 2020 · Penalty $1,250
Resolve - Class - 1
Sec. 28-401.4 illegaly enhgaging in any business or occupation w/o required license or other authorization. at the time of my inspection it was observed an construction site w/welding operations at 2nd floor
Mar 6, 2020
Resolve - Class - 1
Sec. 2113.9 failure to extend chimney at least 3 feet above roof. at the time of my inspection it was observed an active construction site w/scaffold at exp#2 where it was noted that adjoining property chimney
Mar 6, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction at the time of inspection,i observed an active job site under alt-1 workers working. upon inspecting roof of the construction,i observed towe
Mar 6, 2020
Resolve - Class - 1
Sec. 3301.2 failure to provide overhead protection. at the time of inspection i observed an active jobdsite under alt-1 worker working. upon walking through the site i observed an exposed concrete yard of an
Mar 6, 2020 · Penalty $2,500
Resolve - Class - 1
Sec. 28-105.12.8 work is not in accordance w/site safety plan. at the time of my inspection on a 15 sty alteration it was observed that at roof of the existing bldg located at sutphin blvd there were 3 cellphon
Mar 6, 2020
Resolve - Class - 2
Sec. 3309.12 failure to protect or adequately protect adjoining equipment-hvac & ventilation vents. at the time of my inspection it was observed & active construction site w/scaffolding at exp#2 where sections
Mar 6, 2020 · Penalty $1,250
Resolve - Class - 2
Pedestrian protection does not meet code specification. at the time ofmy inspection ot was observed that sws installed at exp#3 was not extended 20 feet past lot line over the adjacent 1 sty bldg at 147th place
Mar 6, 2020 · Penalty $2,400
Resolve - Class - 1
Sec. 3301.6 failure to design,size,material,structure of temporary construction. at the time of inspection,i observed an active jobsite under alt-1 worker working. walking through diffrent floor,i oberved a tem
Mar 6, 2020 · Penalty $2,500
Resolve - Class - 1
Plans-work does not conform to approved construction/scaffold documents and/or approved amendments. at time of inspection on an alt 15 storybuilding notice needle beams install at all exposures on the 2nd fl of
Aug 22, 2019 · Penalty $2,500
Resolve - Class - 1
Bc3314.1/supported scaffold not maintained as per code.at time of inspection on an active alt constrution site notice that the supported scaffold on all exposures of the building had missing inadequate safety n
Aug 14, 2019 · Penalty $2,500
Resolve - Class - 1
3309.1:failure to protect or adeqauely protec adjoining properties during construction or demolition operation at time of inspection on an actiev alt construction site n0tice that the roof protection for buildi
Aug 14, 2019 · Penalty $2,500
Resolve - Class - 1
Inadequate housekeeping.at time of inspection on an active alt construction site notice at my inspection that it was early in the morning aroung 8am and on this construction site there were large piles of debri
Aug 14, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain a control access zone.at time of inspection on an active construction site alt build,notice at exposure 1 & 2 corner a set back that had supported scaffold from 2nd flr set back to top of bu
Aug 14, 2019 · Penalty $10,000
Resolve - Class - 1
3310.8:site safety manager fial to perform duties as per code at time of inspection on an actiev alt building in construction phase notice hazardous dangerous conditions that can cause harms to workers fdny ins
Aug 14, 2019
Resolve - Class - 1
Work contrary to site safety plan at time of inspection on an atciev alt construction site notice that work on sit was contrary to what was on the site safety plan the sidewalk shed at expo# 1 on sitphin blvd w
Aug 14, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guardrails.at time of inspection on an active alt constrution site notice the guardrail system at all exposures was missing o
Aug 14, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to maintain/display on site documents required by chapter 33 at time of inspection on an actiev alt construction site after requesting plans for the sidewalk shed i was inform by site safety that plans
Aug 14, 2019 · Penalty $2,500
Resolve - Class - 2
Bc 3301.2 failure to maintain. observed, debris netting on scaffold atexp 1, exp 2, exp 3 was torn, ripped, hanging off scaffold. remedy: maintain netting on scaffold in a code compliant manner
Nov 19, 2018 · Penalty $650
Resolve - Class - 1
Work without a permit.i observed in the cellar area several section ofthe sprinkler system ive been cute and removed without any variance letter from fdny.during demolition..the removal of the sprinkler piping
Jun 4, 2018
Resolve - Class - 2
Work w/out a permit.i observed in the cellar area several section of the sprinkler system i've been cut & removed w/out any approval letter from f.d.n.y.rem:obatin permit.
Jun 4, 2018 · Penalty $625
Resolve - Class - 2
Work does not conform to approved construction documents. noted: construction debris chute located @ 1st flr interior, does not conform to approved plans, steel placement missing or incorrect w/ steel size, & n
Mar 26, 2018
Resolve - Class - 2
97x10- return elevator to service.
Oct 31, 2013
Resolve - Class - 2
97x10- return elevator to service.
Oct 31, 2013
Resolve - Class - 2
97x10- return elevator to service.
Oct 31, 2013
Resolve - Class - 2
97##5 failure to maintain elevator device respondent failed to allow mandatory annual/routine inspection by the dept or approved agency per 28-304.6.1 and appendix k of the building code multiple attempts to ga
Oct 23, 2013
Resolve - Class - 2
97##5 failure to maintain elevator device respondent failed to allow mandatory annual/routine inspection by the dept or approved agency per 28-304.6.1 and appendix k of the building code multiple attempts to ga
Oct 23, 2013
Resolve - Class - 2
97##5 failure to maintain elevator device respondent failed to allow mandatory annual/routine inspection by the dept or approved agency per 28-304.6.1 and appendix k of the building code multiple attempts to ga
Oct 23, 2013
Resolve - Class - 1
Failure to file affidavits and or comply w/ other requirements set forth for photoluminescent exit path marking. remedy: comply w/ requirements of reference standards (rs) 61.
Sep 25, 2008 · Penalty $2,400
Resolve - Non-hazardous
Having installed a sign without a permit. noted: advertising signage was installed on the south side of the building at the 6th floor level.dob records indicate no permits were issued.
May 16, 2006 · Penalty $800
Resolve
Complaints
- Plumbing
Water supply
Dec 26, 2008 · Apt BLDG
Close - Heating
Heat related
Feb 27, 2006 · Apt BLDG
Close - Heating
Heat related
Mar 9, 2005 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 1968
- Floors
- 19
- Residential units
- —
- Building area
- 262,911 ft²
- Lot area
- 17,400 ft²
- Zoning
- C6-4
- Community board
- 412
- Council district
- 27
- Block / lot
- 9994 / 31
- Assessed value
- $9,720,900
- Landmark / historic district
- No
Questions about 90-75 Sutphin Boulevard
Who owns 90-75 Sutphin Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 90-75 Sutphin Realty LLC.
Does 90-75 Sutphin Boulevard have violations?
NYC HPD has no housing violations on record for this property.
Is 90-75 Sutphin Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 90-75 Sutphin Boulevard built?
City records list 1968 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.