144-02 94 Avenue
Queens, NY 11435BBL 4-09993-0001Map
Owner of record: Liverpool Realty LLC
144-02 94 Avenue is a hotel built in 2021 in Queens, 11435. The owner of record is Liverpool Realty LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 6
- ECB violations
- 61
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 6
- Construction other optional
Ftm facade & appurt due to a section of eifs falling & falling on to adjacent bldg roof.remedy:owner to retain svcs of nys reg des prof with qewi cert to inspect & evluate 100% of eits (hands-on sound) at all exps. install/maint pub protection on entire perimeter of bldg file & submit hands-on report to [email protected]
Mar 18, 2026
Dob violation - active - Construction other optional
Ewo due to defective facade.spalling/loose material @ exp3.section of eifs falling to adjacent bldg. remedy:immediately install safe meas @ all eps to prot public,the owner must hire professional engineer to inspect & evaluate the condition & submit report. immediately remove all loose material & file unsafe report
Mar 18, 2026
Dob violation - active - Construction other optional
Intent to revoke approval & permit application #q00318589-i1.
Nov 25, 2025
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Construction other optional
The borough commissioner has ordered all work stopped under permit # 421949574 on the 3/7/2022, due to site safety manager withdrawal.
Mar 7, 2022
Dob violation - dismissed - Construction other optional
The borough commissioner has ordered all work stopped under permit # 421949574 on the 3/7/2022 due to site safety manager withdrawal.
Mar 7, 2022
Dob violation - dismissed
ECB violations · 61
- Class - 1
Failure to maintain exterior building facade and appurtenances. note: at the time of inspection observed missing/loose and spalling eifs. section of eifs failing to an adjacent building at exposure #3. remedy:
Mar 18, 2026 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection of a 15-story new building active job site, i observed the elevator shaft with an inadequate guardrail system, creating a hazard for workers and personnel. stop all work . provide a
Dec 22, 2025 · Penalty $5,030
Resolve - Class - 1
At the time of my inspection of a 15-story building with an active job site, i observed multiple stairways lacking required handrails, creating a hazardous condition for workers and authorized personnel. stop-
Dec 22, 2025 · Penalty $2,530
Resolve - Class - 1
Miscellaneous violations. bc 3301.2. at the time of inspection of a 15-story new building with an active job site. i observed workers performing work within an elevator shaft without required fall protection. t
Dec 22, 2025 · Penalty $5,000
Resolve - Class - 2
15 stories nb inactive jobsite, with a building footprint(41,386 ) sq.ft. , walk jobsite perimeters, knock & called out, i observed no competent watch personnel as per bc 3303.7.7.6 a watchperson requirements o
Dec 21, 2025 · Penalty $2,530
Active - Class - 2
At the time of my inspection of a 15-story new building, piles of combustible and mixed debris were observed at exp# 3 within the job site, creating a potential fire hazard. stop all work. remove debris and mai
Dec 21, 2025
Resolve - Class - 1
Bc3307.2.1at the time of my inspection, the pedestrian walkway was obstructed by falling debris from the sidewalk shed, forcing pedestrians into the roadway and creating a hazard to pedestrians and the public f
Dec 21, 2025 · Penalty $5,030
Resolve - Class - 2
At the time of my inspection of a 15-story building, a sidewalk shed was observed at exp# 1 and 4 in a state of disrepair, with missing protection panels and a fallen panel obstructing the pedestrian walkway, c
Dec 21, 2025 · Penalty $2,430
Resolve - Class - 1
Bc 3314.1, 3314.8 at the time of inspection of a 15-story new building, pipe scaffolding was observed at exp# 1, 3, and 4 with loose planks, missing pins, debris netting with large openings, creating a hazard
Dec 21, 2025 · Penalty $10,000
Active - Class - 2
At time of inspection observed inadequate construction housekeeping throughout the site. no debris container was on site, lots of trash and cardboard boxes creating trip and possible fire hazards by not placing
Nov 28, 2025
Resolve
Show 40 more ↓
- Class - 2
At time of inspection observed a yodock system occupying the roadway at exp 4 w/an expired dot permit. unlawfully occupying the roadways creates hazardous conditions to vehicular traffic & emergency services by
Nov 28, 2025
Resolve - Class - 2
Atoi observed pulley system on the supported scaffold at exp 3 not on the approved scaffold drawings. this creates unsafe conditions with the stability of the scaffold because theres no engineer approval of use
Nov 28, 2025
Resolve - Class - 1
I observed several areas(exp#3,4,and 1) with accumulated combustible material and debris which can cause fire and pest hazards. one area the landing was blocked with piles of material in violation of bc 3303.4
Sep 3, 2025 · Penalty $2,500
Resolve - Class - 2
Bc 3307.2.1 during inspection of a 15 story building with a storage work zone area with a fork lift and barriers in the street, dot records revealed that there were no active permits to occupy the road way as r
Apr 2, 2025 · Penalty $2,500
Resolve - Class - 1
Bc3310.5.1during inspection of an active 15 story building, the site safety manager on the pw2 #m002442 had not been onsite since march 14, 2025 as per daily logs provided. logs dated from march 17- april 2, 20
Apr 2, 2025 · Penalty $5,000
Resolve - Class - 2
3314.1-at time of my weather advisory sweep inspection15story building observed pipe scaffold at all exposure which is apply for alternate safety nettings,upon further observed the netting is loose on multiple
Jan 2, 2025 · Penalty $2,500
Resolve - Class - 2
3314.4.4.12 precautions while working around powerlines. upon inspection of an active 15 story construction site i observed supported scaffold installed at exposure 1 within 10ft of unprotected power lines. sca
Nov 18, 2024 · Penalty $2,500
Resolve - Class - 2
I observed pipe scaffold installed at all exposures and after review of approved drawings it was determined to be installed contrary to plans. no details for base of scaffold at expos 1 using 2ft frames connect
Nov 18, 2024 · Penalty $1,250
Resolve - Class - 2
3314.4.8 maintenance. i observed pipe scaffold installed at all exposures. upon further inspection i observed the scaffold poorly maintained. concrete covered footings at exposure 1. debris build up on the full
Nov 18, 2024 · Penalty $5,000
Resolve - Class - 2
3303.16 worker sheds, contractor sheds, contractor offices, and similar structures. i observed a contractor shed on 1st floor with no smoke detector & automatic sprinkler system or a non-water automatic fire-ex
Nov 18, 2024 · Penalty $5,000
Resolve - Class - 2
Upon inspection of an active 15 story construction site and review of provided dot permit and ssp i observed work contrary to plans. i observed personal vehicles parked inside dot approved street loading zone c
Nov 18, 2024
Resolve - Class - 2
Upon inspection & review of approved drawings of sidewalk shed installed at expos 1&4 it was determined to be installed contrary to plans. cross bracing sequence does not match, approx. 10ft open span in shed f
Nov 18, 2024 · Penalty $1,250
Resolve - Class - 2
I observed pedestrian protection (sidewalk shed) installed contrary to codes: 3307.6.4.4-vertical member at expos 1 placed closer than 18 inches to face of curb. gar/driveway expos 4 not protected from displace
Nov 18, 2024 · Penalty $2,400
Resolve - Class - 2
Upon inspection of an active 15 story nb construction site i observed inadequate housekeeping. several piles of garbage/construction debris, combustible material stored on 1st floor. no containers meeting the r
Nov 18, 2024
Resolve - Class - 2
Upon inspection of an active 15 story construction site i observed a fence constructed/maintained at exposures 1 and 4 contrary to code. portions on fence not painted hunter green. protruding sharp objects (dam
Nov 18, 2024 · Penalty $1,000
Resolve - Class - 2
3307.6.5.5 cleaning. upon inspection of an active 15 story nb construction site i observed a needle beam overhead protection with scaffold installed on stop at expos 2. upon further inspection i observed trash
Nov 18, 2024 · Penalty $2,500
Resolve - Class - 2
At time of my inspection on a active jobsite of a 15 story nb,i observed missing exit signs,no smoking signs. providing signs are detrimental to a safe working enviroment.comply with code
Jul 9, 2024 · Penalty $1,250
Resolve - Class - 1
Bc 3314.4.8 -at time of my inspection on a active jobsite of a 15 story nb, observed suported scaffold at exp#1,2,3,4. the scaffold had lose nettings/not maintain as per code. this creates a hazardous conditi
Jul 9, 2024 · Penalty $5,000
Resolve - Class - 1
At time of my inspection on a active jobsite of a 16 story nb,observed that guardrails are not build as per code-missing cable clamps,lose nettings and 0 cables throughout entire jobsite.this creates a hazardou
Jul 9, 2024 · Penalty $5,000
Resolve - Class - 2
At time of my inspection on active jobsite of 15 story nb (site safety job),observed numerous areas with unsafe extension cables and tools with damaged cords.comply with code
Jul 9, 2024
Resolve - Class - 2
At time of my inspection on a active jobsite of a 15 story nb,observed safety straps installed througout the site, upon request for the log book or documents related to the safety straps, none was available/pr
Jul 9, 2024
Resolve - Class - 2
Reviewed pe drawings supported scaffold indicates one fully planked level to be installed and relocated as needed.observed in field exp1,2,3, and 4, 3fully planked levels work contrary to pe specifications and
May 15, 2024
Resolve - Class - 1
Observe a closed jobsite with supported scaffolding at all exposures. observe debris netting unsecure in multiple areas around scaffolding. referencing 2014 building code (3314.8.2), "such netting shall be secu
Apr 22, 2024 · Penalty $5,000
Resolve - Class - 1
Observe a closed jobsite with supported scaffolding at all exposures. observe debris netting unsecure in multiple areas around scaffolding. referencing 2014 building code (3314.8.2), "such netting shall be secu
Jan 2, 2024 · Penalty $5,000
Resolve - Class - 1
Observe a closed jobsite with a sidewalk shed opening for a tree without any protection. referencing 2014 building code (3309.11), "protection meeting the requirements of the department of parks and recreation
Jan 2, 2024 · Penalty $5,000
Resolve - Class - 1
At time of inspections of a proposed 15 story building with a supported scaffold around the perimeter, i observed that the vertical netting did not completely enclosed the supported scaffold as per code. the la
Aug 10, 2023 · Penalty $2,500
Resolve - Class - 1
At time of inspection of proposed 15 story building with a supported scaffold around the perimeter of the building i requested to see the install and inspection letter for the scaffold, but none was provided. t
Aug 10, 2023 · Penalty $2,500
Resolve - Class - 1
At time of inspection of proposed 15 story building with a sidewalk shed around the perimeter of the building i requested to see the 6 month inspection letter for the shed, but none was provided. the lack of in
Aug 10, 2023 · Penalty $2,500
Resolve - Class - 2
Observed a sidewalk shed in place, w/ site observations defects were observed, non-conforming to approve plans. shed was visually inspected by ssm ruwan a. rajapa and as per 3307.6.5.10.1. defects discovered as
Nov 2, 2022
Resolve - Class - 2
A sidewalk shed in place @ expos 1 &4, upon review of approve plans, to conform w/ site observations, no details were provided for erected section extending 20' over site gate/egress @ exp. 4, and sections miss
Nov 2, 2022 · Penalty $3,125
Resolve - Class - 1
Inspection of a 15 story building at 2 floor level construction work in progress. i observed site safety manager operation in progress, upon review of safety manager log i observed since 08/12 to presence ssm
Oct 11, 2022 · Penalty $2,500
Resolve - Class - 1
Inspection of a 15 story building at 2 floor level construction work in progress. i observed concrete operation in progress, upon review of concrete safety manager log i observed since 10/07 to presence csm248
Oct 11, 2022 · Penalty $2,500
Resolve - Class - 1
Inspection of an 15 story building at secound floor level , observed at exposure one yudock system in place to street level adjacent to sidewalk shed and road.it appear there were no barries in place to enclose
Oct 11, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction. at time of inspection observed no guard railing provided at exposure 1 where open/unprotested space between sws and building. a
Sep 14, 2022 · Penalty $10,000
Resolve - Class - 2
At time of inspection observed sidewalk shed in place,missing caps from the bolts at sws can create hazardous conditon for pedestrion#3307.6.5.6 sharp edgescomply with code
Sep 10, 2022 · Penalty $2,400
Resolve - Class - 1
Time off inspection observe job site close. violation condition observe sidewalk not maintain uneven sidewalk creating an tripping hazard for pedestrial . comply with code
Sep 10, 2022 · Penalty $2,500
Resolve - Class - 1
An active jobsite with rebar cutting (hot work) performed at the 2nd story, i observed fire slags were falling to the 1st floor below. i observed no fire watch at the 1st or 2nd story and no fire extinguisher i
Aug 12, 2022 · Penalty $6,250
Resolve - Class - 1
The site safety manager on record #m001586, at the time of inspection was not onsite and as per daily logs provided had not been onsite. logs dated from june 2022-august 12, 2022 indicates that ssm #2754, ssm #
Aug 12, 2022 · Penalty $6,250
Resolve - Class - 1
I observed that the yodocks in the street were not filled with water/sand and they were not interlocked as per manufactures specifications. this allowed pedestrians to breach the line of safety by walking throu
Aug 12, 2022 · Penalty $6,250
Resolve - Class - 2
28-104.7.11 failure to provide additional information.as noted at timeof inspection construction site was closed.observed 15 story concrete cast-in-place new building foundation wall rebar placement work in pro
Oct 26, 2021 · Penalty $3,125
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H9)
- Year built
- 2021
- Floors
- 15
- Residential units
- —
- Building area
- 40,903 ft²
- Lot area
- 4,400 ft²
- Zoning
- C6-4
- Community board
- 412
- Council district
- 27
- Block / lot
- 9993 / 1
- Assessed value
- $2,127,150
- Landmark / historic district
- No
Questions about 144-02 94 Avenue
Who owns 144-02 94 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Liverpool Realty LLC.
Does 144-02 94 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 144-02 94 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 144-02 94 Avenue built?
City records list 2021 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.