roofy

Violations at 87-55 124 Street

Queens, NY 11418 · BBL 4-09333-0057 · Back to the property

HPD housing violations

The newest 50 of 61 HPD violations. The city keeps the complete history.

  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3a, 3rd story

    Jul 11, 2026 · Apt 3A

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1l, 1st story, 1st apartment from south at west

    Aug 6, 2025 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 5th room from north located at apt 1l, 1st story, 1st apartment from south at west

    Aug 6, 2025 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Aug 6, 2025 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Aug 6, 2025 · Apt 1L

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Aug 6, 2025 · Apt 1L

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west

    Aug 6, 2025 · Apt 1L

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from south at west

    Aug 6, 2025 · Apt 1L

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from south at west

    Aug 6, 2025 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective wash basin cabinet in the bathroom located at apt 1l, 1st story, 1st apartment from south at west

    Aug 6, 2025 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective door in the bathroom located at apt 1l, 1st story, 1st apartment from south at west

    Aug 6, 2025 · Apt 1L

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroom located at apt 1l, 1st story, 1st apartment from south at west

    Aug 6, 2025 · Apt 1L

    Open — Nov sent out
  • BHazardous

    Trace and repair the source and abate the visible mold condition... greater then 10sq feet at the ceiling, south, and north walls in the bathroom located at apt 1l, 1st story, 1st apartment from south at west

    Aug 6, 2025 · Apt 1L

    Open — Defect letter issued
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2024

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2023

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective at vestibule door at public hall, 1st story

    Nov 3, 2023

    Closed — Violation closed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 28, 2023

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2022

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 4, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 4, 2022

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 15, 2021

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jun 3, 2019

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Jun 3, 2019

    Open — Nov sent out
  • BHazardous

    Remove all encumbrances consisting of household items at public hall, 1st story

    Jun 3, 2019

    Open — Nov sent out
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story

    Jun 3, 2019

    Open — Nov sent out
  • BHazardous

    Arrange and make self-closing the doors .. in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    Jun 3, 2019 · Apt 1R

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Jun 3, 2019 · Apt 1R

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Jun 3, 2019 · Apt 1R

    Open — Notice of issuance sent to tenant
  • BHazardous

    Properly repair the broken or defective cabinet at washbasin in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Jun 3, 2019 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tile floor in the kitchen located at apt 1r, 1st story, 1st apartment from east at south

    Jun 3, 2019 · Apt 1R

    Open — Nov sent out
  • CImmediately hazardous

    Replace with new the broken or defective glass at upper window sash at east wall in the kitchen located at apt 1r, 1st story, 1st apartment from east at south

    Jun 3, 2019 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tile west wall in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Jun 3, 2019 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Jun 3, 2019 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective base cabinet at north wall in the kitchen located at apt 1r, 1st story, 1st apartment from east at south

    Jun 3, 2019 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak over ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Jun 3, 2019 · Apt 1R

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective electric outlet at north wall in the kitchen located at apt 1r, 1st story, 1st apartment from east at south

    Jun 3, 2019 · Apt 1R

    Open — Nov sent out
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from east at south

    Jun 3, 2019 · Apt 1R

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 23, 2018

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Dec 6, 2017 · Apt 2L

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Dec 6, 2017 · Apt 2L

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 4, 2017

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2016

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 15, 2015

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 27, 2015

    Closed — Violation dismissed
  • BHazardous

    Remove all encumbrances consisting of household articles at 2nd story public hall.

    Aug 17, 2010

    Open — Nov sent out
  • CImmediately hazardous

    Provide ready access to buildings heating system lock door at bottom of stairs at cellar

    Apr 12, 2009

    Open — Nov sent out
  • BHazardous

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front west entrance of building

    Apr 12, 2009

    Open — Nov sent out

DOB building violations

3 DOB violations, newest first.

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 18, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 20, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 20, 2016

    Dob violation - dismissed

ECB violations

5 ECB violations, newest first.

  • Class - 1

    Removed or defaced a written posted vacate order.at time of inspectionvacate sticker was defaced.vacate sticker was posted 1-30-2016 by badge #2591.rem:comply with code.

    Jan 22, 2018 · Penalty $1,000

    Active
  • Class - 2

    Failure to comply w/the comm's order contained in nov #35166605k issued on 01/30/16 & to file a cert of correction pursuant to 28-201.1,28-204.4 & 1rcny 102-01.above nov for multiple dwelling occupied w/3 more

    Jun 18, 2016 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in nov #35166604z issued on 01/30/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. remedy: comply w/comm's order &/or file a c of c.

    Jun 4, 2016 · Penalty $800

    Resolve
  • Class - 1

    Multiple dwelling converted maintain or occupied w/ 3 or more additional dwelling units than legally authorized by the c of o or official records.noted dob records indicates residence 4 family,2 families per 1s

    Jan 30, 2016 · Penalty $2,430

    Resolve
  • Class - 1

    Work w/o a permit.noted @ cellar level erected full height partitions subdividing cellar creating 6 rooms for 2 class a apts w/ separated doors,windows,cinderblock/cement walls installed water & waste lines for

    Jan 30, 2016 · Penalty $1,630

    Resolve