roofy

Violations at 83-10 84 Avenue

Queens, NY 11432 · BBL 4-09875-0001 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

The newest 50 of 51 DOB violations. The city keeps the complete history.

  • Construction other optional

    Borough commissioner has ordered work stopped for application # q00746736-i1 wroooo12439 due to general contractor withdrawal. stop all work immediately & make the site safe. please contact borough commissioner at 718-286-7670. swo notice # op-71-25-04546

    Dec 12, 2025

    Dob violation - dismissed
  • Construction other optional

    Borough commissioner has ordered work stopped for application # q00746736-i1 wroooo12439 due to general contractor withdrawal. stop all work immediately & make the site safe. please contact borough commissioner at 718-286-7670. swo notice # op-71-25-04546

    Dec 12, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 7, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 21, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 28, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 21, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 20, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 3, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 5, 2014

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 23, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 22, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 26, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 16, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 14, 2008

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 1, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2006

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Oct 1, 2005

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 17, 2005

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Nov 19, 2004

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2004

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 21, 2004

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 19, 2002

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 8, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Apr 20, 1998

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 6, 1998

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Construction other optional

    C-construction other optional

    May 30, 1996

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 8, 1996

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 17, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    May 31, 1994

    Dob violation - dismissed

ECB violations

The newest 50 of 103 ECB violations. The city keeps the complete history.

  • Class - 2

    At the time of my inspection construction work in progress, i observed open unenclosed perimeter work ongoing. i also observed that there were no guardrail systems in place on scaffolding, window opening and le

    Jul 1, 2026 · Penalty $5,000

    Resolve
  • Class - 1

    At time of inspection, i observed at premises construction work in progress during the after-hours work variance period. upon request for an after-hours work variance permit, none was provided. upon review of d

    Jul 1, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    Miscellaneous violations.bc 3314.1 scope scaffold:during inspection ofan sca project,i observed supported scaffold in place around the building.i noticed that the netting on the scaffold was dislodged,hanging,m

    May 1, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings.at time of inspection,contractor has failed to file a certificate of correction for violation

    Mar 4, 2026 · Penalty $1,280

    Active
  • Class - 2

    At time of inspection observed job site closed. the sidewalk shed installed on walkway at exposure 1, 2, missing project information panel/sidewalk shed parapet panel/construction sign not provided or not in co

    Feb 16, 2026 · Penalty $1,250

    Active
  • Class - 1

    Bc 3314.1 scope scaffold: during inspection of an sca project, i observed supported scaffold in place around the building. i noticed that the netting on the scaffold was dislodged, hanging, missing and blowing

    Jan 7, 2026 · Penalty $5,030

    Resolve
  • Class - 2

    Reissue #35677439z. failure to maintain building in code-compliant manner: illumination for exits, exit discharges and oublic corridor per bc 1006.1; 27-381. emergency light box #25, 24, 14, 23, 22, 20, 21, 16,

    May 12, 2025 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. emergency lights not working in auditorium unit 20 and 21 in rear and lights in girl bathroom 1st floor on new side of school. remedy: repair and/or replac

    May 28, 2024 · Penalty $625

    Resolve
  • Class - 2

    Temporary construction equipment on site expired permit fence.at time of inspection of active job site observed at exp #1 #2 construction fence in place permit #421100098 expired 4.25.22 not renewed.remedy:rene

    Apr 27, 2022

    Resolve
  • Class - 2

    Failure to maintain/display on site documents required by bc chapter 33.at time of inspection of active job site observed sws installed at exp #1 #2 request for 6 months inspection letter only one provided date

    Apr 27, 2022

    Resolve
  • Class - 2

    Bc3307.2.1 failure comply with dot regulations & street obstructions expired permit.at time of inspection of active jobsite observed at exp #3 material stored on street level enclosed with construction fence re

    Apr 27, 2022

    Resolve
  • Class - 1

    Bc3301.1.2 failure to comply with nyc fire code - expired permit.at time of inspection on active job site observed 2 cages within rear yard of exp #3 containing cylinders of compressed gases (1) 5 cylinders of

    Apr 27, 2022 · Penalty $625

    Resolve
  • Class - 1

    Failure to file evidence of compliance with workers comp,law and/or disability benefits law -expired insurance.at time of inspection of active job site observed workers engaged in construction activities of top

    Apr 27, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to file evidence of liability and/or property damage insurance-expired insurance.at time of inspection of active jobsite observed workers engaged in construction activities of topped off & enclosed 3 st

    Apr 27, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    28-301.1 reissue#35490883p 3/26/2020.failure to provide natural or mechanical ventilation to occupied spaces per mc401.2.at basement boiler room,2 snow blowers occupied within space without proper ventilation.

    Apr 12, 2022 · Penalty $3,125

    Resolve
  • Class - 2

    Bc3307.2.1 failure to comply with dot regulations as per 34 rcny 2-05 and admin code provisions 19-107 19-108 or 18-121.at time of inspection of 3 story new school building under construction observed street en

    Oct 6, 2021

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments.at time of inspection of 3 story new school building under construction observed supported scaffold at exp #1, #2, #3, #4 with

    Oct 6, 2021 · Penalty $625

    Resolve
  • Class - 2

    Project information panel/sidewalk shed parapet panel/construction sign not provided or not in compliance with section.at time of inspection of new public school building 3 story at exp #1-#3 sidewalk shed no p

    Aug 4, 2021

    Resolve
  • Class - 2

    Reissue#35490878k failure to maintain bldg in code compliant manner. room 211,218,215,220 has door wood peeling & room 211 need new door. remedy: repair &/or replace.

    Mar 9, 2021 · Penalty $1,562

    Resolve
  • Class - 2

    Reissue35490879m failure to maintain bldg in codecompliant manner.rm212,211,214,213,218,217,220,119,118,114,112,staircase gas meterrm&electricalrm has water penetration.repair &/or replace.

    Mar 9, 2021 · Penalty $1,562

    Resolve
  • Class - 2

    Reissue#35490880j exit door not self closing. 1st fl level near exit door 1 hallway corridors not self closing. remedy: repair/replace door.

    Mar 9, 2021 · Penalty $1,562

    Resolve
  • Class - 2

    Reissue#35490881l failure to maintain bldg walls or appurtenances. side of bldg water penetrating into classroom causing damage to walls & paint & windows in disrepair. remedy: maintain exterior bldg wall.

    Mar 9, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Sec. 28-301.1 failur to provide natural on mechanical ventilation to occupied spaces per mc401.2. note: observed at basement level storage room occupies w/1 tractor & 2 snow blower. remedy: remove gas equipment

    Mar 26, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Sec. 28-301.1 unlawful display of artwokr in corridors greater than 20% per fdny 2008 code;fc 803.3.2. note: observed artwork more than 20% on walls & doors throughout entire bldgs all floors. remedy: remove

    Mar 26, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain bldg walls or appurtenances. note: observed all for side of bldg water penetrating into class rooms causing damage to walls & paint. also observed windows in disrepair possible water penetra

    Mar 26, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Exit door not self closing. note: observed at 1st fl level near exit door 1,hallway corridors not self closing. remedy: repair/replace door.

    Mar 26, 2020 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. note: observed at class room 212,211,214,213,218,217,220,119,118,114,112,staircase b,gas meter & electric meter room has water peentration-at various location

    Mar 26, 2020 · Penalty $625

    Resolve
  • Class - 2

    Reissue#35326596h failure to maintain bldg in code compliant manner. note: observed at classroom 211,218,215,& 220 has door wood peeling & room 211 door is not good. remedy: repair &/or replace.

    Mar 26, 2020 · Penalty $1,562

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping as per section requirements.noted:at time of my inspection of a new 3 story building construction in progress,i observed numerous garage piles on floors 1 & 2 and the d

    Feb 12, 2020

    Resolve
  • Class - 1

    Bc 3307.5 failure to have flag person in place for sidewalk/street operations noted: @time of my inspection of a new 3 sty building const in progress, i observed a crane & truck with scaffolding delivering/

    Feb 12, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3301.1.2 failure to comply with n.y.c fire code- no fire watch noted: @time of my inspection of a new 3 sty building, const in progress, i observed a worker cutting metal from a door buk the ground floor lvl

    Feb 12, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    At time of inspectoin crane plan do not show pertinent feartures and actual site conditions required to be shown on documents for crane use.crane was setup outside the minimum distance shown on plan/cn with no

    Oct 1, 2019

    Resolve
  • Class - 1

    Permit holder: failed to ensure each construction or demolition worker successfully completed the required training under bc 3321.1: observed thomas gillard at building site for which a construction superinten

    Jun 21, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Owner failed to ensure each construction or demolition worker successfully completed the required training under bc 3321.1: observed thomas gillard at building site for which a construction superintendent ,ssm

    Jun 21, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. in door wood is peeling. room no. 211, 218, 215 and 220. room no 211 door is not good, wood is peeling. rem: repair and/or replace.

    Apr 12, 2018

    Resolve
  • Class - 2

    Failure to maintain building in a code-compliant manner. in door glass is missing in room no. 131, 123 and 228 glass is missing. now plexi-glass is used. rem: repair and/or replace.

    Apr 12, 2018

    Resolve
  • Class - 2

    Exit door not self-closing. exit 13 in cafeteria back side door not self closing at the time of inspection. rem: repair/replace door.

    Apr 12, 2018

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. no fire stopping per bc 712.3; 27-345. there are two electrical rooms in the cellar. fire stopping is not done properly. there needs to be fire stopping in

    Apr 12, 2018

    Resolve
  • Class - 2

    Reissue #35094313z date of issue 05.12.14. failure to maintain building wall(s) or appurtenances. water penetration into rooms 211 and 212 along east wall. rem: seal penetration.

    Apr 12, 2018

    Resolve
  • Class - 2

    28-301.1 reissue #35235702z date of issue 03-24-17. miscellaneous violation sec 28-301.1 portable fuel equipment. in cellar/boiler room w/storage of appears to be 10 law mowers/snow blowers per fdny 2014 fcb133

    Apr 12, 2018

    Resolve
  • Class - 1

    28-116.2.3. contractor has failed to notify the controlled inspector of record of tha start of const. work requiring controlled insp. @ the time of insp. it was observed that the contractor failed to notify the

    Aug 30, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Const. super fails to maintain &/or make job site logs available. @ the time of insp. it was observed that the registered const. super john scopellito wasn't on site nor was there any daily logs made available

    Aug 30, 2017 · Penalty $400

    Resolve
  • Class - 2

    Failure to provide approved/accepted const docs @ the job site @ the time of insp. @ the time of insp. it was observed that the contractor failed to provide dob approved docs/drawings @ the site upon request. r

    Aug 30, 2017 · Penalty $250

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. no fire stopping per bc712.3; 27-345. noted in cellar area above room g11, outside of cafeteria hallway. rmdy: provide/maintain fire stopping.

    Mar 27, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. note: exit#2,panic door is not in operational(left side). remedy: repair &/or replaces.

    Mar 24, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner: illuminated for exits,exit discharges & public corridors per bc 1006.1;27-381. noted: at the transportable(t6)a non working emergency light above entry door.

    Mar 24, 2017

    Resolve
  • Class - 2

    Sec. 28-301.1 portable fuel equipment. note: cellar boiler room w/storage of appear 10 lawn mowers/snow blower per fdny 2014;fc313.3. remedy: comply w/code.

    Mar 24, 2017

    Resolve
  • Class - 2

    Sec. 28-301.1 failure to maintain bldg in code compliant manner. unlawful placement/display of art work in hallways cloth/paper flags hung from walls & ceilings at 1st fl obstructing view of illuminated exit

    Mar 24, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner: illumination for exits,exit discharges & public corridors per bc 1006.1;27-381. noted: at the exit next to room 121 & stair#9 exit non working emergency lights

    Mar 24, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner:use of prohibited doors &/or hardware per bc1008.18; 27-371(j). note: @ time of insp doorslocated on 1st flr & 2nd flr. 112,114,128,131,129,130,212,218,219,229

    Apr 27, 2016

    Resolve