91-35 86 Street
Queens, NY 11421BBL 4-08980-0048Map
Owner of record: Jin Xiang Tang
91-35 86 Street is a walk-up apartment building built in 1910 in Queens, 11421. It has 3 residential units across 2 floors. The owner of record is Jin Xiang Tang. HPD has recorded 29 housing violations here, most recently on June 16, 2022. 29 of the 29 most recent violations are still open.
- HPD violations
- 29
- DOB violations
- 1
- ECB violations
- 1
- HPD complaints
- 27
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 29
- CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the private hallway located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall, north wall, and south wall in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub perimeter in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - CImmediately hazardous
Repair the roof so that it will not leak over the ceiling in the private hallway located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment denied - BHazardous
Repair or replace the carbon monoxide detecting device(s). ; missing in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment denied - BHazardous
Abate the infestation consisting of vermin ; flies in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - ANon-hazardous
Refit door in the entrance located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment denied - BHazardous
Trace and repair the source and abate the visible mold condition... at north wall (approx. 10 sq. ft.) in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective grout between ceramic tiles at east wall, south wall, and north wall in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted
Show 19 more ↓
- CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment denied - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - BHazardous
Replace with new the broken or defective formica countertop and base cabinet at sink in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - BHazardous
Replace with new the broken or defective cabinet at north wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling, south wall, and east wall in the 1st room from east located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from east located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment denied - BHazardous
Replace the broken or defective wash basin in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - BHazardous
Replace the broken or defective water closet in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and all walls in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - BHazardous
Replace the broken or defective bathtub in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Jun 16, 2022 · Apt 2FL
Open — Certification postponment granted - BHazardous
Properly repair with similar material the broken or defective ceramic tile at south shower wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Jun 1, 2022 · Apt 2FLOOR
Open — Certification postponment granted - BHazardous
Replace with new the broken or defective exterior bell in the entrance located at apt 2floor, 2nd story, 1st apartment from north at east
Jun 1, 2022 · Apt 2FLOOR
Open — Certification postponment granted - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2floor, 2nd story, 1st apartment from north at east
Jun 1, 2022 · Apt 2FLOOR
Open — Certification postponment granted - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2floor, 2nd story, 1st apartment from north at east
Jun 1, 2022 · Apt 2FLOOR
Open — Certification postponment denied - BHazardous
Repair the roof so that it will not leak over ceiling in the entire apartment located at apt 2floor, 2nd story, 1st apartment from north at east
Jun 1, 2022 · Apt 2FLOOR
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the entire apartment located at apt 2floor, 2nd story, 1st apartment from north at east
Jun 1, 2022 · Apt 2FLOOR
Open — Certification postponment granted - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall in the 1st room from east at south located at apt 2floor, 2nd story, 1st apartment from north at east
Jun 1, 2022 · Apt 2FLOOR
Open — Certification postponment granted - BHazardous
Properly repair with similar material the broken or defective laminate wood floor in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Jun 1, 2022 · Apt 2FLOOR
Open — Certification postponment granted
DOB building violations · 1
- Construction other optional
C-construction other optional
Dec 21, 2001
Vw*-violation - work w/o permit dismissed
ECB violations · 1
- Hazardous
Work without permits. at cellar level erected full gight partitions creating 2 interion room plus kitchen area with exposed and uncapped water & waste lines. remedy: obtain permits or restore premises to prior
Dec 21, 2001
Resolve
Complaints
- Paint/plaster
Ceiling
Jul 7, 2022 · Apt 2NDFL
Close - Paint/plaster
Wall
Jul 7, 2022 · Apt 2NDFL
Close - Unsanitary condition
Pests
Jul 7, 2022 · Apt 2NDFL
Close - Paint/plaster
Wall
Jul 7, 2022 · Apt 2NDFL
Close - Flooring/stairs
Floor
Jul 7, 2022 · Apt 2NDFL
Close - General
Bell/buzzer/intercom
Jul 7, 2022 · Apt 2NDFL
Close - Unsanitary condition
Pests
Jun 13, 2022 · Apt 2FL
Close - Plumbing
Bathtub/shower
Jun 13, 2022 · Apt 2FL
Close - Plumbing
Bathtub/shower
Jun 13, 2022 · Apt 2FL
Close - Flooring/stairs
Floor
Jun 13, 2022 · Apt 2FL
Close
Show 17 more ↓
- Unsanitary condition
Pests
Jun 13, 2022 · Apt 2FL
Close - General
Bell/buzzer/intercom
Jun 13, 2022 · Apt 2FL
Close - General
Mailbox
Jun 13, 2022 · Apt 2FL
Close - General
Cabinet
Jun 13, 2022 · Apt 2FL
Close - Paint/plaster
Ceiling
Jun 13, 2022 · Apt 2FL
Close - Water leak
Damp spot
Jun 13, 2022 · Apt 2FL
Close - Flooring/stairs
Floor
Jun 13, 2022 · Apt 2FL
Close - General
Cabinet
May 29, 2022 · Apt 2FLOOR
Close - Paint/plaster
Ceiling
May 29, 2022 · Apt 2FLOOR
Close - Paint/plaster
Wall
May 29, 2022 · Apt 2FLOOR
Close - Plumbing
Bathtub/shower
May 29, 2022 · Apt 2FLOOR
Close - Plumbing
Toilet
May 29, 2022 · Apt 2FLOOR
Close - General
Bell/buzzer/intercom
May 29, 2022 · Apt 2FLOOR
Close - Heat/hot water
Entire building
Nov 10, 2021 · Apt 2FLOOR
Close - Unsanitary condition
Pests
Aug 23, 2021 · Apt 2NDFL
Close - Unsanitary condition
Mold
Aug 23, 2021 · Apt 2NDFL
Close - Paint/plaster
Ceiling
Aug 23, 2021 · Apt 2NDFL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1910
- Floors
- 2
- Residential units
- 3
- Building area
- 1,404 ft²
- Lot area
- 1,800 ft²
- Zoning
- R3-1
- Community board
- 409
- Council district
- 32
- Block / lot
- 8980 / 48
- Assessed value
- $46,320
- Landmark / historic district
- No
Questions about 91-35 86 Street
Who owns 91-35 86 Street?
The owner of record in NYC Department of City Planning PLUTO data is Jin Xiang Tang.
Does 91-35 86 Street have violations?
Yes. NYC HPD has recorded 29 housing violations at this property.
Is 91-35 86 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 91-35 86 Street built?
City records list 1910 as the year it was built.
How many apartments are in 91-35 86 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.