Violations at 220-10 Hillside Avenue
Queens, NY 11427 · BBL 4-07945-0002 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
31 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 14, 2016
Dob violation - resolved - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 25, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 10, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 20, 2000
Dob violation - active - Construction other optional
C-construction other optional
Sep 20, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - active
ECB violations
5 ECB violations, newest first.
- Class - 2
B254,34a,38,50a,50b,50c b254-50 a)no storage in boiler room b)no support on water pipes c)lights do not work in boiler room. remedy:correct all violating conditions and submit a certificate of correction
Jul 16, 2018 · Penalty $3,125
Active - Class - 1
Operation of a place of assembly w/o a current cert of operation noted bldg occupies as eating and drinking establish place of assembly w/ a valid cert of operation available or posted w/ sitting arrangement fo
Apr 14, 2012 · Penalty $1,600
Active - Class - 1
New building or open lot occupied w/o a valid c of o noted building under temporary (90 days) c of o #q83299 dates 8/7/52 to be used as store #13 expired . now occupies as eating & drinking establishment w/sitt
Apr 14, 2012
Resolve - Non-hazardous
Failure to maintain premises. noted: at front door & rear of a 1-storycommercial space, defective roof has caused water leaking into interior ceiling at several locations near electrical panel & devices. remedy
Feb 26, 2007 · Penalty $350
Resolve - Non-hazardous
Operation of pa without a crrent permit remedy obtain a current permitexit door swings against flow of egress at rear screen door remedy remove screen door fom exit plans prodced
Oct 2, 1990 · Penalty $115
Resolve